ATTACHMENT I

Electric Service Statement of Requirements Electric Utility Service FCC Coleman

I. General Requirements

The Federal Correctional Complex Coleman is located in Coleman, Florida. The provision of electric service is essential for the orderly operation of FCC Coleman, which is designed to collectively house a rated capacity of approximately 6,900 inmates. The complex consists of a Central Administration Building, FCI Coleman Low, FCI Coleman Medium, USP 1 Coleman, USP 2 Coleman and a FPC Coleman Camp as well as additional support buildings such as food service and institutional warehouses.

II. Electric Service

(a) The contractor shall provide to the Government facility permanent electric service in a manner and form that is consistent with (1) all applicable laws, regulations, permits, and electrical codes, and (2) the facility’s service requirements.

The estimated annual service requirements are:

Maximum demand 15,000 KW per month

Total annual energy consumption 180,000 KW Total estimate for the entire contract is 1,800,000 KW

The usage amounts shown in this paragraph are estimates only and do not constitute a Government guarantee.

(b) The Contractor shall furnish to FCC Coleman an underground, 3- phase, Wye-connected, 60 Hertz, electric service capable of serving an estimated demand of 15,000 KW. The normal delivery voltage for both penitentiaries is 12,470v. The normal delivery voltage for all other facilities on the complex is 277/480v. All meters shall be installed by the Contractor in a manner that allows verification of billing determinants by Government personnel. The Contractor shall provide, own, and maintain facilities necessary to satisfy the service requirements of the facility. The Contractor is responsible for monitoring accuracy of the metering equipment.

(c) The point of service connection between FCC Coleman and the Contractor’s system, as well as any connecting facilities is to be installed by the Contractor on Government premises. The Contractor shall deliver the required electrical service to FCC Coleman through electric meter(s) at the point of connection.

File details come from the government source that posted it.