15685_Trane_Chiller_O&M_-_F_(1).pdf
PDF 10 MB Posted
- Attached to
- South Energy Center, Chiller 202 Major Overhaul
- Solicitation number
- REQUEST FOR PROPOSAL 2026-028
- Issued by
- Alachua County, Graceville City, Florida
About this file
This is a product submittal form for a Trane CenTraVac electric chiller operation and maintenance contract involving Gainesville Regional Utilities (GRU) and the South Energy Center in Florida. The submittal documents specifications for a 1,500-ton Trane CenTraVac chiller (Model #CVHF147NA3P0FCZ321F2BBFZBA00000060A10040LS00004A100B, Serial #L08C01579) requiring major overhaul. The chiller, which has accumulated approximately 52,000 run hours, is located on the third floor of the SEC between two additional chillers with limited overhead space. The form includes comprehensive technical specifications covering unit nameplate identification, foundation and rigging requirements, electrical installations, water piping configurations, isolation systems, insulation specifications, control panel wiring diagrams, and maintenance procedures. A mandatory pre-bid meeting is scheduled for Tuesday, January 27, 2026, with bid responses due by Wednesday, February 18, 2026. The tentative schedule for completing the major overhaul work is Fall 2026, no earlier than October 1, 2026.
The submittal form provides detailed technical documentation rather than pricing information, as it functions as a reference document for contractors bidding on the project. The form includes specifications for optional components such as heat recovery condensers, auxiliary condensers, free cooling systems, and various starter configurations (unit-mounted, remote-mounted, or customer-supplied). Standard maintenance procedures are documented with daily, quarterly, semi-annual, annual, and three-year inspection intervals, including oil analysis, tube testing, and compressor examinations. The document references multiple Trane field connection diagrams and wiring schematics specific to different starter types and configurations. No pricing, set-asides, funding sources, or incumbent information is provided in this technical submittal document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRODUCT SUBMITTAL FORM
Submittal No.
Project Title
P.O. No. PSR No.(s)
Project (Drawing) No.
Design Engineer(s)
Construction Contract Administrator
Prime Contractor Subcontractor
Transmitted herewith are the following documents submitted by the Contractor for GRU’s review and/or approval:
Reviewed or Approved by Date
Rejected or Disapproved by Date
Comments:
Date Received by CCA Date Forwarded to Designer
Date Returned to CCA Date Returned to Contractor
Contractor’s Certification:
1. Items submitted are in accordance with the requirements of the Work and contract documents.
Signed
2. Any product substitutions meet or exceed the quality level of the specified product and meet all other requirements of the Work and contract documents.
Signed
Project Data Project Title:
Project Number:
FSR Number:
Drawing Number:
Subcontractor Data Subcontractor/Supplier:
Spec / Package No:
Subcontract PO No.:
Submittal Number:
Submittal Title:
Spec Section & Paragraph:
Submittal Type:
Product Use / Application:
Date By
Received:
Contractor Approval
DESIGN/BUILDER'S APPROVAL
(see Contract Documents)
Action Legend
A. Submittal Approved: Proceed with affected work.
Send additional copies for final distribution
B. Submittal Approved as Noted: Proceed with work in accordance with notations. Revise and resubmit.
C. Submittal Returned for Revision: Do not proceed with affected work. Revise or complete and resubmit.
D. Submittal Not Approved: Submit compliance submittals responsive to Contract Documents.
E. Preliminary Submittal: Resubmit with additional information required for acceptance.
F. For Reference; No acceptance required: Send additional copies for final distribution.
G. Distribution Copy: Previous copies accepted.
Scheduled Completion Required Reviewers Review Complete Reviewed By Date Civil Engineer Architect Structural Engineer Mechanical Engineer Electrical Engineer Project Manager
Submittal Cover Sheet
Action:
Lead Reviewer Name:
Date:
Submittal Cover Form Page 1 of 1 September 20, 2006
Figure 1 . Typical Unit Nam eplate
Digit Descript ion
1-3 Unit Type
4 Developm ent Sequence
5-7 Nom inal Tonnage
8 Unit Voltage
9 Unit Type
10-11 Design Sequence
12 Hot Gas Bypass
13 Starter Type
14 Cont rol Enclosure
15 Com pressor Motor Power (CPKW)
16-18 Com pressor I m peller Cutback
19 Evaporator Shell Size
20 Evaporator Tube Bundle (Nom inal Tons)
21 Evaporator Tubes
22 Evaporator Waterbox
23 Condenser Shell Size
24 Condenser Tube Bundle (nom inal tons)
25 Condenser Tubes
26 Condenser Waterbox
27 Heat Recovery Condenser Shell Size
28 Heat Recovery Condenser Tube Bundle (nom inal tons)
29 Heat Recovery Tubes
30 Heat Recovery Condenser Waterbox
31 Auxiliary Condenser Size & waterbox
32 Auxiliary Condenser Tubes
33 Orifice Size
34 Orifice Size
35 Unit Opt ion- I nsulat ion & Rupture Guard
36 Enhanced Protect ion
37 Generic BAS
38 Extended Operat ion
39 Tracer Com m unicat ion
40 Condenser Refr igerant Cont rol
41 Manufactur ing Locat ion
42 Special Opt ions
43 Water Flow Control
44 Chilled Water Reset
45 Heat Recovery Tem perature Sensors
46 Gas Powered Chiller
47 Com pressor Motor Fram e Size
48 Volute Discharge Angle
49 Operat ing Status
50 I ndust r ial Chiller Package
51 Cont rol Power Transform er
52 Motor & Term inal Board Config
Type of Requirement
Trane Supplied Trane Installed
Trane Supplied Field Installed
Field Supplied Field Installed
Foundation ? Meet foundat ion requirements
Rigging ? Safety chains Clevis connectors Lifting beam
I solat ion ? I solat ion pads or spr ing isolators
? I solat ion pads or spr ing isolators
Elect r ical ? Circuit breakers or fusible disconnects (optional)
? Unit m ounted starter (optional)
? PFCCs (opt ional)
? Jum per bars ? Tem perature sensor
(optional outdoor air) ? Flow switches (m ay be field supplies) ? Rem ote m ounted starter
(optional)
? Circuit breakers or fusible disconnects (opt ional) ? Elect r ical connect ions to unit m ounted starter (opt ional) ? Elect r ical connect ions to rem ote mounted starter (optional) ? Wir ing sizes per subm it tal and NEC ? PFCCs ( rem ote m ounted starter opt ional only) ? Term inal lugs ? Ground connect ion(s) ? Jum per bars ? BAS wir ing (opt ional) ? I PC wir ing (AFD and rem ote m ounted starters only ? Cont rol voltage wir ing (AFD and rem ote m ounted starters only) ? Oil pum p inter lock wir ing (AFD and rem ote m ounted starters only) ? High condenser pressure inter lock wir ing (AFD and rem ote mounted starters only).
? Chilled water pum p contactor and wiring including interlock ? Condenser water pum p contactor and wir ing including interlock ? Opt ion relays and wir ing (See Table 12)
Water piping ? Flow switches (m ay be field supplied)
? Taps for therm om eters and gauges ? Therm om eters ? St rainers (as required) ? Water flow pressure gauges ? I solat ion and balancing valves in water piping ? Vents and drain on waterbox valves (1 each per pass) ? Pressure relief valves ( for waterboxes as required)
Relief ? Rupture disc assem bly ? Rupture guard (opt ional) ? Vent line and flexible connector and vent line from rupture disc to atmosphere
I nsulat ion ? I nsulat ion (opt ional) ? I nsulat ion
Water Piping Connection Components
Flanged ? Welded on flange for
300 psig waterboxes
Flanged ? Victaulic to flange adapter for 150 psig waterboxes
Victaulic ? Victaulic coupling for 150 and 300 psig waterboxes
Other Mater ials ? HCFC-22 refr igerant (1 lb. maximum per machine as needed) ? Dry nit rogen (8 psig m aximum per machine as needed)
Less than 1 m onth 1 ? 6 m onths Greater than 6 m onths
Location requirements:
? solid foundat ion ? vibrat ion free ? dry ? tem perature range -40° F to 158° F
(-40°C to 70°C)
Location requirements:
? solid foundat ion ? vibrat ion free ? dry ? tem perature range -40° F to 158° F
(-40°C to 70°C)
Location requirements:
? solid foundat ion ? vibrat ion free ? dry ? temperature range -40° F to 158° F
(-40°C to 70°C)
? Do not rem ove any plast ic coverings ? Do not rem ove any plast ic coverings ? Do not rem ove any plast ic cover ings
? Do not charge the chiller with refrigerant
? I f addit ional refr igerant is on site, follow manufactures storage requirements
? Do not charge the chiller with refrigerant
? I f addit ional refr igerant is on site, follow manufactures storage requirements
? Do not charge the chiller with refrigerant
? I f addit ional refr igerant is on site, follow manufactures storage requirements
? Verify dry nit rogen pressure using gauge located on the evaporator shell reads 3 to 5 psig (21 to 34.5 kPa)
? Not ify the local Trane office if charge has escaped
? Verify dry nit rogen pressure using gauge located on the evaporator shell reads 3 to 5 psig (21 to 34.5 kPa)
? Not ify the local Trane office if charge has escaped
? Verify dry nit rogen pressure using gauge located on the evaporator shell reads 3 to 5 psig (21 to 34.5 kPa)
? Not ify the local Trane office if charge has escaped
? Do not operate purge unit ? Do not operate purge unit ? Do not operate purge unit
? Verify waterbox and tube bundles are clean and dry
? Verify waterbox and tube bundles are clean and dry
? Conduct an oil analysis and ver ify no oil breakdown
? Repeat year ly ? Replace oil if breakdown has occurred ? I f no oil analysis program has been followed, replace oil prior to start up
? Every 6 m onths start the oil pum p and rotate compressor shaft 450 degrees to prevent bearing issues
? Contact your local Trane office to preform this task
Note: Chillers stored 5 years or longer should be inspected every 5 years by a qualified service organization for leaks.
1. Suction Elbow
2. Compressor
3. Terminal Box
4. Control Panel
5. Condenser
6. Motor Housing
7. Economizer
8. Oil Tank Assembly
9. Purge
10. Evaporator
11. Display Panel
Evaporator Size Shell Com bo A B C D E
032 Short / Long Short / Short 44.25? 141? 320.25? 34? 53?
Short / Long 76.875? 218.875? 430.75? 34? 53?
Long/ Long 44.25? 186.25? 410.75? 34? 53?
050 Short / Long Short / Short 44.5? 141? 320.5? 39.125? 62?
Short / Long 77.125? 218.875? 431? 39.125? 62?
Long/ Long 44.5? 186.25? 411? 39.125? 62?
080 Short / Long Short / Short 52.25? 141? 328.25? 35.125? 75.75?
Short / Long 84.875? 218.875? 438.75? 35.125? 75.75?
Long/ Long 52.25? 186.25? 418.75? 35.125? 75.75?
142 Medium / Long/ Extended Medium Long 77.5? 206.5? 444? 43.875? 91.125?
Long/ Long 57.25? 186.25? 423.75? 43.875? 91.125?
Extended/ Long 57.25? 209? 469? 43.875? 91.125?
210 Long Long/ Long 59? 186.25? 425.5? 46.25? 101.375?
250 Extended Extended/ Long 62.375? 209? 474.125? 42.5? 114.125?
Optional unit mounted starter
Cooling condenser
Auxiliary condenser (optional)
Evaporator
Economizer
Motor
Per NEC article 110
C
BA
D
E
Right hand tube pull shown, apply tube pull clearance dimension to left end for left hand tube pull.
Per NEC article 110
Cond Size
CDSZ
Aux Condenser Size 80 Aux Condenser Size 130 Heat Recovery Condenser Free Cooling
Ship Weight in pounds
Operating Weight in pounds
Ship Weight in pounds
Operating Weight in pounds
Ship Weight in pounds
Operating Weight in pounds
Ship Weight in pounds
Operating Weight in pounds
032 Short 825 1057 960 1248 2119 2624 500 785
032 Long 825 1057 960 1248 2663 3263 500 785
050 Short 825 1057 960 1248 3170 4018 750 1290
050 Long 825 1057 960 1248 3985 4986 750 1290
080 Short 825 1057 960 1248 5340 6593 750 1360
080 Long 825 1057 960 1248 6683 8180 750 1360
142 Long 825 1057 960 1248 12180 14666 1400 2400
210 Long 825 1057 960 1248 16023 19299 1400 2400
16 feet mimimum effective lenght safety chain or cable
800 Short shells only -use rigging flange
Auxiliary opt ion Heat recovery opt ion side view of unit end view of unit outside edge of tube sheet center tube sheet support leg center of isolator spring
Note: the spring isolator must be centered in relation to the tube sheet. Do not align the isolator with the flat part of the chiller foot since the tube sheet is often off center
Note: the length of the isolator should be parallel to the leg.
032 S/S, S/L, L/L 050 S/S, S/L, L/L 080 S/S, S/L, L/L 142 M/L, L/L 210 L/L
142 E/L 250 E/L
CondenserCondenser
Evaporator
LF
LR
RF
RR
Condenser
Evaporator
LF
LR
RF
RR
LC
1 2
55 5
1. Balancing Valve
2. Gate (Isolation) Valve or Ball Valve
3. Thermometer (If field supplied)
4. Flanged Connection 1/2?
[13 mm] NPT Couplings
5. Drain, Vent, Anode
7. Chilled Water Flow Switch (5S1)
6. Strainer
9. Pump
10. Pressure Gauge Note: 1. Flow switch 5S1 (Item __in Legend of Components) may be installed in either the entering or leaving leg of the chilled water circuit.
2. It is recommended to pipe the gauge between entering and leaving pipes. A shutoff valve on each side of the gauge allows the operator to read either entering or leaving water pressure.
Figure 1 0 . Typical condenser w ater piping circuits
1. Balancing Valve
2. Gate (Isolation) Valve or Ball Valve
3. Thermometer (If field supplied)
4. Flanged Connection 1/2?
[13 mm] NPT Couplings
5. Drain, Vent, Anode
6. Strainer
7. Condenser Water Flow Switch
8. 3-Way Valve (Optional)
9. Condenser Water Pump
10. Pressure Gauge Note: 1. The Flow Switch 5S2 (Item __ in Legend of Components) may be installed in either the entering or leaving leg of the chilled water circuit.
2. It is recommended to pipe a single gauge between entering and leaving pipes.
3. Some type of field-supplied temperature control device may be required to regulate the temperature of the heat-recovery condenser water circuit. For application recommendations, see Trane Application Manual, ?AM- FND-8?, titled ?Heat-Recovery Engineering Seminar?.
4. Install a bypass valve system to avoid circulating water through the auxiliary shell when the unit is shut down.
5. On multiple pass condensers, entering condenser water must enter at the lowest nozzle.
4 45
2 1 outlet inlet
1 2
4 5
7 8
44 5 outlet inlet
EVSZ
Nominal Pipe Size (inch/mm)
1 Pass 2 Pass 3 Pass
I nch m m I nch m m I nch m m
032 8 219.1 6 168.3 5 141.3
050 10 273.0 8 219.1 6 168.3
080 12 323.9 10 273.0 8 219.1
142 16 406.4 12 323.9 10 273.0
210 16 406.4 14 355.6 12 323.9
250 16 406.4 14 355.6 12 323.9
Note: EVSZ = Evaporator Shell Size; S = Short Shell, L = Long Shell, E = Extended Shell
CDSZ
Nominal Pipe Size (inch/mm)
2 pass
I nch m m
032 6 168.3
050 8 219.1
080 10 273.0
142 12 323.9
210 14 355.6
250 14 355.6
Note: CDSZ =Condenser Shell Size; S = Short Shell, L = Long Shell, E = Extended Shell
Customer Piping Connection
Unit Model Unit Connect ion Type Victaulic? Flanged
CVHE and
CVHG
Flanged (Condenser 032-050 150 psig and 1035 kPa non-marine only)
Trane provided Victaulic-to-Flange
Adapter No Adapter Required
CVHE,
CVHF, and
CVHG
Victaulic (All others)
Customer provided Victaulic Coupling
Trane provided Victaulic-to-Flange
Adapter
Flanged Flanged Victaulic
Water Box
Welded Flange
Water Box
Flange Adaptor Trane Provided
Water Box
Style 77 Flexible Customer Provided
Customer
Nom inal Pipe Size Assembly Bolt Size* Num ber of Assembly
Bolts Required
Bolt Pat tern Diameter Weight
I nch mm I nch mm I nch mm Pounds kg
4 114.3 5/ 8 x 3 16 x 76 8 7.5 191 7.7 3.5
5 141.3 3/ 4 x 3-1 / 2 19 x 89 8 8.5 216 9.3 4.2
6 168.3 3/ 4 x 3-1/ 2 19 x 89 8 9.5 241 10.3 4.7
8 219.1 3/ 4 x 3-1 / 2 19 x 89 8 11.75 298 16.6 7.5
10 273.0 7/ 8 x 1/ 4 22 x 6 12 14.25 362 24.2 11.0
12 323.9 7/ 8 x 1 / 4 22 x 6 12 17 432 46.8 21.2
14 355.6 1 x 4-1 / 2 25 x 114 12 18.75 476 75 34.0
16 406.4 1 x 4-1 / 2 25 x 114 16 21.25 540 90 40.8
Note: Bolt size for conventional flange to flange connection. Longer bolts are required when flange washer must be used.
Nominal Pipe Size Assembly Bolt Size* Number of Assembly
Bolts Required
Bolt Pattern Diameter Weight Inch mm Inch mm Inch mm Pounds kg
4 114.3 3/4 x 3-3/4 19 x 95 8 7.88 200 15.3 6.9 5 141.3 3/4 x 4 19 x 102 8 9.25 235 17.7 8.0 6 168.3 3/4 x 4-1/2 19 x 114 12 10.63 270 23.4 10.6 8 219.1 3/4 x 4-3/4 19 x 121 12 13 330 34.3 15.6
10 273.0 1 x 5-1 /4 25 x 133 16 15.25 387 48.3 21.9 12 323.9 1-1 /8 x 5-3/4 29 x 146 16 17.75 451 70.5 32.0
Bolt Size Gasket Type
I nch mm O-Ring Flat
3/ 8? 9.5 25 (34) 12-18 (16-24)
1 / 2? 13 70 (95) 33-50 (45-68)
5/ 8? 16 150 (203) 70-90 (95-122)
3/ 4? 19 250 (339) 105-155 (142-210)
Note: Torques provided in Ft./Lbs. (Newton/metres) Bolt size is determined by the diameter of bolt shank.
4 bolt flange 8 bolt flange 12 bolt flange
16 bolt flange 20 bolt flange 24 bolt flange bolt rupture disc suction connection gasketoutside pipe assembly cap Note: Pipe conection is 3? NPT alternate purge discharge vent line outside wall support this pipe flexible steel connection drip leg (length as required for easy access)
1/4? FL x 1/4? NPT drain valve rupture disc assembly
Evaporator Size
(EVSZ)
(3)
Condenser Size
(CDSZ)
(4)
?C? Values for Unit Components
Total C value Short H.R.
Condenser
Long H.R.
Condenser
Auxiliary Condenser
With Free Cooling
032 Short 032 Short 49.97
18.87 25.19 15.28 4.16032 Short 032 Long 56.29
032 Long 032 Long 65.08
050 Short 050 Short 64.05
23.56 31.45 15.28 6.16050 Short 050 Long 71.94
050 Long 050 Long 83.02
080 Short 080 Short 86.28
29.06 38.80 15.28 5.87080 Short 080 Long 96.02
080 Long 080 Long 111.29
142 Extended 142 Long 142.20
N/A*
Design
Special
15.28
Design
Special
142M 142 Long 126.37 50.50
7.10 142 Long 142 Long 136.76
210 Long 210 Long 149.28 56.72
250 Extended 250 Long 173.33 62.12
Note: Rupture disc diameter is 3 inches (76 mm) Note: 1. To determine the total ?C? value for a specific unit, add the appropriate ??C? values for the evaporator, standard condenser and economizer. If the unit is equipped with any options (e.g., heat recovery, free cooling or an auxiliary condenser, add the applicable ?C? values to this total. With this new sum, refer to Figure 18 to determine the vent line pipe diameter.
Pipe size as a Function of ?C? Value and Length of Run
Note: This chart, provided as a reference, is based on ASHRAE Standard 15-2007. Vent line size is typically dictated by state or local code which may be different from ASHRAE Standard 15-2007 requirements.
10 100 1000
L = Pipe Length (Equivalent Feet) (Feet x .348 = Meters)
"C
V a lu e
Pipe Size (I.D.)
friction factor
6 NPS
(6.065) f=0.0149
4 NPS
(4.026) f=0.0163
3 NPS
(3.068) f=0.0173
5 NPS
(5.048) f=0.0155
L= .214d 5 (P2 0 - P2
2) -f C2
R d *ln(P0 / P2)
6 - f
P0= (0.5-15) + P2
P2= 14.7 psia f= Moody Friction Factor in fully turbulent flow
ANSI/ASHRAE Standard 15-2007
EVSZ
(Note 1)
Standard Unit Free Cooling
3/4? (19 mm) Insulation (Note 1)
(Square Feet)
3/8? (9.5 mm) Insulation (Note 2)
(Square Feet)
3/4? (19 mm) Insulation (Note 1)
(Square Feet)
3/8? (9.5 mm) Insulation (Note 2)
(Square Feet)
032 Short 337 52 347 74
032 Long 365 52 377 74
050 Short 385 63 398 72
050 Long 420 63 436 72
080 Short 505 84 515 97
080 Long 553 84 566 97
142 Medium 555 98 555 133
142 Long 578 98 578 133
142 Extended 603 104 629 133
210 Long 700 98 710 133
Notes:
1. 3/4? (19 mm) sheet insulation is installed on the evaporator, evaporator water boxes, compressor motor, suction elbow and suction cover.
2. 3/8? (9.5 mm0 sheet insulation is installed on all economizers. All liquid lines and other pipes require the use of 1/2? (13 mm) pipe insulation or 3/8? (9.5 mm0 sheet insulation. Copper oil eductor tube lines require pipe insulation.
3. Refrigerant Pump equipped units are NOT insulated on the motor or refrigerant drain lines.
Note 1. Bulbwells, drain and vent connections must be accessible after insulating
Note 2. Evaporators with ASME nameplates must have insulation cut out around the nameplate. Do not glue insulation to the nameplate.
Note 3. All units with evaporator marine waterboxes wrap waterbox shell insulation with strapping and secure strapping with seal.
Note 4. Apply two inch wide black tape on overlap joints.
Where possible apply three inch wide strip of.38 think insulation over butt joint seams.
Note 5. Insulate all economizer supports.
line to eductor filter drier and eductor lines line from Evap control panel support suction connection see note 1 & 3 suction elbow suction coverpipe (free cooling only) pipe evaporator see note 1 see note 1 & 3 eductor line pipe evaporator
Storage
Tem perature: -40° F to 185° F ( -40° C to 85° C)
Relat ive hum idity: Between 5% to 95% (non-condensing)
Operating
Tem perature: -40° F to 158° F ( -40° C to 70° C)
Hum idity: Between 5% to 95% (non-condensing)
Power: 19?30 Vac (24 Vac nom inal) 50?60 Hz 12 VA
Mount ing weight (enclosure) : Mount ing surface m ust support xx lb. ( x.xx kg)
Mount ing weight (controller) : Mount ing surface m ust support xx lb. ( x.xx kg)
Environm ental rat ing (enclosure) : NEMA 1
2 3 4 5
Front View
Bottom View
LED UC8 0 0 Status
Marquee LED
Powered. If the Marquee LED is green solid, the UC800 is powered and no problems exist.
Low power or malfunction. If the Marquee LED is red solid, the UC800 is powered, but there are problems present.
Alarm. The Marquee LED blinks Red when an alarm exists.
LINK, MBUS, IMC
The TX LED blinks green at the data transfer rate when the UC800 transfers data to other devices on the link.
The Rx LED blinks yellow at the data transfer rate when the UC800 receives data from other devices on the link.
Ethernet Link The LINK LED is solid green if the Ethernet link is connected and communicating.
The ACT LED blinks yellow at the data transfer rate when data flow is active on the link.
Service The Service LED is solid green when pressed. For qualified service technicians only. Do not use.
Marquee LED
1X2 1S1 1K1 1T41T21K 2 1T3
1T6 1T71T5
1A4 1A91A6 1A81A7 1A261A5
OR
1A11
1A12 1A23
1A21A1 1T1
1X1
Q
Q
Q
Q
Q
Q
F
1A20 1A211A19
OR
1A25
1A241A181A171A13 1A14 1A15 1A161A22
X19091218-01
OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL
OPTIONAL
OPTIONAL OPTIONAL OPTIONAL OPTIONAL
V M
A X
V M
A X
V M
A X
V M
A X
30V MAX 30V MAX
V T
O
V
V
T O
V
V T
O
V
V
T O
V
30V TO 115V30V TO 115V
30V TO 115V 30V TO 115V
30V TO 115V30V TO 115V
30V MAX 30V TO 115V
30 Volt Maxim um 30-115 Volt Maxim um
4A
4B
1A
1B 1C
Power supply wiring to starter panel
Starter panel terminals
3-Phase Line Voltage: Terminal Block (2TB3 or 2X3)
2X3-L1, L2, L3, and
GROUND
3-Phase Line Voltage: Circuit Breaker
2Q1-L1, L2, L3, and
GROUND
Starter to m otor pow er w ir ing Starters
Remote Starter to Chiller Motor Junction Box
T1 through T6
Starter to control panel 120VAC control wiring
Starter Panel Terminals
Unit Control Panel Terminations
120VAC Power Supply (from starter to control panel)
2X1-1-1, 2X1-2 2X1-20(Ground)
1X1-1, 1X1-12 1X1-18 (Ground)
1X1-1, 1X1-12 1X1-18 (Ground)
High Pressure Cutout to Starter 2X1-4 1X1-4 14 ga.
1Q1 Circuit Breaker to Starter 2X1-6 1X1-3 14 ga.
Oil Pum p I nter lock 2X1-7, 2X1-8 1A7-J2-4, 1A7-J2-2 14 ga.
Low Voltage Circuits less than 30VAC
Starter Panel Terminals
Unit Control Panel Terminations
Standard Circuits
Inter Processor Communications (IPC) Remote Mounted
2A1- J3-3 to 4, or 2X1-12 to 13 if present (do not ground shield at starter)
1A1-J5-1-2, 3-4
Shield ground at
1X1- 22 (GND) only.
2 wire with ground
Comm link.
Note: All wiring to be in accordance with National Electrical Code and any local codes.
Power supply wiring to starter panel
Starter panel terminals
Starter by others 3-phase power wiring
See starter by others schematic
Starter to m otor pow er w ir ing Starters Motor
Remote starter to chiller motor junction box
T1 through T6 term inals T1 through T6 terminals
Starter to control panel 120VAC control wiring
Starter Panel Terminals
Unit Control Panel Terminations
120VAC Power Supply (from starter to control panel)
See starter by others schematic 5X1-1, 5X1-2, 5X1-20 (ground)
1X1-1, 1X1-12, 1X1-18 (ground)
#8 gauge minimum 40 amps circuit
Power from cont rol panel 1Q1 5X1-3 1X1-3, 1A23-J6-3 14 ga.
I nter lock relay signal 5X1-4 1A23-J10-1 14 ga.
Start contactor signal 5X1-5 1A23-J8-1 14 ga.
Oil pum p inter lock 5X1-7, 5X1-8 1A7-J2-4, 1A7-J2-2 14 ga.
Run contactor signal 5X1-10 1A23-J6-12 14 ga.
Transit ion com plete 5X1-14 1A23-J12-2 14 ga.
Low Voltage Circuits less than 30VAC
Starter Panel Terminals
Unit Control Panel Terminations
Standard Circuits
Current Transformers* (see table next page) (Required)
5CT4- white, black 5CT5- white, black 5CT6- white, black
1A23-J7-1,2 1A23-J7-3,4, 1A23-J7-5,6, Note: Phasing must be maintained
Potent ial Transform ers (Required) 5T17-236,237 5T18-238,239 5T19-240,241
1A23 ?J5-1,2, 1A23 ?J5-3,4, 1A23 ?J5-5,6
Note: Phasing must be maintained
Note: All wiring to be in accordance with National Electrical Code and any local codes.
Note: Starter by others specification available from your local Trane sales office.
W ire AW G ( m m 2 ) Maxim um w ire length secondary CT leads
Feet Meters
8 (10) 1362.8 415.5
10 (6) 856.9 261.2
12 (4) 538.9 164.3
14 (2.5) 338.9 103.3
16 (1.5) 213.1 65.0
17 (1) 169.1 51.5
18 (0.75) 134.1 40.9
20 (0.5) 84.3 25.7
Note: 1. Wire length is for copper conductors only.
2. Wire length is total one-way distance that the CT can be from the starter module.
W ire Gauge Maxim um lead length
Feet Meters
8 5339 1627
10 3357 1023
12 2112 643
14 1328 404
16 835 254
17 662 201
18 525 160
20 330 100
21 262 79
22 207 63
Note: 1. Wire length is for copper conductors only.
2. The above length is maximum round trip wire length. The maximum distance the PT can be located from the starter module is half of the listed value.
W ire Gauge Max w ire length prim ary Max w ire length secondary
Feet Meters Feet Meters
8 3061 933 711 217
10 1924 586 447 136
12 1211 369 281 85
14 761 232 177 53
16 478 145 111 33
17 379 115 88 26
18 301 91 70 21
20 189 57 44 13
21 150 45 34 10
22 119 36 27 8
Note: 1. Wire length is for copper conductors only.
2. The above length is maximum round trip wire length. The maximum distance the PT can be located from the starter module is half of the listed value.
L3
G
L2 L1 L3
G
L2 L1
L3 L2 L1 G L3 L2 L1 G L3 L2 L1 G motor fuses enclosed 3-phase capacitor unit fused disconnect or suitable breaker power circuit current transformer motor starter contactor motor fuses enclosed 3-phase capacitor unit fused disconnect or suitable breaker power circuit current transformer motor starter contactor
1. line side power conduits
2. unit-mounted starter
3. unit control panel
1. line side power conduits
2. remote-mounted starter
3. unit control panel
4. IPC circuit conduit less than 30V Note: must enter the low voltage Class 2 portion of the unit control panel (1000 feet max)
5. motor terminal box
6. 115V control conduit Note: must enter the higher than 30 Vdc
Class 1 portion of the until control panel
7. lead power wiring Note: refer to the unit field connection diagram for approximate unit control panel knock out locations
Note: to prevent damage to the unit control panel components, do not route control conduit into the top of the box
Figure 2 9 . Term inal stud, clam p and lug assem bly
1. Belleville washer
2. terminal lugs
3. terminal clamp
4. motor terminal stud
5. 3/8? bolt
Standard Control Circuits: Unit Control Panel Control Wiring
(120 VAC)
Unit Control
Term inat ions I nput or Output Type Contacts
Chilled Water Flow Proving Input
1X1-5 to 1A6-J3-2 Binary I nput Norm ally Open, closure with flow
Condenser Water Flow Proving Input
1X1-6 to 1A6-J2-2 Binary I nput Norm ally Open, closure with flow
Chilled Water Pump Relay Output
1A5-J2- 4 to 6 Binary Output Norm ally Open
Condenser Water Pump Relay Output
1A5-J2-1 to 3 Binary Output Norm ally Open
Optional Control Circuits (120 VAC)
Note: Defaults are factory programmed, alternates can be selected at startup using the service tool.
Alarm Relay MAR (Non- Latching) Output
1A8-J2-1 to 3 Binary Output Norm ally Open
Limit Warning Relay Output
1A8-J2-4 to 6 Binary Output Norm ally Open
Alarm Relay MMR (Latching) Output
1A8-J2-7 to 9 Binary Output Norm ally Open
Compressor Running Relay Output
1A8-J2-10 to 12 Binary Output Norm ally Open
Maximum Capacity Relay Output
1A9-J2-1 to 3 Binary Output Norm ally Open
Head Relief Request Relay Output
1A9-J2-4 to 6 Binary Output Norm ally Open
Purge Alarm Relay Output
1A9-J2-7 to 9 Binary Output Norm ally Open
I ce Making Relay Output 1A5-J2-10 to 12 Binary Output Normally Open
Free Cooling Relay Output
1A11-J2-4 to 6 Binary Output Normally Open
Standard Low Voltage Circuits (less than
30VAC)
Unit Control Panel
Term inat ions I nput or Output Type Contacts
External Auto Stop I nput 1A13-J2-1 to 2 Binary I nput Closure required for normal operation
Em ergency Stop I nput 1A13-J2-1 to 2 Binary I nput Closure required for normal operation
Optional Low Voltage Circuits
External Base Loading Enable Input
1A18-J2-1 to 2 Binary I nput Normally Open
External Hot Water Control Enable Input
1A18-J2-3 to 4 Binary I nput Normally Open
External Ice Machine Control Enable Input
1A19-J2-1 to 2 Binary I nput Normally Open
External Free Cooling Input Enable Input
1A20-J2-1 to 2 Binary I nput Normally Open
% RLA Compressor Output
1A15-J2-1 to 3 Analog Output 2-10 vdc
External Condenser Pressure Output
1A15-J2-4 to 6 Analog Output 2-10 vdc
External Current Limit Setpoint Input
1A16-J2-2 to 3 Analog I nput 2-10 vdc, or 4-20 mA
External Current Limit Setpoint Input
1A16-J2-5 to 6 Analog I nput 2-10 vdc, or 4-20 mA
External Current Limit Setpoint Input
1A17-J2-2 to 3 Analog I nput 2-10 vdc, or 4-20 mA
Generic Refrigerant Monitor input
1A17-J2-5 to 6 Analog I nput 2-10 vdc, or 4-20 mA
Outdoor Air Temperature sensor
IPC bus Connection and sensor
Communication and sensor
Note: Tracer Comm Interface or LonTalk
1A14-J2-1(+) to 2(-) 1A14-J2-3(+) to 4(-)
Communication to Tracer or LonTalk
(as ordered, see sales order)
Note: All wiring to be in accordance with National Electrical Codes and any local codes
Field W ir ing Layout Draw ing Draw ing Num ber Maximum
Acceleration Time (seconds)
Unit Mounted Wye-Delta Star ter (USTR) 2311-0404 27
Unit Mounted Solid-State Starter (USI D) 2311-0412 15
Unit Mounted Across- the-Line (UXL) 2311-0452 6
Unit Mounted Adapt ive Frequency Drive (UAFD) 2311-0453 & 2311-0454
Unit Mounted Auto Transformer Start (UATR) 2311-0426 11
Unit Mounted Prim ary Transformer (UPI R) 2311-0439 11
Remote Wye-Delta Starter (RSTR) 2311-0402 27
Remote Mounted Solid-State Starter (FSI D, WSI D) 2311-410 15
Remote Across- the-Line Starter (RXL) 2311-0448 6
Remote Prim ary Reactor Starter (RPI R) 2311-0435 11
Remote Auto Transformer Starter (RATR 2311-0422 11
Customer Supplied Wye-Delta Starter (CSTR) 2311-0457 27
Customer Supplied Primary Reactor or Auto Transformer Starter (CATR, CPIR)
2311-0479 11
Customer Supplied Across- the-Line Starter (CXL) 2311-0493 6
Customer Supplied Solid-State Starter (CSOL) 2311-0461 20
Purge Schem at ic 2311-0510
Unit Cont rols Schemat ic 2311-0505
System Controls Schemat ic 2311-0508
Opt ional Cont rol Schemat ic 2311-0511
Connection Diagrams
Standard Connect ion Diagram Panel with Opt ions 2311-0526
Field Connect ion Trane Starter (LV) 2311-0551
Field Connect ion Trane Starter (MV) 2311-0555
Customer Supplied Starter (LV) 2311-0559
Customer Supplied Starter (MV) 2311-0562
Trane Supplied AFD 2311-0565
Unit Wir ing 2311-0549
Note: These are typical drawings only. Refer to specific as-built schematics for actual unit drawings which represent the unit wiring as shipped.
Note: Contact your local Trane representative for all other schematics, wiring diagrams and/or connection diagrams not listed.
condenser high side economizer evaporator 2
P1
P3
P2
P4
P re ss u re
P S
I) low side economizer condenser economizer evaporator
P1
P1P2
P3
P re ss u re
P S
I)
1. motor coolant return to condenser (2.125 OD) 11. liquid refr igerant to pump (1.625 OD)
2. oil tank vent to evaporator 12. econom izer
3. oil separator and tank vent m anifold 13. oil supply to bearings ( .625 OD)
4. tank vent line 14. purge
5. condenser 15. com pressor
6. high pressure condenser gas to drive oil reclaim eductors (.375 OD)
16. liquid refrigerant motor coolant supply
(1.125 OD)
7. oil return to tank 17.liquid refrigerant to economizer
8. oil tank 18. liquid refr igerant to evaporator
9. oil cooler within economizer (.625 OD coiled tubing) 19. evaporator
10. oil reclaim from evaporator (2nd eductor) ( .25 OD) 20. oil reclaim from suct ion cover (1st eductor) ( .25 OD) compressor lubrication system compressor lubrication sy motor cooling system oil reclaim system1
9 10
Operat ing Character ist ic Norm al Reading
Approxim ate Evaporator Pressure 6 to 9 PSI A / -9 to -6 PSI G
Approximate Condenser Pressure (see notes 1 & 2) 17 to 27 PSIA / 2 to 12 PSIG (standard condenser)
Oil Sum p Tem perature Unit not running 140° F to 176° F (60° C to 80° C)
Oil Sum p Tem perature Unit running 95° F to 162° F (35° C to 72° C)
Oil Sum p Tem perature Different ial Oil Pressure 18 to 22 psid
Note 1. Condenser pressure is dependent on condenser water temperature, and should equal the saturation pressure of HCFC-123 at a temperature above that of leaving condenser water at full load.
Note 2. Normal pressure readings for ASME condenser exceed 12 PSIG.
Note 3. Oil tank pressure -9 to -6 psig HG Discharge oil pressure 7 to 15 PSIG
Daily Every 3 m onths Every 6 m onths Annual
Check the chiller?s evaporator and condenser pressures, oil tank pressure, differential oil pressure and discharge oil pressure. Compare the readings with the values provided in the above.
Check the oil level in the chiller oil sump using the two sight glasses provided in the oil sump head. When the unit is operating, the oil level should be visible in the lower sight glass
Complete logs on a daily basis
Clean all water strainers in the water piping system
Lubricate the vane control linkage bearings, ball joints, and pivot points. See Lubrication Procedure
Lubricate vane operator tang o-rings. See Lubrication Procedure
Lubricate the oil filter shutoff valve o-rings. See Step 7 in Oil Filter Replacement Procedure
Drain contents of the rupture disc and purge discharge ventline drip-leg into an evacuated waste container. Do this more often if the purge is operated excessively.
Apply oil to any exposed metal parts to prevent rust.
Shut down the chiller once each year to check the items listed on the Annual Inspection Checklist.
Perform the annual maintenance procedures referred to in the maintenance section of the purge manual
Use an ice water bath to verify that the accuracy of the evaporator refrigerant temperature sensor (4R10) is still within tolerance (+ or - 2.0° at 32°F (1° at 0°C)). If the evaporator refrigerant temperature displayed on the control panel read-out is outside this 4-degree tolerance range, replace the sensor. If the sensor is exposed to temperature extremes outside its normal operating range (0°F to 90°F) (-18°C to 32°C), check its accuracy at six-month intervals.
Inspect the condenser tubes for fouling; clean if necessary.
Submit a sample of the compressor oil to a Trane qualified laboratory for comprehensive analysis.
Measure the compressor motor winding resistance to ground; a qualified service technician should conduct this check to ensure that the findings are properly interpreted. Contact a qualified service organization to leak-test the chiller; this procedure is especially important if the system requires frequent purging.
Every 3 years use a nondestructive tube test to inspect the condenser and evaporator tubes.
Note: It may be desirable to perform tube tests on these components at more frequent intervals, depending upon chiller application. This is especially true of critical process equipment.
Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components.
Note: (a) Chronic air leaks, which can cause acidic conditions in the compressor oil and result in premature bearing wear; and, (b) Evaporator or condenser water tube leaks. Water mixed with the compressor oil can result in bearing pitting, corrosion, or excessive wear.
Top View Run Change Filter
Drain pipe connections circulator pump cleaning solution shutoff valves
Chiller tons (per circuit)
P u rg e m in u te s/ d a y large leak small leaks typical operation
Figure 4 2 . W aterbox r igging and lift ing - condenser and evaproator connections
Table 1 7 . CenTraVac Torque
Bot l Size I nch ( m m ) Gasket type O- r ing ft - lbs ( Nm ) Flat ft - lbs ( Nm )
3/ 8? (9.5) 25 (34) 12-18 (16-24)
1/ 2? (13) 70 (95) 33-50 (45-68)
5/ 8? (16) 150 (203) 70-90 (95-122)
3/ 4? (19) 250 (339) 105-155 (142-210)
Table 1 8 . CenTraVac W aterbox w eights
Fabricated Non-marine waterbox, welded flat plate
Non-m arine cast waterbox Fabricated Non-m arine waterbox welded dome
Marine style waterbox cover
Shell Size
Descr ipt ion Weight lbs (Kg)
Lifting Connection
Weight lbs (Kg)
Lifting Connection
Weight lbs (Kg)
Lifting Connection
Weight lbs (Kg)
Lifting Connection
Evaporator, 150 psi 265 (120) 3/ 4 - 10 NA NA NA NA 176 (80) 1/ 2 - 13
Evaporator, 300 psi
Condenser, 150 psi NA NA 176 (80) 1/ 2 - 13 NA NA 176 (80) 1/ 2 - 13
Condenser, 300 psi 265 (120) 3/ 4 - 10 NA NA NA NA 221 (100) 1/ 2 - 13
Evaporator, 150 psi 397 (180) 3/ 4 - 10 397 (180) Lift ing Fixture NA NA 265 (120) 1/ 2 - 13
Evaporator, 300 psi 353 (160) 3/ 4 - 10 NA NA NA NA 265 (120) 1/ 2 - 13
Condenser, 150 psi 265 (120) 1/ 2 - 13 265 (120) 1/ 2 - 13 NA NA 265 (120) 1/ 2 - 13
Condenser, 300 psi 551 (250) 3/ 4 - 10 NA NA NA NA 441 (200) 1/ 2 - 13
Evaporator, 150 psi 662 (300) 3/ 4 - 10 662 (300) Lift ing Fixture NA NA 441 (200) 3/ 4 - 10
Evaporator, 300 psi 882 (400) 3/ 4 - 10 NA NA NA NA 551 (250) 3/ 4 - 10
Condenser, 150 psi 551 (250) 3/ 4 - 10 551 (250) 3/ 4 - 10 NA NA 441 (200) 1/ 2 - 13
Condenser, 300 psi 882 (400) 3/ 4 - 10 NA NA NA NA 882 (400) 3/ 4 - 10
Evaporator, 150 psi 882 (400) 3/ 4 - 10 NA NA NA NA 662 ( 300) 3/ 4 - 10
Evaporator, 300 psi 1323 (600) 3/ 4 - 10 NA NA NA NA 882 (400) 3/ 4 - 10
Condenser, 150 psi 1543 (700) 3/ 4 - 10 NA NA 441 (200) 3/ 4 - 10 1323 (600) 3/ 4 - 10
Condenser, 300 psi 1985 (900) 3/ 4 - 10 NA NA NA NA 1764 (800) 3/ 4 - 10
Evaporator, 150 psi 1544 (700) 3/ 4 - 10 NA NA NA NA 1323 (600) 3/ 4 - 10
Evaporator, 300 psi 2205 (1000) 3/ 4 - 10 NA NA NA NA 1764 (800) 3/ 4 - 10
Condenser, 150 psi 2205 (1000) 3/ 4 - 10 NA NA 662 (300) 3/ 4 - 10 1764 (800) 3/ 4 - 10
Condenser, 300 psi 2867 (1300) 3/ 4 - 10 NA NA NA NA 2426 (1100) 3/ 4 - 10
Evaporator, 150 psi 1985 (900) 3/ 4 - 10 NA NA NA NA 1544 (700) 3/ 4 - 10
Evaporator, 300 psi 3087 (1400) 3/ 4 - 10 NA NA NA NA 2205 (1000) 3/ 4 - 10
Condenser, 150 psi 2867 (1300) 3/ 4 - 10 NA NA 662 (300) 3/ 4 - 10 2205 (1000) 3/ 4 - 10
Condenser, 300 psi 3528 (1600) 3/ 4 - 10 NA NA NA NA 3087 (1400) 3/ 4 - 10
Note: Refer to product block indentifier on the model number plate which identifies the evaporator and condenser shell sizes and the rated pressure. The designators are as follows:
Evaporator Size = EVSZ Condenser Size = CDSZ Evaporator Pressure = EVPR Condenser Pressure = CDPR Weights shown are maximum for waterbox size. Verify the waterbox from the latest published literature.
Unit Produt Part Num ber Order I nform at ion
CTV Safety Hoist Ring 3/ 4-10 RNG01884 Contact Trane Part Departm ent
CTV Safety Hoist Ring 1/ 2-13 RNG01885 Contact Trane Part Departm ent
CTV Evap Lift ing Fixture BAR00400 Contact Trane Part Departm ent
| Lockheed - Product Submittal Form |
| Subcontractor - Submittal Cover Sheet |
| Hazardous Material Review Submittal for Construction Contracts |
| Hazardous Materials Elimination List |
| Text28: |
| Text29: |
| Text30: |
| Text42: |
| Text44: |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Combo Box27: [F - For Reference; No Acceptance Required] |
| Combo Box28: [Mark Schluender] |
| Check Box1: Off |
| Check Box10: Off |
| Check Box9: Off |
| Check Box8: Off |
| Check Box7: Off |
| Check Box6: Off |
| Check Box5: Off |
| Check Box4: Yes |
| Check Box3: Off |
| Check Box2: Off |
| Text7: |
| Text8: 15685 |
| Text9: Electric Chiller O&M |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text43: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Text10: |
| Text22: |
| Text23: |
| Text31: |
| Text32: |
| Text33: P36494 |
| Text34: |
| Text1: GRU South Energy Center |
| Text2: 44220 44262 |
| Text4: |
| Text5: Trane |
| Text6: |
03300 Text11:
| Text12: |
| Text13: |
| Text15: 10/09/2008 |
| Text16: |
| Text18: Controls Enginner |
| Text19: |
| Text20: |
| Text21: |
| Text100: |
| Text101: |
| Text102: |
| Text103: |
| Text104: GRU South Energy Center |
| Text105: Burns & McDonnell |
| Text106: |
| Text107: Burns & McDonnell |
| Text108: |
| Text109: |
| Text113: |
| Text110: |
| Text111: |
| Text112: |
| Text114: |
| Text115: |
| Text116: |
| Text117: |
| Text118: |
| Text119: |
| Text120: |
| Text3: 1 |
File details come from the government source that posted it. Updated .