SOW.docx

DOCX document 17 KB Posted

Attached to
Trash Compactor
Solicitation number
15B10224PR000180
Issued by

About this file

This document is a Statement of Work (SOW) for the procurement of a self-contained hydraulic trash compactor by the Federal Bureau of Prisons (FBOP), FCI Ashland facility located in Ashland, Kentucky. The SOW specifies the required equipment, including a 20 cubic yard tail self-contained compactor with a 3 phase 10HP remote power pack, ground fed (side feed) doghouse, and various optional features. The FBOP will make all necessary utility connections. This SOW is associated with a pre-solicitation notice for a potential future contract opportunity, which is seeking market research and information from interested parties. The pre-solicitation provides details on the anticipated contract, including the NAICS code, size standard, and small business program eligibility. It also includes a questionnaire for respondents to provide information on their business, ability to meet the requirements, and timeline for proposal submission and product delivery.

View the file

Other files

File Type Posted
Sources Sought.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Contained Trash Compactor Specification FCI ASHLAND, KY

1. 0 SUMMARY OF EQUIPMENT

A. The Federal Bureau of Prisons (FBOP), FCI Ashland is located at State Route 716 in Ashland, Kentucky intends to make a single award to a responsible entity that will provide a self contained Hydraulic compactor. The vendor shall furnish equipment specified below to include delivery and freight.

1. (1) 20 CUBIC YARD TAIL SELF CONTAINED COMPACTOR; 3 PHASE 10HP REMOTE POWER PACK, UNIVERSAL 37” UNDERSTRUCTURE.

· GROUND FED (SIDE FEED) DOGHOUSE WITH DOOR ON ONE SIDE.

· (1) CONTROL MOUINTED IN FACE OF REMOTE POWER PACK.

· (1) FULLNESS PACKAGE – LIGHT FLASHES WHEN ¾ FULL, STEADY ON WHEN FULL.

· (1) HYDRAULIC CONNECTIONS ON BOTH SIDES OF COMPACTOR.

· (1) REDUCE FEED HEIGHT TO 44”.

· (1) OIL HEATER. (1) MULTI CYCLE TIMMER.

· (1) SET OF 10’ GUIDES WITH STOPS.

B. FCI Ashland Facilities shall make all connections to utilities.

File details come from the government source that posted it. Updated .