Quote submittal 15B21826Q00000028.pdf

PDF 140 KB Posted

Attached to
FY26 FCI Berlin Remove and Replacement of Six (6)Dock Levelers
Solicitation number
15B21826Q00000028
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Federal Bureau of Prisons for FCI Berlin in Berlin, New Hampshire.

The RFQ solicits quotations for the removal and replacement of six (6) 6x8 hydraulic dock levelers at FCI Berlin. The procurement is divided into three line items: (1) supply of six new hydraulic dock levelers (PSC 3950), (2) labor services including removal and disposal of existing levelers, disconnection of electrical connections, concrete repairs, installation of new levelers, and electrical work (PSC J039), and (3) freight charges (PSC V112). All work is to be performed between September 4, 2026, and September 30, 2026. The RFQ is issued on a firm fixed price basis with no prompt payment discounts offered. Quotations are due by September 3, 2026, at 8:00 AM Eastern Time to Kayleigh Chaloux at FCI Berlin. Delivery is FOB destination to the facility in Berlin, New Hampshire. This is not a small business set-aside. The contract incorporates numerous FAR and DOJ-specific clauses addressing compliance requirements including whistleblower protections, contractor employee security and privacy requirements, information security standards, personnel background investigations, and cybersecurity obligations. The RFQ also includes provisions for personnel security vetting, DOJ information handling protocols, and incident reporting procedures for contractor employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15B21826Q00000028 Page 1 of 29

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDEX

PAGE OF PAGES

1 29

1. REQUEST NO.

15B21826Q00000028

2. DATE ISSUED

08/27/2026

3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2 AND/

OR DMS REG. 1

RATING

Federal Bureau of Prisons FCI Berlin 1 Success Loop Road Berlin, NH 03570

5a. ISSUED BY 6. DELIVER BY (Date)

7. DELIVERY

OTHER

(See Schedule)

FOB DESTINATION X

9. DESTINATION

5b. FOR INFORMATION CALL (NO COLLECT CALLS) a. NAME OF CONSIGNEE

NAME

Kayleigh Chaloux kchaloux@bop.gov

TELEPHONE NUMBER

AREA CODE

NUMBER

342-4024 Ext.:

8. TO:

b. STREET ADDRESS

c. CITY

a. NAME b. COMPANY

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

09/03/2026 08:00 ET

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

FY26 FCI Berlin six (6) Hydraulic dock removal and replacements Firm Fixed Price

See Continuation Sheet(s)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%)

0.00 %

b. 20 CALENDAR DAYS (%)

0.00 %

c. 30 CALENDAR DAYS (%)

0.00 %

d. CALENDAR DAYS

NUMBER

PERCENTAGE

0.00 NOTE: Additional provisions and representations [ X ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

15. DATE OF

QUOTATION

a. NAME OF QUOTER

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

15B21826Q00000028 Page 2 of 29

Section 1 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Six (6) 6x8 Hydraulic dock levelers

PSC: 3950

Line Period of Performance: 09/04/2026 - 09/30/2026

6 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Labor to include: removal and disposal (off site) of existing dock levelers and outdated components, disconnect all electrical connections, necessary concrete repairs for proper mounting, install six (6) new levelers, and electrical work.

PSC: J039

Line Period of Performance: 09/04/2026 - 09/30/2026

1 $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Freight

PSC: V112

Line Period of Performance: 09/04/2026 - 09/30/2026

1 $________ $_________________

15B21826Q00000028 Page 3 of 29

Section 2 - Contract Clauses

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.204-9 Personal Identity Verification of Contractor Personnel

(Jan 2011)

52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018)

(DEVIATION NOV 2025)

52.209-6 (DEV) Protecting the Government's Interest When

Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan

2025) (DEVIATION NOV 2025)

52.209-10 (DEV) Prohibition on Contracting With Inverted Domestic

Corporations (Nov 2015) (DEVIATION NOV 2025)

52.222-3 (DEV) Convict Labor (June 2003) (DEVIATION DEC 2025)

52.222-19 (DEV) Child Labor-Cooperation with Authorities and Remedies

(Jan 2025) (DEVIATION MAR 2026)

52.222-35 (DEV) Equal Opportunity for Veterans (Jun 2020) (DEVIATION

DEC 2025)

52.222-36 (DEV) Equal Opportunity for Workers with Disabilities (Jun

2020) (DEVIATION DEC 2025)

52.222-37 (DEV) Employment Reports on Veterans (Jun 2020)

(DEVIATION DEC 2025)

52.222-41 (DEV) Service Contract Labor Standards (Aug 2018)

(DEVIATION DEC 2025)

15B21826Q00000028 Page 4 of 29

Clause Title Fill-ins (if applicable)

52.222-50 (DEV) Combating Trafficking in Persons (Oct 2025)

(DEVIATION DEC 2025)

52.222-62 (DEV) Paid Sick Leave Under Executive Order 13706 (Jan

2022) (DEVIATION DEC 2025)

52.223-23 (DEV) Sustainable Products (May 2024) (DEVIATION DEC

2025)

52.225-3 (DEV) Buy American-Free Trade Agreements-Israeli Trade Act

(Nov 2023) (DEVIATION DEC 2025)

52.226-8 Encouraging Contractor Policies To Ban Text

Messaging While Driving (May 2024)

52.232-33 Payment by Electronic Funds Transfer-System for

Award Management (Oct 2018)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Mar 2023)

52.233-3 (DEV) Protest after Award (Aug 1996) (DEVIATION NOV 2025)

52.233-4 (DEV) Applicable Law for Breach of Contract Claim (Oct 2004)

(DEVIATION NOV 2025)

Clauses By Full Text

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies established at 41 U.S.C. 4712 and Federal Acquisition Regulation (FAR) 3.900 through 3.905.

(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in FAR 3.900 through 3.905.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts.

(End of clause)

52.212-4 (DEV) Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) (DEVIATION NOV 2025)

(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of

15B21826Q00000028 Page 5 of 29 nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

15B21826Q00000028 Page 6 of 29

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable;

(D) Contractor point of contact; and

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(5) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C.

7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.

15B21826Q00000028 Page 7 of 29

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation;

and 41 U.S.C. chapter 21 relating to procurement integrity.

(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services;

(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) Other contract clauses incorporated in the solicitation or contract;

(4) Addenda to this solicitation or contract;

(5) Solicitation provisions incorporated in the solicitation;

(6) Other paragraphs of this clause;

(7) Other documents, exhibits, and attachments; and

15B21826Q00000028 Page 8 of 29

(8) The specification.

(s) Unauthorized obligations.

(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)

(a) Definitions. As used in this clause— Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

15B21826Q00000028 Page 9 of 29

(b) In connection with the performance of work under this contract, the Contractor agrees as follows:

(1) The Contractor will not engage in any racially discriminatory DEI activities;

(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;

(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer;

and

(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

52.232-18 Availability of Funds (Apr 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

DOJ-01 Whistleblower Information Distribution (Oct 2021)

Within 30 days of contract award, the contractor and its subcontractors must distribute the “Whistleblower Information for Employees of DOJ Contractors, Subcontractors, Grantees, or Sub-Grantees or Personal Services Contractors” (“Whistleblower Information”) document to their employees performing work in support of the products and services delivered under this contract (https://oig.justice.gov/sites/default/files/2020-04/NDAA-brochure.pdf). By agreeing to the terms and conditions of this contract, the prime contractor acknowledges receipt of this requirement, in accordance with 41 U.S.C. § 4712 and FAR

3.906 & 52.203-17, and commits to distribution. Within 45 days of award, the contractor must provide confirmation to the contracting officer verifying that it has distributed the whistleblower information as required.

(End of Clause)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

A. Limiting Access to Privacy Act and Other Sensitive Information

(1) Privacy Act Information

In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act

15B21826Q00000028 Page 10 of 29 information may be found at https://www.justice.gov/opcl/doj-systems-records.[1] Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.

(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment

Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.

(3) Prior Approval Required to Hire Subcontractors

The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

(4) Separation Checklist for Contractor Employees

The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1) return of any Government-furnished equipment; (2) return or proper disposition of personally identifiable information (PII)[2], in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.

In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).

Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.

B. Privacy Training, Safeguarding, and Remediation

(1) Required Security and Privacy Training for Contractors

The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII. These courses, along with more information about DOJ security and training requirements for Contractors, are available at https://www.justice.gov/jmd/learndoj.

The Federal Information Security Modernization Act of 2014 (FISMA) requires all individuals accessing DOJ information to complete training on records management, cybersecurity awareness, and information system

15B21826Q00000028 Page 11 of 29 privacy awareness. Contractor employees are required to sign the “Privacy Rules of Behavior,” acknowledging and agreeing to abide by privacy law, policy, and certain privacy safeguards, prior to accessing DOJ information. These Rules of Behavior are made available to all new users of DOJ’s computer network and to trainees at the conclusion of DOJ-OPCL-CS-0005.

The Contractor should maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required privacy and cybersecurity training.

(2) Safeguarding PII Requirements

Contractor employees must comply with DOJ Order 0904 and other guidance published to the publicly-available Office of Privacy and Civil Liberties (OPCL) Resources page[3] relating to the safeguarding of PII, including the use of additional controls to safeguard sensitive PII (e.g., the encryption of sensitive PII). This requirement flows down from the Prime Contractor to all Subcontractors and lower tiered subcontracts.

(3) Non-Disclosure Agreement Requirement

Prior to commencing work, all Contractor personnel that may have access to PII or other sensitive information shall be required to sign a Non-Disclosure Agreement (NDA) and the DOJ IT Rules of Behavior. The Non-Disclosure Agreement:

(a) prohibits the Contractor from retaining or divulging any PII or other sensitive information, or derivatives therefrom, furnished by the Government or to which they may otherwise come in contact as a result of their performance of work under the contract/task order that is otherwise not publicly available, whether or not such information has been reduced to writing; and

(b) requires the Contractor to report any loss of control, compromise, unauthorized disclosure, or unauthorized acquisition of PII or other sensitive information to the component-level or headquarters Security Operations Center within one (1) hour of discovery.

The Contractor should maintain signed copies of the NDA for all employees as a record of compliance. The Contractor should also provide copies of each employee’s signed NDA to the Contracting Officer before the employee may commence work under the contract/task order.

(4) Prohibition on Use of PII in Vendor Billing and Administrative Records

The Contractor’s invoicing, billing, and other financial or administrative records or databases is not authorized to regularly store or include any sensitive PII or other confidential government information that is created, obtained, or provided during the performance of the contract without the written permission of the Senior Component Official for Privacy (SCOP). It is acceptable to list the names, titles and contact information for the Contracting Officer, COR, or other personnel associated with the administration of the contract in the invoices as needed.

(5) Reporting Actual or Suspected Data Breach

Contractors must report any actual or suspected breach of PII within one hour of discovery.[4] A “breach” is an incident or occurrence that involves the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where: (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose.

The report of a breach must be made to DOJ. The Contractor must cooperate with DOJ’s inquiry into the incident and efforts to minimize risks to DOJ or individuals, including remediating any harm to potential victims.

(a) The Contractor must develop and maintain an internal process by which its employees and Subcontractors are trained to identify and report the breach, consistent with DOJ Instruction 0900.00.01[5], Reporting and Response Procedures for a Breach of Personally Identifiable Information.

(b) The Contractor must report any such breach by its employees or Subcontractors to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000); Component-level Security Operations Center and Component-level Management Team, where appropriate; the COR; and the Contracting Officer within one (1) hour of the initial discovery.

15B21826Q00000028 Page 12 of 29

(c) The Contractor must provide a written report to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000) within 24 hours of discovery of the breach by its employees or Subcontractors. The report must contain the following information:

(i) Narrative or detailed description of the events surrounding the suspected loss or compromise of information.[6] Date, time, and location of the incident.

(ii) Amount, type, and sensitivity of information that may have been lost or compromised, accessed without authorization, etc.

(iii) Contractor’s assessment of the likelihood that the information was compromised or lost and the reasons behind the assessment.[7]

(iv) Names and classification of person(s) involved, including victim, Contractor employee/Subcontractor and any witnesses.

(v) Cause of the incident and whether the company’s security plan was followed and, if not, which specific provisions were not followed.[8]

(vi) Actions that have been or will be taken to minimize damage and/or mitigate further compromise.

(vii) Recommendations to prevent similar situations in the future, including whether the security plan needs to be modified in any way and whether additional training may be required.

(d) The Contractor shall provide full access and cooperation for all activities determined by the Government to be required to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents.

(e) At the Government’s discretion, Contractor employees or Subcontractor employees may be identified as no longer eligible to access PII or to work on that contract based on their actions related to the loss or compromise of PII.

(6) Victim Remediation

At DOJ’s request, the Contractor is responsible for notifying victims and providing victim remediation services in the event of a breach of PII held by the Contractor, its agents, or its Subcontractors, under this contract. Victim remediation services shall include at least 18 months of credit monitoring and, for serious or large incidents as determined by the Government, call center help desk services for the individuals whose PII was lost or compromised. When DOJ requests notification, the Department Chief Privacy and Civil Liberties Officer and SCOP will direct the Contractor on the method and content of such notification to be sent to individuals whose PII was breached. By performing this work, the Contractor agrees to full cooperation in the event of a breach.

The Contractor should be self-insured to the extent necessary to handle any reasonably foreseeable breach, with another source of income, to fully cover the costs of breach response, including but not limited to victim remediation.

C. Government Records Training, Ownership, and Management

(1) Records Management Training and Compliance

(a) The Contractor must ensure that all employees and Subcontractors that have access to PII as well as to those involved in the creation, use, dissemination and/or destruction of PII take the DOJ Records and Information Training for New Employees (RIM) training course or another training approved by the Contracting Officer or COR.

This training will be provided at the outset of the Subcontractor’s/employee’s work on the contract and every year thereafter. The Contractor shall maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required records management training.

(b) The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records containing PII and those covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format, mode of transmission, or state of completion.

(2) Records Creation, Ownership, and Disposition

15B21826Q00000028 Page 13 of 29

(a) The Contractor shall not create or maintain any records not specifically tied to or authorized by the contract using Government IT equipment and/or Government records or that contain Government Agency information.

The Contractor shall certify, in writing, the appropriate disposition or return of all Government information at the conclusion of the contract or at a time otherwise specified in the contract. In accordance with 36 CFR 1222.32, the Contractor shall maintain and manage all Federal records created in the course of performing the contract in accordance with Federal law. Records may not be removed from the legal custody of DOJ or destroyed except in accordance with the provisions of the agency records schedules.

(b) Except as stated in the Performance Work Statement and, where applicable, the Contractor’s Commercial License Agreement, the Government Agency owns the rights to all electronic information (electronic data, electronic information systems or electronic databases and all supporting documentation and associated metadata created as part of this contract. All deliverables (including all data and records) under the contract are the property of the U.S. Government and may be considered federal records, for which the Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

(c) The Contractor shall not retain, use, sell, disseminate, or dispose of any government data/records or deliverables without the express written permission of the Contracting Officer or Contracting Officer’s Representative. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. § 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the Agency records schedules.

D. Data Privacy and Oversight

(1) Restrictions on Testing or Training Using Real Data Containing PII

The use of real data containing PII from any source for testing or training purposes is generally prohibited. The Contractor shall use synthetic or de-identified real data for testing or training whenever feasible.

(2) Requirements for Contractor IT Systems Hosting Government Data

The Contractor is required to obtain an Authority To Operate (ATO) for any IT environment owned or controlled by the Contractor or any Subcontractor on which Government data shall reside for the purposes of IT system development, design, data migration, testing, training, maintenance, use, or disposal.

(3) Requirement to Support Privacy Compliance

(a) If this contract requires the development, maintenance or administration of information technology[9], the Contractor shall support the completion of the Initial Privacy Assessment (IPA) document, if requested by Department personnel. An IPA is the first step in a process to identify potential privacy issues and mitigate privacy risks. The IPA asks basic questions to help components assess whether additional privacy protections may be needed in designing or implementing a project[10] to mitigate privacy risks, and whether compliance work may be needed. Upon review of the IPA, the OPCL determines whether a Privacy Impact Assessment (PIA) document and/or SORN, or modifications thereto, are required. The Contractor shall provide adequate support to complete the applicable risk assessment and PIA document in a timely manner, and shall ensure that project management plans and schedules include the IPA, PIA, and SORN (to the extent required) as milestones. Additional information on the privacy compliance process at DOJ, including IPAs, PIAs, and SORNs, is located on the DOJ OPCL website (https://dojnet.doj.gov/privacy/), including DOJ Order 0601, Privacy and Civil Liberties. The Privacy Impact Assessment Guidance and Template outline the requirements and format for the PIA.

(b) If the contract involves an IT system build or substantial development or changes to an IT system that may require privacy risk assessment and documentation, the Contractor shall provide adequate support to DOJ to ensure DOJ can complete any required assessment, and IPA, PIA, SORN, or other supporting documentation to support privacy compliance. The Contractor shall work with personnel from the program office, OPCL, the Office of the Chief Information Officer (OCIO), and the Office of Records Management and Policy to ensure that the privacy assessments and documentation are kept on schedule, that the answers to questions in the documents are thorough and complete, and that questions asked by the OPCL and other offices are answered in a timely fashion.

The Contractor must ensure the completion of required PIAs and documentation of privacy controls consistent with

15B21826Q00000028 Page 14 of 29 federal law and standards, e.g. NIST 800-53, Rev. 5; and compliance with the Privacy Act of 1974, E-Government Act of 2002, Federal Information Security Modernization Act of 2014, and key OMB guidelines, e.g., OMB Circular A-130.

[1] “[T]he term ‘record’ means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, his education, financial transactions, medical history, and criminal or employment history and that contains his name, or the identifying number, symbol, or other identifying particular assigned to the individual, such as a finger or voice print or a photograph.” 5 U.S.C. § 552a(a)(4). “[T]he term ‘system of records’ means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.” 5 U.S.C. § 552a(a)(5).

[2] As stated in FAR 52.224-3 and Office of Management and Budget (OMB) Circular A-130, Managing Federal Information as a Strategic Resource (2016), “’personally identifiable information’ means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual.” Regarding “sensitive PII,” “[t]he sensitivity level of the PII will depend on the context, including the purpose for which the PII is created, collected, used, processed, stored, maintained, disseminated, disclosed, or disposed. For example, the sensitivity level of a list of individuals’ names may depend on the source of the information, the other information associated with the list, the intended use of the information, the ways in which the information will be processed and shared, and the ability to access the information.” OMB Circular A-130, at App. II-2.

[3] The DOJ OPCL Resources page is available at https://www.justice.gov/opcl/resources.

[4] As stated in DOJ Instruction 0900, “Contractors must notify the Contracting Officer, the Contracting Officer’s Representative, and JSOC (or component-level SOC) within 1 hour of discovering any incidents, including breaches, consistent with this Instruction, guidance issued by the CPCLO, NIST standards and guidelines, and the US-CERT notification guidelines.”

[5] https://www.justice.gov/file/4336/download [6] As stated in DOJ Instruction 0900, the description should include the type of information that constitutes PII; purpose for which PII is collected, maintained, and used; extent to which PII identifies a peculiarly vulnerable population; the determination of whether the information was properly encrypted or rendered partially or completely inaccessible by other means; format of PII (e.g., whether PII was structured or unstructured); length of time PII was exposed; any evidence confirming that PII is being misused or that it was never accessed.

[7] As stated in DOJ Instruction 0900, the report should include the nature of the cyber threat (e.g., Advanced Persistent Threat, Zero Day Threat, data exfiltration) for cyber incidents.

[8] As stated in DOJ Instruction 0900, the report should include analysis on whether the data is accessible, usable, and intentionally targeted.

[9] As defined in 40 U.S.C. § 11101, the term “information technology” means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use (i) of that equipment or (ii) of that equipment to a significant extent in the performance of a service or the furnishing of a product; includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but does not include any equipment acquired by a federal contractor incidental to a federal contract.

[10] In this instance, the term “project” is used to scope the activities (e.g., creating, collecting, using, processing, storing, maintaining, disseminating, disclosing, or disposing of information) covered by an IPA. A project is intended to be technology-neutral, and may include an information system, a digital service, an information technology, a combination thereof, or some other activity that may create potential privacy issues or privacy risks that would benefit from an IPA. The scope of a project covered by an IPA is discretionary, but components should work with their SCOP and OPCL.

(End of Clause)

DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021)

Work performed under this contract will involve any one or more of the following: access to DOJ Information, which may include Controlled Unclassified Information (CUI), i.e., unclassified, sensitive DOJ information, and/or access to DOJ Information Technology (IT) systems, and/or unescorted access to DOJ space or facilities. Contractor employees will occupy Public Trust Positions, unless clause alternates are applied.

1. General Requirements

15B21826Q00000028 Page 15 of 29

(a) (1) All references to “contract(or) personnel” and “contract(or) employee” in this clause means all individuals, without limitation, to include individuals employed by the contractor, team member, subcontractor, consultant, and/or independent contractor, who will have access to information of the Department of Justice (DOJ) or information that is within the custody and control of the DOJ, access to DOJ IT systems, and/or unescorted access to DOJ facilities/space in connection with the performance of this contract. “Employment” as used herein does not create nor imply an employer/employee relationship between the DOJ and contractor employees.

(b) (1) The type of security investigation required for each contractor employee will be governed by the type and risk level of information made available to the contractor employee. The contractor will not be permitted to commence performance under this contract until a sufficient number of its personnel, as determined by the Security Programs Manager (SPM), in consultation with the Contracting Officer’s Representative if one is appointed, have received the requisite security approval.

(c) Except where specifically noted otherwise, the federal government will be responsible for the cost and conduct of the investigation.

(d) The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .