Bid_Results.pdf

PDF 6 KB Posted

Attached to
FCI Fairton, Replace Perimeter Fence
Solicitation number
15B20418B00000001
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers.pdf PDF
Amendment_00003.pdf PDF
Amendment_00002.pdf PDF
FAI_Fence_Pre-Bid-Site_Mtg_Minutes.pdf PDF
Amendment_00001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Results for 15B20418B00000001

FCI Fairton, Replace Perimeter Fence

1. Florida Detention Systems, Inc.

Total Base Bid Amount: $7,400,000.00

DEDUCT - Alternate 1 ($22,800.00)

DEDUCT - Alternate 2

2A. ($394,000.00)

2B. ($112,650.00)

2C. ($732,600.00)

2. Ameristar Contracting Group, Inc.

Total Base Bid Amount: $8,989,000.00

DEDUCT - Alternate 1 ($23,000.00)

DEDUCT - Alternate 2

2A. ($386,000.00)

2B. ($110,000.00)

2C. ($737,000.00)

File details come from the government source that posted it.