This document is an amendment to a solicitation for replacing a powerhouse boiler at the United States Penitentiary in Canaan, Pennsylvania. The amendment incorporates updated wage determinations, site visit meeting minutes, and responses to questions from prospective offerors. Specifically, it replaces the previous wage rate determination with a newer version dated June 4, 2021. It also includes seven pages of site visit meeting minutes and answers one question, clarifying that past performance evaluations referenced in proposals should relate to relevant experience as a prime contractor rather than as a subcontractor. The solicitation is being conducted by the Department of Justice Bureau of Prisons Field Acquisition Office to replace a boiler at USP Canaan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract.pdf | ||
| Amendment 00001 - site visit.pdf | ||
| 1 - Instruction to Bidders.pdf | ||
| 2 - Solicitation.pdf | ||
| 5 - Construction Wage Rates.pdf | ||
| 6 - SF-24 Bid Bond Form (blank).pdf | ||
| 7 - Criminal History Check Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15B21521B00000001 00002
REPLACE POWERHOUSE BOILER #1
USP CANAAN
The following changes are made to the Solicitation:
SF-1442 SOLICITATION
1. Remove previous wage rate and incorporate PA20210072 – Dated 6/04/2021 (7 pages).
The following are incorporated in to the Solicitation:
1. Site Visit Meeting Minutes (7 pages)
2. Questions and Responses (1 page)
NO OTHER CHANGES ARE MADE AT THIS TIME.
Attachments
QUESTIONS AND ANSWERS
USP CANAAN
15B21521B0000001 - PROJECT 2D9X
Request 1: Could a contractor, currently bidding as a prime contractor, submit a past performance questionnaire with reference to past a BOP project where it worked as a sub-contractor that performed a majority of that contract’s scope of work?
Response 1: We are looking for past performance as a prime as the past performance questionnaire addresses more than just the quality of work. See Instruction to Bidders Past performance Information Required Section 1. for additional information.