WEEKLY DELIVERY SCHEDULE-BREAD.pdf
PDF 166 KB Posted
- Attached to
- FCI MANCHESTER FY25 4TH QTR BREAD Federal contract opportunity
- Solicitation number
- 15B11025Q00000009
About this file
This document is a Delivery Schedule for bread products at the Federal Correctional Institution (FCI) Manchester for the fourth quarter of Fiscal Year 2025. The solicitation requires weekly delivery of bread products from July 1st through September 30th, 2025, with specific delivery requirements including:
Delivery must occur between 7:30 am and 2:00 pm EST, with deliveries palletized and subject to strict temperature controls (34-41 degrees F for non-frozen perishables, 0 degrees F for frozen items). The Food Service Department will contact the vendor weekly to specify quantities needed. Vendors must meet precise specifications, with potential consequences for non-compliance including refusal of products, required pickup of unacceptable items at vendor expense, and potential negative impact on future contract awards. All deliveries are subject to a three-day conditional receipt period for examination and testing, and must comply with religious dietary requirements, including Kosher labeling where applicable.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1. Quote Sheet Cover.docx | DOCX document | |
| QUOTE SHEET COVER.pdf | ||
| 0. POST TO SAM.gov.pdf | ||
| RFQ 15B11025Q00000009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI Manchester Deliver Schedule– Requirement: Bread products
Delivery Schedule: Weekly
FCI Manchester Food Service Department requires weekly delivery of bread products.
The period of performance will be July 1st, 2025, through September 30, 2025.
Please specify the delivery schedule on solicitation. Deliveries must be made between the hours of 7:30 am and 2:00 pm EST. Federal holiday deliveries will not be accepted.
The quantities listed in the solicitation and any subsequent award are estimated maximum throughout the quarter.
The ordering procedures are as such. Weekly, the local food services administration will contact you to notify you of the quantities required to be delivered to the Food Services warehouse for the upcoming week. The notification of the authorized individuals to order will be identified at the time of the award.
Upon Award, the Food Service Warehouse must be contacted prior to delivery for approval or adjustments in delivery schedule. Delivery schedules will be strictly enforced. Failure to deliver within the established time frame will be considered as nonconformance to the terms of the contract.
• All items will be closely inspected.
• All deliveries must be palletized.
• All non-frozen, perishable foods must be delivered between 34 degrees F and 41 degrees
F.
• All canned goods must be delivered above 34 degrees F and not frozen.
• All frozen foods must be delivered at 0 degrees F or below. Any product that indicates prior thawing will be refused.
• All certified religious diet items must be marked with the Kosher Symbol on individual packages, or the item will be refused.
• Receipt of delivery may be conditional for a period of three (3) days in order to allow for adequate examination and testing.
• Some items may require thawing and cooking to determine specifications compliance.
• Items that fail to meet specifications will be refused.
• If the product is not accepted, in accordance with FAR 52.212-4 (a), “The
Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price.”
• Items which are conditionally received, and found to be unacceptable, must be picked up at the vendors' expense within two (2) weeks of noncompliance notification.
• If the product is not picked up within two (2) weeks, it will be disposed of by warehouse staff.
Items must meet specifications as indicated on the solicitation and award.
All items will be closely inspected prior to acceptance.
See FAR 52.212-4 (a) Inspection and Acceptance.
https://www.acquisition.gov/far/52.212-4?searchTerms=52.212-4 https://www.acquisition.gov/far/52.212-4?searchTerms=52.212-4
Contractor failure to meet delivery schedules without an excusable delay and/or failure to conform to contract specifications will negatively affect the contractor's history of past performance. Past performance information may be used by the Government to make future award decisions and/or may result in a finding that the quoter is not responsible for the award of future requirements.
File details come from the government source that posted it. Updated .