Questions_and_Answer_Construction_Danbury_Response.pdf
PDF 48 KB Posted
- Attached to
- Abate Asbestos Auditorium at FCI Danbury Federal contract opportunity
- Solicitation number
- 15B20318B00000004
About this file
Questions and Answer
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract1.pdf | ||
| AMEND_0003_Danbury.pdf | ||
| AMEND_0002_Danbury.pdf | ||
| AMEND_0001_Danbury.pdf | ||
| 4_-_Davis_Bacon_Wage_Rate_1.pdf | ||
| Pre_Bid_Site_Visit_Meeting_Minutes-_Asbestos_Auditorium.pdf | ||
| Site_Visit_Sign_In_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI DANBURY – ABATE ASBESTOS AUDITORIUM
PROJECT 2C6W QUESTIONS & ANSWERS
SOLICITATION 15B20318B00000004
NEW ENGLAND YANKEE CONSTRUCTION:
1. Is there a fee to the contractor for the security clearances, also is there a site that give the parameters of who would be accessible?
CLARIFICATION: No
2. As discussed on site do we dispose of the entire, drop ceiling as asbestos debris or will you give a directive on what is positive and what is not?
CLARIFICATION: Refer to S.O.W. page 1 section 3(a).
3. Where is the closest bathroom if we can’t use the one inside the work containment, area CLARIFICATION: There is a restroom in the area. If that one can’t be used, staff escort will be provided to escort the worker to one that works.
4. Just to confirm there will be laydown area outside rear gate for our asbestos/storage dumpster CLARIFICATION: Yes, there will be a laydown area, outside the rear gate.
5. If we bring in a gang box with two different locks can this be left inside with our hand tools over night?
CLARIFICATION: Refer to S.O.W. page 3 section 7.
6. To confirm we will be removing this whole ceiling, plaster, system lath, brown and finish coat CLARIFICATION: Refer to S.O.W. page 1 section 3(a).