154-WPC_85_201_1_-_A.pdf

PDF 5 MB Posted

Attached to
USCGC Issac Mayo Pre-Alignment, Alignment, Post-Alignment Verification
Solicitation number
52050PR260000154
Issued by

About this file

This document is a comprehensive technical specification and installation manual for propulsion systems used in naval vessels, specifically detailing the FRC-B Propulsion Plant Combined Installation Procedure and Ship Service Diesel Generator (SSDG) Installation Procedure, along with associated component specifications and engineering drawings.

The document covers multiple propulsion system configurations including the FRC-B propulsion plant, ITW Polymer Technologies chockfast orange polymer installation procedures, and SSDG installations with detailed technical requirements for mounting, alignment, and operational parameters. Key specifications include compression strength requirements (4,000 ± 2,050 KSI/in²), tensile strength (590 ± 140 KSI), shear strength (1,970 KSI), and compressive modulus (3.0 ± 0.20 KSI/in²). The installation procedures detail precise measurement requirements using Starrett parallel gauges, foundation arrangement specifications with detailed mount measurements for various configurations (MDE with MTU P/N X52623100058 kZ, SSDG with HD 10.103.35 mounts, EDG configurations), and excursion tables accounting for load cases under different operating conditions. Mounting instructions specify bolt preparation, cleanliness requirements, torque specifications ranging from 6 ft-lbs to 325 ft-lbs depending on bolt size, and sequential tightening patterns. The technical drawings include plan views, elevation sections, detail callouts for engine mounting hardware, gearbox sensor locations, and comprehensive component labeling across 48 pages of engineering documentation issued by the Office of Naval Engineering for the 154FT Fast Response Cutter propulsion system (SSDG.EDG).

View the file

Other files

File Type Posted
WAGE RATES 2015-4583.pdf PDF
SOW Alignment.pdf PDF
Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERATOR END SOLE PLATE

ENGINE END SOLE PLATE

SSDG FOUNDATION ARRANGEMENT WITH MOUNTS SHOWN

MOUNT MEASUREMENTS USING A STARRETT PARALLEL GAUGE #154E

154-WPC_85_201_-_-_A
154-WPC_85_201_1_A_A
154-WPC_85_201_1_B_A
154-WPC_85_201_1_C_A
154-WPC_85_201_1_D_A
154-WPC_85_201_1_E_A
154-WPC_85_201_1_F_A
154-WPC_85_201_2_-_A
154-WPC_85_201_3_-_A
154-WPC_85_201_4_-_A
154-WPC_85_201_5_-_A
154-WPC_85_201_6_-_A

File details come from the government source that posted it. Updated .