CMT_STATEMENT_OF_WORK_SERO_FY-2018_1.docx

DOCX document 15 KB Posted

Attached to
Crisis Management Training Accommodations
Solicitation number
15B30018Q00000001
Issued by

About this file

Statement of Work Crisis Management Training

View the file

Other files

File Type Posted
Solicitation_15B30018Q00000001__CMT_RFQ_2018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(Crisis Management Training)

A. SERVICES TO BE PERFORMED:

The Southeast Regional Office, Atlanta Georgia located at 3800 Camp Creek Parkway, Building 2000, Atlanta, GA 30331, hereinafter referred to as SERO, intends to make a single award for Crisis Management Training Site Accommodations.

B. PERIOD OF PERFORMANCE:

The rental period will be from September 10, 2018 thru September 14, 2018.

C. ACCOMMODATION OF TRAINING SCHEDULE:

Contractor must be able to accommodate all of the training areas listed on the attached request
for quote on the specified dates. The request for quote also includes information as to the
estimated number of participants.

Contractor must take note of periods in the training where multiple training will be held concurrently and must address in their response the ability to accommodate such training.

Training Areas Class Rooms Firing Ranges

D. SECURITY REQUIREMENTS:

Contractor will be required to meet all security requirements of the Southeast Regional Office.

E. ADMINISTRATIVE SUPPORT:

Contractor must be able to provide the following;

Range Control
Emergency Medical Technician (s)
Role Players

F. LOCATION:

Contractor must be located within 150 miles of the Southeast Regional Office, located at
3800 Camp Creek Parkway, Building 2000, Atlanta, Georgia 30331.

G. LODGING:

Contractor must have dorm style rooms able to accommodate a minimum total of 320 staff members for four (4) days, dorms must be separate male and female sleeping areas.

Participant lodging dorms must include one sleeping cot/bed per staff member and include rest room and shower facilities.

H. MEALS:

Training participants shall be provided three daily meals (breakfast, lunch and evening dinner), to include at least two hot entrée choices per meal. The first meal served shall be the evening meal on the day participants arrive and the last meal served shall be lunch on the closing day of the training.

Quote must include the type of meal service to be provided – sit down service, buffet or cafeteria – as well as any restrictions on meals (times, locations, etc.) imposed by the facility.

Quote shall include an indication of the facility’s ability to serve and accommodate approximately 320 people.

Quote must address ability to accommodate special dietary needs (vegetarian, diabetic, religious, etc.) and specify the procedures for such diet request.

I. EVALUATION:

Along with price and technical acceptability, past performance will be evaluated as part of a responsibility determination

Internal Billing To: Financial Management

J. SERO POINT OF CONTACT: James W. Winds, Regional Procurement & Property Specialist

K. SCHEDULE SERVICE:

September 10, 2018 through September 14, 2018.

File details come from the government source that posted it.