156-27-050 Scope of Work HVAC PM and On Call Services Div 7 Fairfax Locations.pdf
PDF 752 KB Posted
- Attached to
- 156-27-050 Division 7 Fairfax Locations : HVAC/Mechanical Preventative Maint. and On-Call Repair
- Solicitation number
- IFB-130383
- Issued by
- Fairfax County, Virginia
About this file
This Scope of Work document outlines HVAC and mechanical preventative maintenance and on-call repair services for Division 7 Fairfax Locations in Virginia. The contractor shall provide comprehensive preventative maintenance services to maintain HVAC systems in operational condition and provide emergency on-call repair services as needed. The scope covers routine inspections, filter replacements, system testing, and emergency response capabilities to address mechanical failures. A mandatory site visit is required for all bidders to assess the facilities and understand service requirements across the Fairfax locations. The contract term and specific response deadlines are referenced in the complete solicitation documentation, which bidders must consult for precise due dates and contract duration.
Pricing shall be submitted according to the format specified in the solicitation documents. The contract will be awarded based on evaluation criteria detailed in the bid package, with the incumbent contractor potentially retaining the work if their proposal remains competitive. Funding sources and budget allocations are established through the Virginia state or local government budget process. Bidders should review all supporting documentation, including any addenda and exhibits, to ensure full compliance with submission requirements and to understand the current condition of HVAC systems at the Fairfax locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 156-27-050 Division 7 Fairfax Repair Locations and Address.pdf | ||
| 156-27-050 UNVERIFIED Equipment List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF STATE POLICE
INVITATION FOR BIDS
(IFB)
Issue Date: October 19, 2027 IFB#: 156-27-050
Title: HVAC/Mechanical Preventative Maintenance and On-Call Repair Services Location: Division 7 Fairfax (Main Location AO/09 Fairfax) and Area Offices within the Division Commodity Code: 91036 Issuing Agency: 156 Department of Virginia State Police PO Box 27472 Richmond, VA 23261-7472
For Furnishing the Services Described Herein And Then Opened In Public.
Using Agency and/or Location Where Work Will Be Performed: Virginia State Police – Division 7 Fairfax : Main Facility / 9801 Braddock Road, Fairfax, VA 22032 : Area Office locations are listed in Attachment “E”
Term of Contract: From DATE OF AWARD through 1 year/ 12 months (*Renewable), anticipated start date January 1, 2027.
Sealed Bids Will Be Received Electronically Only : Until Monday, November 16 2026 at 10:00 am (EST) Public Bid Opening: Monday, November 16, 2026 at 2:00 pm (EST) (see page 3 for details)
All Inquiries for Information Should Be Directed to: Tammy Boyer, VCO, VCA, VCARM / email: tammy.boyer@vsp.virginia.gov
In compliance with this Invitation For Bids (IFB) and all conditions imposed in this IFB, the undersigned firm hereby offers and agrees to furnish all goods and services required by this IFB at the prices indicated in the pricing schedule, and the undersigned firm hereby certifies that all information provided below and in any schedule attached hereto is true, correct, and complete.
* Virginia Contractor License No. ________________________ Class: __________ Trades/Specialty Codes: _______________
Name and Address of Firm:
_____________________________________________ Date: ______________________________________ _____________________________________________ By: _______________________________________ _____________________________________________ (Signature In Ink) __________________________Zip Code:___________ Name: _____________________________________ eVA Vendor ID or DUNS #:______________________ (Please Print) Fax Number: (___) ____________________________ Title: ______________________________________ E-mail Address: _______________________________ Telephone: (___)_____________________________
* Mandatory Site Visit: B i d d e r s are required to inspect the site where service is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. See Section III.
Mandatory Pre-Bid Conference.
* If special ADA accommodations are needed, please contact Contract Administrator at the respective site and discuss prior to Mandatory visit. Contact F/Sgt Melissa Best at 703-323-4522
* This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia, § 2.2-4343.1 or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity, political affiliation, veteran status, status as a military family, or any other basis prohibited by state law relating to discrimination in employment. Faith-based organizations may request that the issuing agency not include subparagraph 1.f in General Terms and Condition C. Such a request shall be in writing and explain why an exception should be made in that invitation to bid or request for proposal.
TABLE OF CONTENTS
HVAC/Mechanical Preventative Maintenance and On-Call Repair Services
Division 7 Fairfax (Main Facility AO-09 Fairfax) Locations
I. Purpose II. Scope of Work III. Mandatory Site Visit Details IV. General Terms and Conditions V. Special Terms and Conditions VI. Method of Payment VII. Pricing Schedule
Attachments
• Attachment “A” – State Corporation Commission Form
• Attachment “B” – Vendor Data Sheet
• Attachment “C” – DPOR Certification/License
• Attachment “D” – Small Business Subcontracting Plan
• Attachment “E” – On-Call/Preventative Maintenance –
T & M Service Locations (Separate Attachment)
• Attachment “F” – Unverified Equipment List (Separate
Attachment)
Electronic Bid Submission Only :
Electronic bid submission, with required documents attached, is required. Bidders must be registered in eVA to submit an electronic bid.
The following provides information/instructions on reviewing and responding to solicitations in the new eVA platform.
a. Go to https://eva.virginia.gov
b. Click on "I Sell To Virginia";
c. Click on "eVA Supplier Training"; and
d. Click on "Viewing and Responding to Solicitations Video"
If a Bidder needs assistance submitting an electronic response, the Bidder must contact eVA Customer Care at 866-289-7367 or email eVACustomerCare@dgs.virginia.gov prior to the closing date and time.
If this is your first time submitting an electronic bid, it is strongly suggested your company click on the above training modules to ensure bid will be received prior to the closing date and time. You are encouraged to do this in advance of the required submission time for possible assistance from eVA customer care.
Bid Opening Information
Date : Monday, November 16, 2026 Time : 2:00 pm (EST)
Call in - Phone Number for bid opening:
Call In #: 434-230-0065 Pin #: 948688418# https://eva.virginia.gov/ mailto:eVACustomerCare@dgs.virginia.gov
Virginia State Police – Div 7 Fairfax Locations HVAC/Mechanical Preventive Maintenance and On-Call (T&M) Repair Services
IFB # 156-27-050
I. Purpose: The purpose of this Invitation for Bids (IFB) is to solicit sealed bids whereby a term contract may be established with one qualified firm for furnishing Mechanical Heating, Ventilation, and Air Conditioning (HVAC) Equipment; Scheduled Preventive Maintenance, Repair and Emergency Repair Services, and Special Projects associated with HVAC systems at Virginia State Police (VSP) locations listed herein.
Term of Contract : Upon award for (1) year / 12 months, Renewable, refer to Special Terms and Conditions, Paragraph 5, Renewal of Contract.
Contract Administrator Division (CA) : FSgt Melissa Best at 703-323-4522
Area Office Contract Administrators (CA) are listed on Attachment “E”
II. Scope of Work:
A. GENERAL Instructions for Division and Area Offices:
1. The Contractor shall provide all necessary labor, supervision, equipment and parts, tools, materials, supplies and incidentals to provide Mechanical HVAC Services at the Virginia State Police Division and Area Office listed within the solicitation.
2. Contractor shall have the proven ability and knowledge to perform all required Preventative Maintenance, Operational Inspections, On-Call repair Service, and Emergency Repair Services and have a clear understanding of Building Automation Systems based on the size and scope at each facility.
3. Preventive maintenance shall include all adjustments and services required to maintain the systems and equipment in accordance with the manufacturer’s specifications and at a minimum as described in section Scope of Work, paragraph B. and C. HVAC Preventative Maintenance Service. Operational inspections shall be conducted during quarterly filter replacement visits. Operational Inspections are defined but not limited to : any indication of deterioration, leaks, obstructions, or other problems that can impact the system’s functionality. The Contractor shall discuss with the CA any current or known issues prior to operation inspections. The Contractor shall observe the general operation of the system if any issues exist, investigate and advise CA or local CA. The contractor shall deliver to the Agency all copies of warranty certificates, maintenance manuals, and other pertinent data/documentation as it relates to replaced parts, components and equipment.
4. The Contractor shall not shut down any equipment in any facility, unless permission is first obtained from the CA of the affected facility location.
5. Inclement Weather, State Holidays and Shut Down: The Contractor shall make every reasonable effort to provide services during inclement weather and must schedule around State observed holidays. When VSP offices are closed or excused early because of inclement weather or for holidays, the Contractor shall coordinate with the CA of the affected facility to reschedule any services.
6. Security: The Contractor shall comply with the following VSP Security Policies and Procedures and may be subject to security inspections:
a. The Contractor’s employees’ that will be assigned to a location to be serviced are subject to VSP’s background check; including fingerprinting. Assigned Employees must not have a criminal history and must be insured. VSP must receive authorization from contractor employees via the background check process, along with the required fingerprinting (at no cost to the Contractor) by all VSP Facility assigned contractor personnel, upon award of contract and prior to beginning work at a VSP location. The background process is attached for reference only and may change during the contract term as required by VSP and instructions will be updated for contractor(s). The background process can take up to 4 weeks to complete. Only the Successful bidder(s) will complete this process. Contract Officer shall coordinate with successful bidder(s)the background process upon award of contract.
b. The Contractor’s personnel shall maintain a professional appearance and should wear a uniform/clothing that displays the Contractor’s logo. A photo Identification Card worn/visible, will be acceptable in lieu of a uniform that displays the Contractor’s logo. No shorts, cut-offs, or tank tops are permitted.
c. Do not attempt to access a locked or secured area unless under VSP escort.
7. All work shall be accomplished in compliance with all applicable Federal, State and Local laws, ordinances, rules, regulations, manufacturer’s recommended procedures, industry standards and codes including Virginia Occupational Safety and Health (VOSH) standards, and the Virginia Uniform Statewide Building Code issued by the Department of' Housing and Community Development that is in effect on the date of the purchase order. All work performed under this Contract shall be done in a manner that will not adversely affect the integrity of the building’s structural, mechanical, electrical, fire protection and life safety systems or any other building features that will overload or render useless any portion of the facility. Additionally, the Contractor shall remain in compliance with all Occupational Safety and Health Administration (OSHA) and VOSH personnel, equipment, and safety regulations.
8. The Contractor shall remove all excess material, trash, preparation debris from the work-site property.
B. DIVISION : HVAC Preventive Maintenance and T&M Repair Services
Division Headquarters Physical Address for Preventative Maintenance:
Division 7 Fairfax (Main Facility AO-09 Fairfax) Attn: F.Sgt Melissa Best 9801 Braddock Road Fairfax, VA 22032
1. Division Preventive Maintenance shall be performed annually with the exceptions for specific equipment requirements as listed below under Scope of Work, Paragraph B, Section 9: Equipment and PM Service Frequency.
2. On-call Time & Material (T&M) repair costs shall be invoiced at the hourly rates as submitted on bid. Overtime and holiday labor rates shall be one and one half (1-1/2) times the regular hourly rates. Parts and materials shall be invoiced at contractor cost and as a separate line item on the invoice. Supporting invoice and/or receipts for the parts and materials must be attached to the invoice prior to submittal to VSP Contract Administrator (CA) for payment.
3. The contractor shall furnish preventive maintenance service and on-call repair services as described within the scope of work. Contractor shall perform quarterly scheduled Division Preventative Maintenances and Operational Inspections during the following Quarters: Q1 (January-March) / Q2 (April-June) / Q3 (July-September) / Q4 (October-December).
4. No additional charges such as fuel, fuel surcharges and vehicle rental charges are allowed.
5. Hours for work performed on a time and materials basis under this Contract shall be paid only for productive work time on the job site: time spent for transportation of technicians or employees, material acquisition, handling and delivery of equipment and breaks for lunch or other nonproductive time the employees are away from the job site are not chargeable.
6. Established Round Trip/Travel Charge; One (1) round trip charge per visit is allowable.
Multi-site trips performed on the same day shall not incur multiple travel charges unless sites including VSP facilities or distributors exceed 50 miles apart.
7. Contractor shall commence preventive maintenance within fourteen (14) days after all required personnel have passed background checks. If clearance delays extend beyond 4 weeks, the contractor must provide an interim staffing plan to maintain required service levels. Contractor shall provide complete list of filters, belts, and consumables anticipated for each facility annually for CA pre-review. The Contractor shall coordinate the preventative maintenance services with the CA or local CA. The Contractor shall include but not be limited to the below listed items as the start point for preventive maintenance and as applicable to each piece of equipment:
a. Lubricate bearings as applicable;
b. Clean permanent filters and replace disposable air filters (high efficiency pleated filters – minimum efficiency /MERV 8); Replacement of disposable filters shall be executed under the provisions of the On-Call (Time & Material) part of the contract.
Contractor shall submit copy of distributors invoice to include the cost of filter(s) for payment. After initial assessment Contractor shall bring filters(s) to preventative maintenance scheduled visits for replacement. Replacement of filters and belts identified during scheduled PM shall be billed under T&M materials but must be pre-approved by the CA prior to replacement unless included in the approved PM baseline
c. Inspect all shafts and pulleys. Replace belts and adjust tension as needed.
Replacement of Belts(s) shall be executed under the provision of the ON-Call (Time and Material ) section of the contract. Contractor shall submit copy of distributors invoice to include the cost of belts for payment. After initial assessment, Contractor shall bring belt(s) to preventative maintenance scheduled visits for possible replacement ;
d. Check drain pan and drain line. Ensure that piping is intact and functioning properly.
Clean the drain pan and clear piping by suction;
e. Check condition of evaporator and condenser coils (clean if required) (send photo pre and post cleaning with service ticket) ;
f. Check refrigerant charge, if issue exists;
g. Check thermostat and controls, and adjust if necessary;
h. Check and tighten electrical connections. Replace worn or frayed connectors and wire;
i. Check gas or oil burner(s) and adjust if necessary;
j. Check economizer(s) and adjust if necessary;
k. Check and clean humidifier(s) if present;
l. Ventilation Fans: Verify functionality. Clean fan blades if necessary;
m. As applicable, Check dampers, linkages, and actuators for condition and proper operation (semi-annually).
n. If the BAS system is determined not functioning correctly, advise CA to contact BAS contractor for repair service.
Notes: If manufacturer's recommended service activities and frequency are different from those given above, the manufacturer's recommendations will govern.
8. Upon completion of the initial and all subsequent preventative maintenance services of the HVAC equipment, the contractor shall submit to the Contract Administrator a written report/assessment of the equipment only maintained by the preventative maintenance agreement as stated below.
a. The manufacturer, model and serial number;
b. A detailed, narrative statement as to the condition of the equipment indicating work that apparently has been performed previously and an estimate of the age of the equipment;
c. Specific recommendations for any major needed repair or modification which may be required to ensure continued operation or may enhance the operation of this equipment. If none, so indicate. The Agency reserves the right to solicit other sources for any needed repairs and modifications or direct the contractor to proceed in accordance with the pricing schedule established for work performed on a time and material basis;
d. A list of service items replaced for each ‘listed’ piece of equipment such as filter type, size, and number; drive belt size, type and number and any other information related to servicing the equipment.
Note: Submittal of the report is desired in a digital format and must be sent to the CA and Contact Officer within 30 days of the initial Preventative Maintenance Service of the contract.
9. Equipment and PM Service Frequency :
CHILLERS and CHILLED WATER SYSTEMS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than two annual services:
• System shut-down and servicing at the end of cooling season, and
• Start-up and system functional testing at the start of cooling season.
BOILERS and HEATING WATER SYSTEMS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than two annual services:
• System shut-down and servicing at the end of heating season, and
• Start-up and system functional testing at the start of heating season.
RTU’s (Roof Top Units/Package Units): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection;
• Quarterly filter replacement.
• Annual Preventative Maintenance.
SPLIT SYSTEMS (Condenser + Air Handler): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection;
• Quarterly filter replacement.
• Annual Preventative Maintenance.
MINI-SPLIT UNITS (Condenser + Air Handler): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection;
• Quarterly filter cleaning.
• Annual Preventative Maintenance.
WALL UNIT (ie. Bard): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection.
• Quarterly filter replacement.
• Annual Preventative Maintenance.
PACKAGED HEAT PUMP: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection.
• Quarterly filter replacement.
• Annual Preventative Maintenance.
VAV’s: (Variable Air Volumes)
• Quarterly filter replacement.
HVAC EXHAUST FANS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations annually.
FURNACE (Gas or Oil): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than two annual services:
• System shut-down and servicing at the end of heating season, and
• Start-up and system functional testing at the start of heating season.
PUMPS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations annually.
• Annual Preventative Maintenance;
LARGE AHU’s: (Air Handler Unit) Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection.
• Annual Preventative Maintenance shall be completed in March/April;
VFD’s (Variable Frequency Drives): Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations annually.
• Annual Preventative Maintenance;
FAN COILS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection.
• Annual Preventative Maintenance;
• Quarterly filter replacement.
COOLING TOWERS and CONDENSER WATER SYSTEMS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than two annual services:
• System shut-down and servicing at the end of cooling season, and
• Start-up and system functional testing at the start of cooling season.
HEAT EXCHANGER: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations annually.
• Annual Preventative Maintenance;
AIR DRYERS/Dehumidifiers: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection and one semi-annual operational inspection;
AIR COMPRESSORS: Inspections and maintenance shall be performed in accordance with manufacturer’s recommendations but not less than one annual inspection and one semi-annual operational inspection;
OUTSIDE AIR DAMPERS: Annually check functionality of dampers, damper actuators, and levers, clean and service as needed.
a. VSP reserves the right to add or delete HVAC equipment on an as needed basis.
Modification to the contract shall be agreed upon and executed via the contract modification process. This shall also include facilities/buildings being added or removed within the contract. VSP will provide notice of changes in a timely manner.
b. All repairable work that is identified during the PM’s and inspections in the above mechanical equipment; must be submitted by proposal to the CA and approved prior to any work being performed. The proposal shall comply with On-call repair services, labor and material costs as explained in section Scope of Work, Paragraph 11, DIVISION: On-call (time & material) maintenance and repair service.
10. BUILDING AUTOMATION SYSTEMS (BAS): Building Automation Systems will be maintained by a third party contractor. The VSP Contract Administrator shall serve as the coordination point between the HVAC contractor and the BAS contractor. HVAC contractor shall not initiate BAS-related troubleshooting or service requests without CA authorization. BAS-related delays impacting HVAC service timelines must be reported to CA within 24 hours, including cause, impact, and projected resolution. The successful bidder will be given the contact information of the third party contractor upon award of this contract.
11. DIVISION : On-Call (Time & Material) Maintenance and Repair Service:
a. The contractor shall provide on-call repair service upon request of the Agency. All service requests must be coordinated and logged through the Division CA, who will prioritize work orders and authorize dispatch. Contractor shall not respond to requests from other parties unless validated by CA.
b. A 24/7 On-Call Service shall be required along with a mechanic, dispatched within 4-hours of a request for emergency service. Emergency service is defined as any failure that (1) impacts critical operations, (2) creates a safety or security risk, or (3) results in loss of environmental control supporting mission-essential equipment.
Non-emergency service calls must be acknowledged within 4 hours and scheduled within 2 business days unless otherwise directed by VSP. Dispatched defined as technician is en route to facility. If repair cannot be completed within 24 hours, contractor must provide written justification and revised completion timeline.
When possible, the CA shall be presented with a detailed written estimate which shall include the contracted hourly rate and itemized material and parts at contractor cost prior to approval of any repair work done under this contract. The Agency reserves the right to solicit other sources if the Contractor’s estimate does not appear fair and reasonable. If the CA determines costs are not fair and reasonable, contractor will be given one opportunity to revise the estimate within 24 hours before alternate sourcing is pursued. Disputes regarding cost reasonableness shall be escalated to the VSP Procurement Manager for final determination
c. The contractor shall provide a clear and legible copy of the work order to the CA, showing all work performed; indicating the date and time of arrival and departure at the facility and shall include copies of material invoice/receipts cost (If available at the time the services were performed). Otherwise, the materials receipts shall be submitted with the invoice). Work orders shall have a statement that shall be signed by the contractor’s representative, that work was performed. A copy of the work order shall accompany invoices for payment.
d. The contractor shall notify the CA of any repairs which may be covered under the equipment manufacturer’s warranty or may be considered to result from defects in the equipment prior to proceeding with any work.
e. All parts furnished under this contract shall be new and OEM or authorized replacement parts. Use of manufacturers rebuilt parts may be authorized by the Agency on a case-by-case basis, provided each part is warranted for the same period and under the same conditions as the new part. Used parts are strictly prohibited.
f. Cost of repair parts shall be the actual price paid by the contractor to the manufacturer or distributor for the repair part. Each invoice submitted to the CA for payment shall contain a copy of the Contractor’s paid invoice/receipt for parts. This paid invoice/receipt must contain the distributor’s name, address and the line-item amount paid by the contractor for the part(s).
g. Additional Payable Expenses: TRUCK STOCK: Screws, clamps, wire ties, tape, etc.
may be listed on the invoice as miscellaneous and do not require invoice receipts amount not to exceed $ 25.00 per invoice. Contractor must maintain a minimum truck stock of standard HVAC components (belts, filters, contactors, fuses, etc.)
suitable for facilities within this contract. List to be approved annually by CA.
REFRIGERANT RECOVERY: Any service repairs that include the removal of refrigerant; which requires a refrigerant recovery machine, vacuum pump and incidentals including acetylene, oxygen and nitrogen may be listed on the invoice as Recovery Fees and shall not exceed $ 125.00 per invoice that the repair service is listed. CA will confirm on each invoice the recovery service was performed prior to approval of the invoice. These two additional payable expenses MUST be listed on invoice as Truck Stock and/or Refrigerant Recovery, if not then invoice will not be paid until listed correctly on the invoice.
h. Time and Material (T&M) Standard Hourly Rate for the first 12 months is the fixed hourly price, however, the hours may be adjusted up or down to meet actual hours required to execute the Time and Material work during the contract period.
i. In the event that new HVAC equipment is required, the Contractor shall have the opportunity to provide a proposal that shall include the T&M hourly rates and actual costs of equipment and materials to be used for replacement (change out) of equipment. The CA shall review to determine if price is deemed fair and reasonable.
VSP reserves the right to solicit other sources if estimate does not appear to be fair and reasonable. If the CA determines costs are not fair and reasonable, contractor will be given one opportunity to revise the estimate within 24 hours before alternate sourcing is pursued. Disputes regarding cost reasonableness shall be escalated to the VSP Procurement Manager for final determination
j. No additional charges such as fuel, fuel surcharges or vehicle rental charges are allowed.
k. Established Round Trip/Travel Charge; One (1) round trip charge per visit is allowable. Multi-site trips performed on the same day shall not incur multiple travel charges unless sites including VSP facilities or distributors exceed 50 miles apart.
l. Hours for work performed on a time and materials basis under this Contract shall be paid only for productive work time on the job site: time spent for transportation of technicians or employees, material acquisition, handling and delivery of equipment and breaks for lunch or other nonproductive time the employees are away from the job site are not chargeable.
12. Work Hours & On Call Repairs:
a. Normal business hours for the Agency are from 8:00 a.m. to 5:00 p.m. Monday through Friday. All preventive maintenance service shall be performed during normal working hours unless otherwise directed by the CA. (The Agency will be closed on all State observed holidays and at times for inclement weather.)
b. Authorized repair work, on a time and material basis, performed outside of normal work hours shall be paid at the overtime labor hourly rate of one and one-half times the normal labor rate. Overtime work must be approved prior to work being performed by CA.
c. Contractor employees shall check in and out with the CA or designee during normal work hours. Work to be performed during non-working hours shall be coordinated with the CA or designee.
C. AREA OFFICES: T&M Preventative Maintenances and Repair Services (including additional locations and tower locations)
1. Area Offices Preventive Maintenances shall be performed annually with the exceptions for specific equipment requirements as listed below under Equipment and PM Service Frequency.
Contractor shall provide the Preventative Maintenances and Filter replacement service as T&M services utilizing section V. Special Terms and Conditions, paragraph 25. for invoicing these services.
2. Contractor shall coordinate Area Offices Annual Preventative Maintenance with Local Contract Administrator (CA). Area Offices Annual Preventative Maintenance for each area office is preferred to be completed by the end of May of each year. Permanent filters and replaceable disposable air filters shall be serviced during the following Quarters: Q1 (January-March) / Q2 (April-June) / Q3 (July-September) / Q4 (October-December); efficiently during the annual Preventative Maintenance one filter service shall be performed.
3. Area Offices Operational Inspections may include any indication of deterioration, leaks, obstructions, or other problems that can impact the system’s functionality. Area Offices Operational inspections shall be conducted during quarterly filter replacement visits. Contractor shall discuss with CA any current or known issues prior to operations inspection. Contractor shall observe the general operation of the system, if any issues exist, investigate and advise CA.
4. Contractor shall provide complete list of filters, belts, and consumables anticipated for each facility annually for CA pre-review. Replacement of filters and belts identified during scheduled PM shall be billed under T&M materials but must be pre-approved by the CA prior to replacement unless included in the approved PM baseline.
5. Area Office’s Potential Equipment List: Preventative Maintenance Checklist and Frequency :
Heat Pump split systems up to 7.5 ton (ducted):
Annual (preferably in late spring):
Clear both condensate drain lines at the AHU pan, and the overflow drain pan.
Drain Pan - float interlock test: verify float functionality to interlock the system. One initial PM visit, if float does not exist, install one (attic and indoors locations only).
Crawl space AHU installation does not require one;
Check evaporator and condenser coils for cleanliness, clean if needed (send photo pre and post cleaning with service ticket);
Check overall system operation Quarterly:
Clean permanent filters and replace disposable air filters (high efficiency pleated filters – minimum efficiency /MERV 7); Replacement of disposable filters shall be executed under the provisions of the On-Call (Time & Material) part of the contract.
Contractor shall submit copy of Distributors invoice to include the cost of filter(s) for payment. After initial assessment Contractor shall bring filters(s) to preventative maintenance scheduled visits for replacement.
Ductless mini split systems:
Annual:
Check drain pan and clear drain line. Ensure that piping is intact and functioning properly.
Check coil for cleanliness, clean if needed (send photo pre and post cleaning with service ticket).
Check overall system operation.
Quarterly:
Pull out and clean air screen.
Package Units: Straight AC and Heat Pumps, Ground and Rooftop, and DX units:
Annual:
Clean drain pan and clear drain line. Ensure that piping is intact and functioning properly.
Check evaporator and condenser coils for cleanliness, clean if needed (send photo pre and post cleaning with service ticket).
Check overall system operation.
Quarterly:
Clean permanent filters and replace disposable air filters (high efficiency pleated filters – minimum efficiency /MERV 7); Replacement of disposable filters may be executed under the provisions of the On-Call (Time & Material) part of the contract.
Contractor shall submit copy of Distributors invoice to include the cost of filter(s) for payment. After initial assessment Contractor shall bring filters(s) to preventative maintenance scheduled visits for replacement.
Cooling towers:
Annual:
Clean basin.
Clean water filters, replace as necessary Check injectors for proper spray pattern.
Remove hard water deposits from the heat transfer plates.
Check operation per manufacturer.
Semi-annual:
Once for system shut-down and servicing at the end of cooling season, and once for start-up and system functional testing at the start of cooling season.
Large Air Handler Units:
Annual:
Check operation including outside air louvers, fan bearings, vibration, motor.
Inspect fan belts, replace if needed.
Check evaporator coils for cleanliness, clean if needed (send photo pre and post cleaning with service ticket).
Check overall system operation.
Clean drain pan and clear drain line. Ensure that piping is intact and functioning properly.
Quarterly:
Clean permanent filters and replace disposable air filters (high efficiency pleated filters – minimum efficiency /MERV 7); Replacement of disposable filters may be executed under the provisions of the On-Call (Time & Material) part of the contract.
Contractor shall submit copy of Distributors invoice to include the cost of filter(s) for payment. After initial assessment Contractor shall bring filters(s) to preventative maintenance scheduled visits for replacement.
Chillers (air cooled and water cooled):
Annual:
Per manufacturers recommendations.
Semi-annual:
Once for system shut-down and servicing at the end of cooling season, and once for start-up and system functional testing at the start of cooling season.
Boilers:
Annual:
Per manufacturers recommendation at a minimum: drain, clean tubes, check igniter, check flue damper, check overall boiler operation.
Check all systems safeties.
Semi-annual:
Once for system shut-down and servicing at the end of heating season, and once for start-up and system functional testing at the start of heating season.
6. AREA OFFICE, AIRPORT and other locations: On-Call (Time & Material) Maintenance and Repair
Service:
a. The contractor shall provide on-call repair service upon request of the Agency. All service requests must be coordinated and logged through the CA, who will prioritize work orders and authorize dispatch. Contractor shall not respond to requests from other parties unless validated by CA
b. A 24/7 On-Call Service shall be required along with a mechanic, dispatched within 4-hours of a request for emergency service.
Emergency service is defined as any failure that (1) impacts critical operations, (2) creates a safety or security risk, or (3) results in loss of environmental control supporting mission-essential equipment. Non-emergency service calls must be acknowledged within 4 hours and scheduled within 2 business days unless otherwise directed by VSP.
Dispatched defined as technician is en route to facility. If repair cannot be completed within 24 hours, contractor must provide written justification and revised completion timeline. When possible, the CA shall be presented with a detailed written estimate which shall include the contracted hourly rate and itemized material and parts at contractor cost prior to approval of any repair work done under this contract. The Agency reserves the right to solicit other sources if the Contractor’s estimate does not appear fair and reasonable. If the CA determines costs are not fair and reasonable, contractor will be given one opportunity to revise the estimate within 24 hours before alternate sourcing is pursued. Disputes regarding cost reasonableness shall be escalated to the VSP Procurement Manager for final determination.
c. The contractor shall provide a clear and legible copy of the work order to the VSP CA, showing all work performed; indicating the date and time of arrival and departure at the facility and shall include copies of material invoice/receipts cost (If available at the time the services were performed). Otherwise, the materials receipts shall be submitted with the invoice). Work orders shall have a statement that shall be signed by the contractor’s representative, that work was performed. A copy of the work order shall accompany invoices for payment.
d. The contractor shall notify the VSP CA of any repairs which may be covered under the equipment manufacturer’s warranty or may be considered to result from defects in the equipment prior to proceeding with any work.
e. All parts furnished under this contract shall be new and OEM or authorized replacement parts. Use of manufacturers rebuilt parts may be authorized by the Agency on a case-by-case basis, provided each part is warranted for the same period and under the same conditions as the new part. Used parts are strictly prohibited.
f. Cost of repair parts shall be the actual price paid by the contractor to the manufacturer or distributor for the repair part. Each invoice submitted to the VSP CA for payment shall contain a copy of the
Contractor’s paid invoice/receipt for parts. This paid invoice/receipt must contain the distributor’s name, address and the line-item amount paid by the contractor for the part(s).
g. Additional Payable Expenses: TRUCK STOCK: Screws, clamps, wire ties, tape, etc. may be listed on the invoice as miscellaneous and do not require invoice receipts amount not to exceed $ 25.00 per invoice.
Contractor must maintain a minimum truck stock of standard HVAC components (belts, filters, contactors, fuses, etc.) suitable for facilities within this contract. List to be approved annually by CA. REFRIGERANT RECOVERY: Any service repairs that include the removal of refrigerant;
which requires a refrigerant recovery machine, vacuum pump and incidentals including acetylene, oxygen and nitrogen may be listed on the invoice as Recovery Fees and shall not exceed $ 125.00 per invoice that the repair service is listed. CA will confirm on each invoice the recovery service was performed prior to approval of the invoice. These two additional payable expenses MUST be listed on invoice as Truck Stock and/or Refrigerant Recovery, if not then invoice will not be paid until listed correctly on the invoice
h. Time and Material (T&M) Standard Hourly Rate for the first 12 months is the fixed hourly price, however, the hours may be adjusted up or down to meet actual hours required to execute the Time and Material work during the contract period.
i. In the event that new HVAC equipment is required, the Contractor shall have the opportunity to provide a proposal that shall include the T&M hourly rates and actual costs of equipment and materials to be used for replacement (change out) of equipment. The CA shall review to determine if price is deemed fair and reasonable. VSP reserves the right to solicit other sources if estimate does not appear to be fair and reasonable. If the CA determines costs are not fair and reasonable, contractor will be given one opportunity to revise the estimate within 24 hours before alternate sourcing is pursued.. Disputes regarding cost reasonableness shall be escalated to the VSP Procurement Manager for final determination
j. No additional charges such as fuel, fuel surcharges or vehicle rental charges shall be allowed.
k. Hours for work performed on a time and materials basis under this Contract shall be paid only for productive work time on the job site:
time spent for transportation of workers, material acquisition, handling and delivery of equipment and breaks for lunch or other nonproductive time the employees are away from the job site are not chargeable.
L. Established Round Trip/Travel Charge; One (1) round trip charge per visit is allowable. Multi-site trips performed on the same day shall not incur multiple travel charges unless sites including VSP facilities or distributors exceed 50 miles apart.
7. Work Hours & On Call Repairs:
a. Normal business hours for the Agency are from 8:00 a.m. to 5:00 p.m.
Monday through Friday. All preventive maintenance services shall be performed during normal working hours unless otherwise directed by the CA. (The Agency will be closed on all State observed holidays and at times for inclement weather.)
b. Authorized repair work, on a time and material basis, performed outside of normal work hours shall be paid at the overtime labor hourly rate of one and one-half times the normal labor rate. Overtime work must be approved prior to work being performed by CA.
c. Contractor employees shall check in and out with the CA or designated representative during normal work hours. Work to be performed during non-working hours shall be coordinated with the CA or designee.
D. Contractor’s Experience and Personnel:
1. Contractor must have valid Contractor’s Class “A” License through the Commonwealth of
Virginia Department of Professional Occupational Regulation (DPOR).
2. The contractor and contractor’s assigned personnel shall have sufficient proven experience in the commercial mechanical, heating, air conditioning, temperature control, building automation, and components service business and demonstrate familiarity and knowledge with the existing equipment of same size and scope in this contract.
3. The Contractor shall provide a sufficient number of qualified supervisors and employees to physically inspect, monitor, and supervise the Contractor’s employees and technicians, ensuring adherence to the work schedule and quality of work. The supervisor shall be able to speak and read English fluently.
4. All services shall be performed by Journeyman HVAC tradesman technicians with valid license through the Commonwealth of Virginia Department of Professional Occupational Regulation (DPOR), who are qualified through factory or other training to work on the specific makes and types of commercial grade equipment to be repaired and/or serviced and are directly employed and supervised by the contractor. A valid Master HVAC tradesman employee shall be available to supervise on-call repair services performed at any locations within the contract during all work hours. VSP reserves the right to reject contractor’s service personnel who, in the judgment of the Agency, are not adequately qualified to perform the work.
5. The contractor shall provide a company contact and phone number for all inquiries and service calls during regular business hours and after regular business hours.
6. The Contractor’s Supervisor shall be responsible for the conduct and performance of the
Contractor’s employees and subcontractor employees; and compliance with the following rules:
a. Contractor’s employees appearing to be under the influence of alcohol, marijuana or drugs shall not be permitted on the property.
b. No loud or boisterous conduct will be permitted.
c. VSP reserves the right to request the removal of any of the Contractor’s employees at any time for reasonable cause. The Contractor or designated Supervisor shall have such employees leave VSP premises upon receipt of such request.
d. The Contractor shall employ a sufficient number of experienced personnel to adequately perform all the specified services at the frequency and at the standard specified herein.
e. All VSP facilities are “Smoke-Free”. No use of tobacco products will be permitted on VSP property with the exception of designated areas for such activities.
f. Unauthorized Personnel: The Contractor’s employees are not to be accompanied in their work areas or on the premises by acquaintances, family members, or any other person unless said person is an authorized contractor’s employee performing work under the contract.
III. Mandatory Pre-bid Conference/Site Visit :
MANDATORY PREBID CONFERENCE: A mandatory pre-bid conference will be held at the location listed below. The purpose of this conference is to allow potential bidders an opportunity to present questions and obtain clarification relative to any facet of this solicitation.
The MANDATORY Pre-bid conference Date, Time and Location Address follows:
Location Name: Division 7 Fairfax Address: 9801 Braddock Road, Fairfax, VA 22032 Date: Monday, November 2, 2026 Time: 9:30 am (EST) CA Information: F.Sgt Melissa Best at 703-323-4522
Due to the importance of all bidders having a clear understanding of the specifications/scope of work and requirements of this solicitation, attendance at this conference will be a prerequisite for submitting a bid. Bids will only be accepted from those bidders who are represented at this pre-bid conference. Attendance at the conference will be evidenced by the representative’s signature on the attendance roster. No one will be admitted after 9:35 am (EST) at the receptionist’s desk.
Bring a copy of the solicitation with you. Any changes resulting from this conference will be issued in a written addendum to the solicitation.
IV. General Terms and Conditions
A. VENDORS MANUAL: This solicitation is subject to the provisions of the Commonwealth of Virginia Vendors Manual and any changes or revisions thereto, which are hereby incorporated into this contract in their entirety. The process for filing a complaint about this solicitation is in section 7.13 of the Vendors Manual. (Note section 7.13 does not apply to protests of awards or formal contractual claims.) The procedure for filing contractual claims is in section 7.19 of the Vendors Manual. A copy of the manual is normally available for review at the purchasing office and is accessible on the Internet at eva.virginia.gov under “I Sell To Virginia”.
B. APPLICABLE LAWS AND COURTS: This solicitation and any resulting contract shall be governed in all respects by the laws of the Commonwealth of Virginia, without regard to its choice of law provisions, and any litigation with respect thereto shall be brought in the circuit courts of the Commonwealth. The agency and the contractor are encouraged to resolve any issues in controversy arising from the award of the contract or any contractual dispute using Alternative Dispute Resolution (ADR) procedures (Code of Virginia, § 2.2-4366). ADR procedures are described in Chapter 9 of the Vendors Manual. The contractor shall comply with all applicable federal, state and local laws, rules and regulations.
C. ANTI-DISCRIMINATION: By submitting their bids, bidders certify to the Commonwealth that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and § 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipient's religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender sexual orientation, gender identity, or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body. (Code of Virginia, § 2.2-4343.1E). In every contract over $10,000 the provisions in 1. and 2. below apply:
1. During the performance of this contract, the contractor agrees as follows:
A. The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
B. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that such contractor is an equal opportunity employer.
C. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.
D. If the contractor employs more than five employees, the contractor shall (i) provide annual training on the contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the https://eva.virginia.gov/index.html
Department of Human Resource Management, and (ii) post the contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the contractor owns or leases for business purposes and (b) the contractor's employee handbook.
E. The requirements of these provisions 1. and 2. are a material part of the contract. If the Contractor violates one of these provisions, the Commonwealth may terminate the affected part of this contract for breach, or at its option, the whole contract.
Violation of one of these provisions may also result in debarment from State contracting regardless of whether…