SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
California Office of the Director
John E Moss Federal Bldg
650 Capitol Mall, Suite 7-100 Sacramento CA 95814
Ms. Rachel Rosas
IHS, California Area Office 650 Capitol Mall, Suite 7-100 Sacramento, California 95814
RACHEL ROSAS 916-930-3981
x
08/06/2015
15-235-SOL-00015
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This is an Invitation for Bid (IFB) for the Construction of Individual Water and
Waste Water Systems for Native American Tribes, San Diego, Riverside, and Northwest
Imperial Counties, California.
This requirement is being solicited and subsequently awarded with a base period (365 calendar days) and one, one-year option period (365 calendar days). Exercise of the option period will be contingent upon successful performance in accordance with the terms and conditions of the subsequent contract and individual Task Orders. Each individual Task Order will have its own unique separate period of performance.
Contractor must possess a valid California State General Engineering Contractor, Class A Contractor's License (see Section K).
This is being solicited as a firm, fixed-price requirements contract with no minimum guarantee nor is there a guarantee of future Task Orders, reference FAR
16.503--Requirements Contracts. The values associated with each period of performance are estimated and are not guaranteed:
Base Period: $330,000.00
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
Reference Section F.
09/07/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
California Office of the Director John E Moss Federal Bldg
650 Capitol Mall, Suite 7-100 Sacramento CA 95814
RICK P. VREDENBURG
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 244
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
15-235-SOL-00015
Option Period: $365,000.00
Aggregate NTE Value: $695,000.00
Bonds. A Bid Bond is required and due at time of submission of bid. Performance and Payment Bonds are due at the Task Order level, see Section
H--Special Contract Requirements.
Magnitude of Construction: Between $500,000.00 and $1,000,000.00.
FOB: Destination
1 Base Period.
The Contractor is to furnish all labor, materials, equipment, transportation, and supplies necessary to construct individual water and waste water systems for Native Americans in
San Diego, Riverside, and northwest Imperial
Counties, California. All work shall be performed in accordance with the attached Pricing Schedule, Special Provisions, Submittal Requirements, Technical Sections and Exhibits, and the contract's clauses and provisions.
All work shall be performed in accordance with the terms and conditions of the contract and subsequent Task Orders.
Period of Performance: 09/14/2015 to 09/13/2016
2 Option Period.
The Contractor is to furnish all labor, materials, equipment, transportation, and supplies necessary to construct individual water and waste water systems for Native Americans in
San Diego, Riverside, and northwest Imperial
Counties, California. All work shall be performed in accordance with the attached Pricing Schedule, Special Provisions, Submittal Requirements, Technical Sections and Exhibits, and the contract's clauses and provisions.
All work shall be performed in accordance with the terms and conditions of the contract and subsequent Task Orders.
(Option Line Item)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 244
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
15-235-SOL-00015
08/12/2016
Period of Performance: 09/14/2016 to 09/13/2017
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM EST QTY U/M U/P TOTAL
101 Imported Pipe Embedment - TP 02200 4 YD3 $ $ 102 Paved Utility Road Crossing (Open Cut) - TP 02228 30 LF $ $ 103 Solid Rock Removal - TP 02229 2 YD3 $ $ 104 4-Inch PVC Water Main - C900, CL 150 - TP 02667 400 LF $ $ 105 2-inch Flush Hydrant Assembly - TP 02667 2 EA $ $
106 1 EA $ $
107 1 EA $ $
108 Air Release Combination Valve - TP 02667 1 EA $ $ 109 Connection to Existing Water Main - TP 02667 2 EA $ $
110 1,800 LF $ $
111 150 LF $ $
112 300 LF $ $
113 13 EA $ $
114 2 EA $ $
115 Connection to Existing Utilities - TP 02668 4 EA $ $ 116 House Connection without PRV- TP 02668 8 EA $ $
117 7 EA $ $
118 13 EA $ $
119 8 EA $ $
120 6 EA $ $
121 1 EA $ $
122 3 EA $ $
123 7 EA $ $
124 3 EA $ $
125 2,100 LF $ $
126 15 EA $ $
127 3,150 LF $ $
128 10 EA $ $
129 5 EA $ $
130 1 EA $ $
131 1 EA $ $
132 60 HR $ $
132 45 HR $ $
133 ** EA ** **
134 ** EA ** **
Option Year Bid Schedule is continued on following pages.
Water Service Connection Fees Sewer Service Connection Fees
Distribution Box - TP 02741 Flow Divider - TP 02740 Diversion Valve - TP 02740 Screened Baffle - TP 02740 Potholing - TP 02200 Mobilization/Demobilization
$SUBTOTAL BASE PERIOD
Connection to Existing Septic Tank Septic Tank Manhole Riser - TP 02740 Septic Tank Abandonment - TP 02740
A. 1-Inch PE B. 1-inch PVC D. 2-inch PVC
House Connection with PRV- TP 02668 Water Meter and Box - TP 02668 Septic Tank - TP 02740 A. 1200-Gallon B. 1500-Gallon C. 1200-Gallon Traffic Rated
BID SCHEDULE - BASE YEAR
A. 2-Inch B. 4-Inch
Gate Valve and Box - TP 02667
Water Serviceline - TP 02668
Water Service Connection - TP 02668 A. 1-Inch B. 2-Inch
The following Bid Schedule is based on estimated quantities required to meet the specifications. The total extended prices shall be used for bid evaluation purposes only. The actual amount to be paid by the Government under the contract shall be computed on the actual quantities installed at the unit bid prices awarded. Work performed under the contract will be ordered by issuance of delivery orders in accordance with clause 52.216-18 Ordering (See Section I). The designated ordering office is the Contracting Office, Indian Health Service Service/California Area Office, Sacramento, CA.
DESCRIPTION
Base Year (From Contract Award to one Year from Date of Award)
4-Inch PVC Solid Sewer Pipe - TP 02740 4-Inch PVC Sewer Service Cleanout - TP 02740 Chamber Drainfield - TP 02740
ITEM EST QTY U/M U/P TOTAL
101 4 YD3 $ $
102 50 LF $ $
103 2 YD3 $ $
104 400 LF $ $
105 2 EA $ $
106 1 EA $ $
107 1 EA $ $
108 1 EA $ $
109 2 EA $ $
110 1,800 LF $ $
111 150 LF $ $
112 300 LF $ $
113 11 EA $ $
114 2 EA $ $
115 4 EA $ $
116 8 EA $ $
117 7 EA $ $
118 13 EA $ $
119 8 EA $ $
120 6 EA $ $
121 1 EA $ $
122 3 EA $ $
123 7 EA $ $
124 3 EA $ $
125 4-Inch PVC Solid Sewer Pipe - TP 02740 2,100 LF $ $ 126 4-Inch PVC Sewer Service Cleanout - TP 02740 15 EA $ $
127 3,150 LF $ $
128 10 EA $ $
129 5 EA $ $
130 1 EA $ $
131 1 EA $ $
132 60 HR $ $
132 45 HR $ $
133 ** EA ** **
134 ** EA ** **
Flow Divider - TP 02740 Diversion Valve - TP 02740 Screened Baffle - TP 02740 Potholing - TP 02200 Mobilization/Demobilization
SUBTOTAL OPTION YEAR ONE
C. 1200-Gallon Traffic Rated Connection to Existing Septic Tank Septic Tank Manhole Riser - TP 02740 Septic Tank Abandonment - TP 02740
Chamber Drainfield - TP 02740 Distribution Box - TP 02741
House Connection without PRV- TP 02668 House Connection with PRV- TP 02668 Water Meter and Box - TP 02668 Septic Tank - TP 02740 A. 1200-Gallon B. 1500-Gallon
B. 1-inch PVC D. 2-inch PVC Water Service Connection - TP 02668 A. 1-Inch B. 2-Inch Connection to Existing Utilities - TP 02668
A. 2-Inch B. 4-Inch Air Release Combination Valve - TP 02667 Connection to Existing Water Main - TP 02667 Water Serviceline - TP 02668 A. 1-Inch PE
Imported Pipe Embedment - TP 02200 Paved Utility Road Crossing (Open Cut) - TP 02228 Solid Rock Removal - TP 02229 4-Inch PVC Water Main - C900, CL 150 - TP 02667
Sewer Service Connection Fees Water Service Connection Fees
2-inch Flush Hydrant Assembly - TP 02667 Gate Valve and Box - TP 02667
Option Year (From Contract Award to one Year from Date of Award)
BID SCHEDULE - OPTION YEAR
The following Bid Schedule is based on estimated quantities required to meet the specifications. The total extended prices shall be used for bid evaluation purposes only. The actual amount to be paid by the Government under the contract shall be computed on the actual quantities installed at the unit bid prices awarded. Work performed under the contract will be ordered by issuance of delivery orders in accordance with clause 52.216-18 Ordering (See Section I). The designated ordering office is the Contracting Office, Indian Health Service Service/California Area Office, Sacramento, CA.
DESCRIPTION
TOTAL BASE YEAR:
TOTAL OPTION YEAR:
TOTAL BID
1 Prices must be submitted on all individual items of this CLIN schedule. Failure to do so may cause the proposal to be determined "unacceptable."
2 If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the CLIN schedule must be stated. If it is not stated, the Offeror/Bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the CLIN schedule.
3 The Offeror/Bidder shall distribute his indirect costs (overhead, profit, bond, etc) over all the items in the CLIN schedule. The Government will review all submitted CLIN schedules for any unbalancing of the items. Any submitted CLIN schedule determined to be unbalanced may cause the proposal to be determined "unacceptable."
4 In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the Offeror/Bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
5 Arithmetic Discrepancies. For the purpose of initial evaluation of bids the following will be utilized in resolving arithmetic discrepancies found on the face of the CLIN schedule as submitted by the bidder.
(a) Obviously misplaced decimal points will be corrected;
(b) Discrepancy between unit price and extended price, the unit price will govern;
(c) Apparent errors in extension of unit prices will be corrected;
(d) Apparent errors in addition of lump sum and extended prices will be corrected.
For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepanies as provided above and the bid will be so reflected on the abstract of bids.
These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
6 Dewatering prices will be negotiated on a site specific basis.
7 Water Service Connection Fees and Sewer Service Connection Fees** The cost of these fees will be reimbursed as indicated on each delivery order at the actual cost of the connection or permitting fees.
PRICING SCHEDULE NOTES
SPECIAL PROVISIONS
C.1 SCOPE OF WORK
The work to be done under this contract consists of furnishing all labor, materials, equipment, and supervision necessary to construct individual wastewater disposal systems, short water main extensions, individual water service lines, water meter installations, system connections and other required appurtenances in accordance with the attached drawings and specifications.
Work is to be performed at or near residences located in San Diego, Riverside and northwest Imperial Counties, California.
It is estimated that 20 septic tank drainfield systems and 15 water service lines will be installed during the base and option year.
The individual septic tank drainfield systems will consist of a septic tank and either a gravel, chamber drainfield system, or seepage pit. It is estimated that water main extensions with flush hydrants and gate valves will be required for the base and option year.
C.2 SITE CONDITIONS
The Contractor shall determine actual site conditions with regard to surface vegetation and other miscellaneous obstacles to construction. The Contractor shall perform, at no additional cost, all necessary clearing, grubbing, and disposal of these and other obstacles in order to do work required by the contract.
Locations, materials, and sizes of any utilities shown are approximate only and are not meant to be a complete representation of all utilities actually present. The Contractor shall determine exact locations and details from the responsible utility authority.
C.3 CONTRACT DOCUMENTS
A maximum of 5 sets of contract drawings and specifications will be furnished without charge to the Contractor at award of this contract, except applicable publications incorporated by reference which will be furnished on request at the cost of reproduction.
C.4 DAYS OF WORK
Construction work shall not be normally permitted on Saturdays, Sundays, Federal or
Tribal holidays. The Contractor may submit a written request to the Project Engineer for permission to work on any Saturday, Sunday, Federal, or Tribal holiday. Written approval from the Contracting Officer must be obtained before the Contractor may work on any such day.
C.5 LAWS AND PERMITS AFFECTING WORK
The Contractor shall at all times observe and comply with Federal, State, City, and County laws, Tribal ordinances and regulations which in any manner affect the conduct of the work; and all such orders and decrees as exist at the present and which may be enacted later by legislative bodies or tribunals having legal jurisdiction or authority over the work. All other required permits, certificates and licenses shall be obtained by and at the expense of the Contractor. No pleas of misunderstanding or ignorance thereof will be considered. The Contractor shall be wholly responsible for any claim or liability arising from or based on the violation of any such law, ordinance, regulation, order or decree.
C.6 RIGHTS-OF-WAY
The Government shall obtain from the Tribe rights-of-way and easements necessary to install facilities located specifically by the plans and specifications.
C.7 MAINTENANCE OF UTILITIES AND SITE FACILITIES
The Contractor is responsible to determine the exact location of any and all utilities not specifically located on the plans and to protect them from damage during construction.
Should any utility be damaged or disturbed, the Contractor shall immediately notify the Project Engineer and the owner of the damaged utility. Any and all damage that results from work under the contract shall be promptly repaired at the expense of the Contractor.
During the progress of work, the Contractor shall protect all existing vegetation, structures, sidewalks, streets, mailboxes, ditches, culverts, signposts, fences, driveways, and similar items. If the Contractor must remove or disturb these facilities, provision shall be made to maintain a temporary facility serving the same purpose as that which it was intended to replace. Destruction of vegetation shall be kept to a minimum. Upon completion of the work, the Contractor shall restore all such facilities to a condition at least equal to that existing prior to construction. The Contractor shall not obstruct access to the site.
The Contractor shall perform his work at all times in a manner to ensure minimal obstruction to traffic and minimal inconvenience to the general public.
C.8 CONTRACT SUBMITTAL REQUIREMENTS
The Contractor shall furnish material submittals, design submittals, shop drawings, test reports, and as-built drawings in accordance with the requirements detailed in the Contract Submittal Requirements section.
C.9 CLEANUP AND FINISH GRADING
The Contractor shall restore all areas disturbed by construction to a condition at least equal to that existing prior to construction. Excess construction materials, equipment, tools, waste excavation, and rubbish shall be removed. Excavated areas shall be finish graded to provide drainage as required by the drawings and specifications, or in the absence of specific requirements, to provide drainage away from the facilities constructed and to provide drainage away from excavated areas and installed facilities. Where a lawn is disturbed, the Contractor shall place a generous amount of grass seed to the disturbed area following final grading.
C.10 MEASUREMENT AND PAYMENT
As line item quantities are estimates, contractor will be paid full compensation based upon the actual quantities utilized/completed and verified by the Engineer. The price paid for the completed item of work shall include full compensation for furnishing all labor, materials, tools, equipment, and performing all work required by the provisions of the contract to furnish and install the items of work, completed in place. In all cases, the finished product shall be a complete, operational system or component. The price for the completed item of work shall also include all applicable state and local sales or other taxes.
Technical Provisions
Section Number Title
02100 Mobilization and Demobilization
02110 Site Clearing
02200 Excavating, Trenching, and Backfilling
0228 Utility Road Crossing
02229 Rock Removal
02510 Asphaltic Concrete Paving
02667 Water Mains
02668 Water Service Lines
02675 Disinfection and Bacteriological Testing of Water Main System
02740 Septic Tank Drainfield System
03300 Cast-in-Place Concrete
SECTION 02100
MOBILIZATION AND DEMOBILIZATION
PART 1 – GENERAL
1.1 SECTION INCLUDES
A. This section includes mobilization and demobilization to and from the jobsite.
1.2 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Mobilization and Demobilization: Paid by the hour based upon the roundtrip time spent traveling by the Contractor to mobilize and demobilize to and from the jobsite(s) from his base of operations utilizing the most efficient and direct route as agreed upon by the Project Engineer. When two or more sites are to be served as part of a round trip, there will be only one accounting of time “from home base to the jobsite(s)” and from the “jobsite(s) to the base of operations”. As noted above, time spent in mobilizing directly from one jobsite to another will be accounted for under this line item. There will not be multiple payments for trips to and from the same site. For a single site this is limited to a maximum of 8 hours.
PART 2 – PRODUCTS
NONE
PART 3 – EXECUTION
3.1 PREPARATION
A. Make arrangements to contact all public works departments and Tribal Business Center prior to mobilizing on job site location and secure all necessary permits prior to performing work.
B. Notify Government 48 hours in advance prior to mobilization to job site location.
3.2 MOBILIZATION
A. Move materials, equipment, and laborers as necessary to job site location with minimal disturbance.
3.3 DE-MOBILIZATION
A. Remove all materials, equipment, laborers, solid waste and debris created by
Revised 4/29/2015 02100 – Mobilization & Demobilization p. 1 of 2 construction activities from job site location.
B. Maintain minimal disturbance to site upon departure.
END OF SECTION
Revised 4/29/2015 02100 – Mobilization & Demobilization p. 2 of 2
STANDARD SPECIFICATIONS
SECTION 02110
SITE CLEARING
A. This section includes protection of facilities, clearing site of incidental paving and curbs, surface debris, grass, trees, and other plant life in preparation for site or excavation work.
A. There is no separate payment for work under this section. Merge work required with pay items defined within the Measurement and Payment portion of other Sections of this contract.
1.3 RELATED SECTIONS
A. Section 02200 – Excavating, Trenching, and Backfilling
NONE
3.1 PROTECTION
A. Locate, identify, and protect existing facilities (remaining), from damage.
B. Identify and protect trees, plant growth, and features designated to remain as final landscaping.
C. Protect bench marks from damage or displacement.
3.2 CLEARING
A. Clear only those areas required for access to site and execution of Work.
Revised 08/29/01 02110 – Site Clearing p. 1 of 2
B. Remove paving, curbs, and other structures or debris per drawings.
3.3 REMOVAL
A. Remove paving, brush, trees, and other debris and dispose of off-site.
3.4 TOPSOIL EXCAVATION
A. Excavate topsoil from areas to be further excavated or re-graded.
B. Stockpile topsoil in designated area.
1. Protect from erosion.
2. Remove excess topsoil from site.
Revised 08/29/01 02110 – Site Clearing p. 2 of 2
SECTION 02200
EXCAVATING, TRENCHING AND BACKFILLING
A. This Section includes regulatory requirements, protection, imported pipe embedment, excavation, backfilling, compaction, quality control, and restoration.
A. Work required under Section 02200 shall be merged with pay item defined within the Measurement and Payment portion of other Sections of this contract. Imported Pipe Embedment, Imported Structural Fill and Cement Slurry Fill are exceptions.
B. Imported Pipe Embedment: Paid by the cubic yard, measured to the nearest 0.1 yd3. Includes delivery, protection, placement, compaction of imported pipe embedment. Quantity of embedment measured for payment shall not exceed the quantity derived from calculating compacted, in-place volume, as shown on plans, drawings or specifications.
C. Imported Structural Fill: Paid by the cubic yard, measured to the nearest 0.1 yd3.
Includes delivery, protection, placement, compaction of imported structural fill.
Quantity of fill measured for payment shall not exceed the quantity derived from calculating compacted, in-place volume, as shown on plans, drawings or specifications.
D. Cement Slurry Fill: Paid by the cubic yard, measured to the nearest 0.1 yd3.
Includes delivery, protection and placement of concrete slurry fill. Quantity of fill measured for payment shall not exceed the quantity derived from calculating, in-place volume, as shown on plans, drawings or specifications.
E. Potholing: Paid by the hour, measured to the nearest half hour. Only to be done as requested by Engineer for location of existing utilities or for soil testing.
Includes excavating, backfilling, compacting, site clearing and restoring site to its original condition. No payment shall be made for mobilization and demobilization to and from site.
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 1 of 9
A. Section 02110 – Site Clearing
B. Section 02229 – Rock Removal
C. Section 02667 – Water Mains
D. Section 02668 – Water Service Lines
E. Section 03300 – Cast-in-Place Concrete
1.4 REFERENCES
A. ASTM D698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, Using 5.5 lb (2.5 Kg) Rammer and 12 inch (300 mm) Drop.
B. ASTM D1556 - Test Method for Density of Soil in Place by the Sand-Cone
Method.
C. ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and
Soil-Aggregate Mixtures Using 10 lb (4.5 Kg) Rammer and 18 inch (450 mm) Drop.
D. ASTM D2922 - Test Methods for Density of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth).
E. ASTM D3017 - Test Methods for Moisture Content of Soil and Soil-Aggregate
Mixtures.
F. ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates.
G. ASTM D2321 - Recommended Practice for Underground Installation of Flexible
Thermoplastic Sewer Pipe.
H. State of California, Department of Transportation, Latest Edition of the Standard
Specifications.
1.5 REGULATORY REQUIREMENTS
A. Project Engineer to obtain an Encroachment/Trenching Permit from the local roads authority prior to construction. Contractor to comply with the requirements of the encroachment/trenching permit.
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 2 of 9
B. In accordance with the requirements of Section 6705 of the Labor Code of the State of California, submit a detailed plan to the Engineer before excavation, showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches 5 feet or more in depth.
C. Submit the plan to the Project Engineer prior to start of excavation.
1.6 DEFINITIONS
A. Utility: Any buried pipe, duct, conduit, or cable.
B. Structure: Foundation, manhole, septic tank, cleanout, catch basin, or culvert.
C. Solid Rock: Large continuous masses of igneous, metamorphic, or sedimentary rock, which in the opinion of the Project Engineer cannot be excavated without drilling and blasting. Soil that is capable of being excavated with rippers is not considered solid rock.
D. Loose Rock: Boulders and other detached stones, with a minimum volume of 1 cubic yard.
1.7 FIELD MEASUREMENTS
A. Verify that survey benchmarks, control points, and intended elevations are as shown on drawings.
1.8 PROTECTION
A. Barricade open excavations.
B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
C. Provide safe conditions for workers and passers-by.
2.1 IMPORTED PIPE EMBEDMENT
A. Use crushed stone or gravel that is free of shale, clay, friable material, and debris.
Grade in accordance with ASTM C136, within the following limits:
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 3 of 9
Sieve Size Percent Passing 1 in 100 3/4 in 90 to 100 3/8 in 20 to 55
no. 4 0 to 10
no. 8 0 to 5
2.2 IMPORTED STRUCTURAL FILL
A. Use imported soil (if required) that has angular fragments and a low expansion index (less than 30 per ASTM D 4829). Use imported fill that complies with the requirements of Caltrans Class 3 Aggregate Subbase:
3 in 100
2.5 in 87 to 100
no. 4 45 to 100
no. 200 0 to 34
2.3 DRAINAGE ROCK
2 in 100 ¾ in 35 to 70
no. 4 0 to 5
2.4 CEMENT SLURRY FILL
A. Slurry cement backfill shall consist of a fluid, workable mixture of aggregate, cement and water that will flow without segregation of the aggregate while being placed.
B. Water used for mixture shall be free from oil, salts and other impurities which would have an adverse effect on the quality of the backfill material.
C. Not less than 188 lbs of cement shall be used for each cubic yard of material produced.
D. The aggregate shall can be commercial quality concrete sand or material meeting the following gradation:
1 ½” 100 1” 80 to 100 ¾” 60 to 100
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 4 of 9
3/8” 50 to 100 No. 4 40 to 80 No. 100 10 to 40
3.1 PREPARATION
A. Notify Underground Service Alert (800) 227-2600 in Northern and Central California and (800) 422-4133 in Southern California prior to excavation.
Comply with their notice requirements.
B. Identify required lines, levels, contours, and datum locations.
C. Protect plant life, lawns, rock outcropping, and other features remaining as final landscaping.
D. Protect benchmarks, existing structures, fences, and paving from excavating equipment and vehicular traffic.
E. Maintain and protect utilities and structures which are to remain.
3.2 EXCAVATION
A. Use open cut method on all excavation unless otherwise shown on the drawings, required by permit, or approved in writing by the Project Engineer.
B. Stockpile excavated material in designated area on site, and remove excess material from site.
C. Grade top perimeter of excavation to prevent surface water from entering.
3.3 CLASSIFICATION OF EXCAVATION
A. All excavation with equipment commonly used in the industry is classified as common excavation (except for drilling and blasting).
B. All material drilled and blasted for removal is classified as rock excavation.
Inform the Project Engineer prior to rock excavation to determine pay measurement.
3.4 TRENCH EXCAVATION
A. Cut trenches sufficiently wide to enable installation and inspection. Remove
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 5 of 9 water or materials that interfere with work.
B. Maintain trench sides as vertical as possible--between 12 inches and 24 inches wider than the outside diameter of the pipe barrel--below pipe level.
C. Excavate trench width above the pipe as wide as necessary for shoring, sheeting, and installation.
D. Center trench excavation on pipe alignment for a minimum clearance of 6 inches on each side of the pipe.
E. Hand trim for bell and spigot pipe joints. Remove loose matter.
F. Restore over-excavated areas. If the trench bottom is over-excavated below the intended grade, fill over-excavation with imported pipe embedment and compact to density equivalent to the in situ material.
G. Remove lumped subsoil, boulders, and rock up to ½ yd3 (measured by volume).
H. Excavate for additional trench depth when soil prevents adequate pipe support.
Refill addition with imported pipe embedment. Remove large rock, boulders, and large stones to provide 3 inches of soil cushion on all sides of the pipe and pipe accessories.
I. Length of trench that may be left open at any one time is 100 yards. Do not leave trench open over night.
J. Stockpile excavated material in designated area on site, and remove excess material from site.
3.5 STRUCTURE EXCAVATION
A. Excavate for structures down to the levels indicated on the drawings. Excavate as large as necessary to accommodate the work forms. Comply with all safety regulations.
B. Excavate a sufficient distance from walls and footings to provide forming except where concrete for walls or footings is directly against excavated surfaces.
C. Do not excavate below depths indicated in the drawings. Restore over-excavated areas to proper elevation by filling with imported structural fill. Do not interfere with 45 degree bearing splay of foundations.
D. Hand trim the bottom of the excavation to prevent disturbing the soil below the required depth.
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 6 of 9
3.6 BACKFILLING
A. Use care to prevent disturbance or damage to utilities or structures in trench.
B. Maintain optimum moisture content to attain required compaction density.
C. Remove surplus fill materials from site.
D. Leave fill material stockpile areas free of excess fill materials.
3.7 TRENCH BACKFILLING
A. Use excavated soil as embedment unless Project Engineer determines it unsuitable. Unsuitable material is defined as incapable of being compacted to specified density with optimum moisture content, solid or loose rock, lump material larger than 1 inch, organic matter, or debris.
B. Use excavated soil as final backfill unless Project Engineer determines it unsuitable. Unsuitable final backfill material is solid or loose rock larger than 6 inches or lumps larger than 3 inches. Do not use organic matter or debris.
C. Backfill pipe embedment material in uniform layers on all sides of the pipe in lifts not to exceed 6 inches.
D. Use the following methods when placing final backfill material unless otherwise required by permits or authority.
Compact Not to Exceed (In loose measure) Roadways 6 inches thick Rights-of-way and outside roadway 12 inches thick Unimproved surfaces 24 inches thick
3.8 STRUCTURE BACKFILLING
A. Place structure fill material in uniform layers on all sides of the structure 6 inches thick.
B. Do not fill structure material until the structure footing or other portions of the structure have been inspected
C. Use excavated soil as final backfill material unless Project Engineer determines it unsuitable. Unsuitable final backfill material is solid or loose rock larger than 6 inches or lumps larger than 3 inches. Do not use organic matter or debris.
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 7 of 9
3.9 CEMENT SLURRY BACKFILLING
A. Maintain a minimum of 6 inches clear distance between the outside of pipe and the side of the excavation for pipes 42” in diameter and smaller.
B. Compacted earth plugs or other suitable system shall be placed as the ends of the trench to receive slurry backfill to completely contain the slurry in the trench.
C. Place cement within 1 hour after mixing.
D. Place in a uniform manner that will prevent voids in, or segregation of, the backfill, and will not float or shift the pipe.
E. Backfilling over or placing any material over the slurry cement backfill shall not commence until 4 hours after the slurry has been placed, except that when concrete sand is used for the aggregate and the in-place material is free draining, back filling may commence as soon as the surface water is gone.
F. Cement Slurry Backfill shall not be used where it will be in contact with aluminum and aluminum coated materials.
3.10 COMPACTION
A. Compact final backfill to the percentage of maximum density determined by ASTM D1557 unless otherwise specified by permit or authority.
Percent of Maximum Density Initial Final Location Bedding Haunching Backfill Backfill
Roadways, Improved Surfaces 95 95 95 95
Roadway Rights-of-Way Outside of Roadway 90 90 90 90 Prism
Unimproved Surfaces, Fields, Etc. 90 90 80 80
Backfill Around Structures 95 95 95 95
3.11 FIELD QUALITY CONTROL
A. The government, at its discretion, may acquire the services of a certified soils
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 8 of 9 testing laboratory to perform baseline Modified Proctor density tests in accordance with ASTM D1557 or latest revision:
1. Tests may be performed at locations approved by Project Engineer.
2. Test results from tests prior to construction will be made available to the contractor.
3. Testing is at the government's expense.
B. Compaction testing will be determined at the Project Engineer's discretion.
C. If work does not meet specified requirements, remove, replace, and retest. All re-testing is at the contractor’s expense.
3.12 PROTECTION OF FINISHED WORK
A. If vehicular traffic has altered finished work, reshape and re-compact fills.
3.13 SIDEWALK, CURB AND GUTTER RESTORATION:
A. Restore the sidewalks, curbs, and gutters to their original condition. Comply with the standards and construction requirements of the local authority.
B. Machine compact backfill under the sidewalk as follows:
1. Cut the existing curb or sidewalk to a neat line.
2. Match the depth of base course material with that present under adjacent curbs or sidewalks.
3. Match to the existing concrete walk in width, thickness, slope, and finish, but not less than 4 inches in thickness.
4. Use wire mesh reinforcement; 6 inch by 6 inch.
Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 9 of 9
SECTION 02228
UTILITY ROAD CROSSING
A. This section includes submittals, materials, cutting, trenching, boring, and patching.
A. Paved Utility Road Crossing (open cut): Paid by the linear foot at the unit price as stated in the bid schedule and includes: traffic control, saw cutting and removal of existing pavement, excavation, backfill (native material), replacement of subgrade and asphalt or concrete in accordance with all applicable state and local regulations, and all appurtenances. Note: Water or sewer pipeline installed at road crossings shall be measured and paid on a per lineal foot basis in accordance with their respective bid items.
1.3 REFERENCES
A. ASTM D3515 - Hot-mixed, hot laid bituminous paving mixtures.
B. ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates.
1.4 RELATED SECTIONS
A. Section 02200 - Excavating, Trenching, and Backfilling
B. Section 02510 – Asphaltic Concrete Paving
1.5 SUBMITTALS
A. Submit a written request to Project Engineer and road owner prior to cutting or boring for utility road crossing, including:
1. Location and description of affected work.
2. Necessity for cutting or alteration.
Revised 08/05/2015 02228 – Utility Road Crossing p. 1 of 4
3. Description of proposed work and products to be used.
4. Alternatives to cutting and patching.
5. Date and time work will be executed.
6. Source of asphaltic mixture.
B. Obtain an Encroachment/Trenching Permit from the local roads authority prior to construction. Comply with the requirements of the Permit.
2.1 MATERIALS
A. Tack Coat: Homogeneous, medium curing, liquid asphalt, in accordance with standards of CALTRANS or local authorities.
B. Asphalt: Hot mixed, hot laid bituminous mixture.
C. Manufacturer: By approval of Project Engineer.
D. Asphalt Nominal Width: 12” greater than the trench width Dimensions: Depth Range: 2” to 4” Length: As specified in the site drawing
E. Casing: ASTM A53, schedule 40 black pipe, or as required by local permitting agency.
F. Piping: As specified in the site drawing.
3.1 EXAMINATION
A. Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching.
B. After uncovering existing work, assess conditions affecting performance of work.
C. Beginning of cutting or patching means acceptance of existing conditions.
3.2 PREPARATION
Revised 08/05/2015 02228 – Utility Road Crossing p. 2 of 4
A. Provide temporary supports to ensure structural integrity of the Work. Provide devices and methods to protect other portions of Project from damage.
B. Provide protection from elements for areas which may be exposed.
C. Maintain excavations free of water.
D. Provide traffic control in compliance with local road ordinances.
3.3 CUTTING
A. Cut rigid materials using cutting wheel or pneumatic pavement cutter.
B. Cut clean, vertical, and straight. Cut above any pavement fractures.
3.4 TRENCHING AND PIPE INSTALLATION
A. Perform trenching in accordance with Section 02200 (Excavating, Trenching, and Backfilling).
B. Install the water main or service line pipe inside the steel casing. Protect the pipe within the casing by installing redwood skids. Equally space at least four skids around the perimeter of the pipe at distances specified in the drawing.
3.5 PATCHING
A. Apply tack coat to contact surfaces including curbs, gutters, and concrete pads in accordance with manufacturer's instructions.
B. Apply hot mix asphalt within 24 hours after tack coat application.
C. Place to 3” compacted thickness or to thickness required by local permitting agency or if otherwise specified. Compact pavement by rolling to specified density. Hand compact in areas inaccessible to rolling equipment.
D. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks. Create smooth transition between existing and newly finished pavement.
E. Perform patching prior to deterioration of clean, vertical cutting edge.
3.6 FIELD QUALITY CONTROL
A. Do not patch over wet subgrade.
Revised 08/05/2015 02228 – Utility Road Crossing p. 3 of 4
B. Do not patch when ambient temperature is below 4º C.
Revised 08/05/2015 02228 – Utility Road Crossing p. 4 of 4
SECTION 02229
ROCK REMOVAL
A. This section includes removal of identified and discovered rock during excavation, expansive tools, and explosives to assist in rock removal.
A. Solid Rock Removal: Paid by the cubic yard after removal, measured to the nearest 0.1 yd3. Includes preparation of rock for removal, mechanical disintegration of rock, removal from position, loading and removing from site. For payment purposes, solid rock excavation shall be measured by the cubic yard from the top of the rock to a point to allow the minimum bedding and side clearance for the facilities as specified in the appropriate specifications and details. Quantity of rock removal approved will be based on a width 18 inches wider than the outside diameter of the pipe or conduit and a height from rock surface to 6 inches below bottom exterior surface of the pipe or conduit. For over excavation, payment will not be made for over excavated work or for replacement materials. Quantity of rock to be removed must be estimated by Contractor and approved by Project Engineer prior to rock removal.
B. Loose Rock Removal: Paid by the cubic yard after removal, measured to the nearest 0.1 cubic yard. Includes preparation of rock for removal, removal from position, loading and removing from site. For payment purposes, loose rock excavation shall be measured in cubic yards and shall include the total volume of only those rocks or boulders that are individually over one-half cubic yard in volume. Loose rock shall be removed from the excavation in such a way that a clear width of at least six inches exists between the rock and the pipe or appurtenance. Quantity of rock to be removed must be estimated by Contractor and approved by Project Engineer prior to rock removal.
A. Section 02110 – Site Clearing.
B. Section 02200 – Excavating, Trenching and Backfilling.
1.4 DEFINITIONS
Revised 08/29/01 02229 – Rock Removal p. 1 of 2
A. Solid Rock: Rock Solid igneous or metamorphic rock which, in the opinion of the
Project Engineer, cannot be removed practically without the use of specialized pre-splitting methods such as: drilling, wedging, prying, jacking, hydraulic hammering, etc. Soft, disintegrated rock that can be removed with a picking or scarifying action shall not be classified as rock excavation.
B. Loose Rock: Boulders and other detached stones, each with a minimum volume of
½ cubic yard. Excavated boulders or rock fragments with a volume of less than ½ cubic yard shall not be classified as Loose Rock for payment purposes.
A. Verify site conditions and note subsurface irregularities affecting work of this section.
B. Identify required lines, levels, contours and datum.
3.3 ROCK REMOVAL BY A MECHANICAL METHOD
A. When rock is encountered, strip free earth.
B. Excavate and remove rock by the mechanical method.
1. Hydraulic hammering or jacking.
2. Drill holes and use expansive tools, wedges and mechanical disintegration compound to fracture rock.
C. Excavate to 6 inches below invert elevation of pipe and 18 inches wider than the pipe diameter in utility trenches.
D. Remove all rock fragments, boulders, and debris from site and dispose of in an approved waste area.
E. Correct unauthorized rock removal in accordance with compacting and backfilling requirement of Section 02200.
Revised 08/29/01 02229 – Rock Removal p. 2 of 2
SECTION 02510
ASPHALTIC CONCRETE PAVING
A. Asphaltic concrete paving.
B. Aggregate base course.
A. There is no separate payment for work under this section. Merge work required with pay items defined within the Measurement and Payment portion of other Sections of this contract.
A. Section 02200 – Excavating, Trenching, and Backfilling
B. Section 02228 – Utility Road Crossing
A. State of California, Department of Transportation, Standard Specifications, latest edition.
1.5 QUALITY ASSURANCE
A. Perform Work in accordance with State of California, Department of Transportation, Standard Specifications, latest edition.
B. Obtain materials from same source throughout.
1.6 REGULATORY REQUIREMENTS
A. Project Engineer will obtain a permit, if required, from the appropriate authority prior to construction. Contractor to comply with the requirements of the permit.
08/29/01 02510 – Asphaltic Concrete Paving p. 1 of 3
1.7 ENVIRONMENTAL REQUIREMENTS
A. Do not place asphalt when ambient air or base surface temperature is less than 40º F, or surface is wet or frozen.
2.1 MATERIALS
A. Asphalt Concrete Pavement: In accordance with State of California, Department of Transportation, Standard Specifications, most recent edition.
B. Aggregate for Base Course: In accordance with State of California, Department of
C. Primer: In accordance with State of California, Department of Transportation, Standard Specifications, most recent edition.
D. Tack Coat: In accordance with State of California, Department of Transportation, A. Verify base conditions under provisions of Section 02200.
B. Verify the compacted subgrade is ready to support paving and imposed loads.
3.2 PLACING AGGREGATE BASE
A. Install Work in accordance with State of California, Department of Transportation, B. Aggregate base will not be required where the trench has been backfilled with cement slurry and the asphaltic concrete will be placed directly on the slurry mixture.
3.3 PREPARATION - PRIMER
A. Apply primer in accordance with State of California, Department of Transportation, 08/29/01 02510 – Asphaltic Concrete Paving p. 2 of 3
3.4 PREPARATION - TACK COAT
A. Apply tack coat in accordance with State of California, Department of
3.5 PLACING ASPHALT PAVEMENT
A. Install Work in accordance with State of California, Department of Transportation, B. Compact pavement by rolling to specified density. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment.
C. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks.
3.6 TOLERANCES
A. Flatness: Maximum variation of ¼ inch measured with a 10-foot straight edge.
3.7 PROTECTION
A. Immediately after placement, protect pavement from mechanical injury until surface temperature is less than 140º F.
08/29/01 02510 – Asphaltic Concrete Paving p. 3 of 3
SECTION 02667
WATER MAINS
A. This section includes water pipe, gate valves, hydrants, preparation, bedding, installation, and disinfection.
A. PVC Water Main: Paid by the linear foot, measured to the nearest foot. Includes trench excavation, placement of bedding material (quantity of imported bedding material required, if any, will be paid separately under its own line item), hand trimming, pipe, fittings, thrust blocks, water main warning tape, trace wire, marker posts, hydrostatic testing, disinfection, backfilling, as-builts, site cleanup, bacteriological sampling and testing, and all appurtenances not otherwise specified in the bid schedule. Payment shall be the same for C900, SDR 26, and SDR 21 PVC pipe, based on diameter of pipe.
B. Fire Hydrant Assembly: Paid by the unit, measured to the whole unit. Includes excavation, angle fire hydrant valve, gate valve and box, hydrant wrench, gate valve key, thrust blocks, connection to water main, gravel, concrete, backfilling, protection posts, as-builts, site cleanup, and other appurtenances necessary to make a workable installation. Wet barrel and dry barrel fire hydrants will be paid at the same rate.
C. Flush Hydrant Assembly: Paid by the unit, measured to the whole unit. Includes excavation, angle flush hydrant valve, galvanized pipe, gate valve and box, hydrant wrench, gate valve key, thrust blocks, connection to water main, gravel, concrete, backfilling, protection posts, as-builts, site cleanup, and other appurtenances necessary to make a workable installation.
D. Gate Valve and…