Updated Modular Homes Specifications.pdf
PDF 158 KB Posted
- Attached to
- Modular Homes Federal contract opportunity
- Solicitation number
- 15A00021R00000083
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 15A00021R00000083 Amendment 0002.pdf | ||
| Solicitation 15A00021R00000083 Amendment 0001.pdf | ||
| Modular Homes Specifications.pdf | ||
| Solicitation 15A00021R00000083.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated Modular Homes Specifications
Solicitation Requirements for 14’x76’ Modular Home
(1) This is an acquisition to purchase 2- 14’x 76’ modular homes.
(2) The model type is Tru Home, “Glory”, TRS14763B. This is a
Brand Name or Equal requirement.
(3) The specs of the Modular Home are as follows
i. Shall have Low E thermo pane windows
ii. Shall be fully insulated
iii. Shall be EnergyStar rated
iv. Exterior shall be OSB wrapped under vinyl siding
v. Interior shall be vinyl floors throughout the home (NO
CARPETING)
vi. Home shall come with heat pump installed to provide heating and cooling throughout the home.
(4) This is requirement is for a 2-brand new Modular Homes only, no remanufactured models will be accepted.
(5) All Manufacturer warranties Shall be included with these modular homes.
(6) The modular homes Shall be delivered within 120 days after contract award.
(7) Customer dependability of Modular: Past performance history of the contractor Must be provided, that are recent and relevant, and they will be evaluated to assess the offeror’s probability of meeting the solicitation requirements. Three (3) References Must be provided. Recent is defined as contract performance within the past three years. Relevancy includes, but are not limited to, the following: similarity of product/service/support, complexity, dollar value, contract type, use of key personnel (for services), and extent of subcontracting/teaming.
(8) The Government will evaluate customer ratings on the reliability and dependability of the submitted Modular Home model using various resources that are available
ALL ITEMS ABOVE SHALL BE ADDRESSED INDIVIDUALLY IN THE
CONTRACTOR’S RESPONSE!
“Failure to comply with any of the instructions in detail or items listed shall result in a non-responsive bid, which will be eliminated from further consideration immediately.”
File details come from the government source that posted it. Updated .