About this file
Attachment 2-revised Section B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4-_revised_attachment_J-8.pdf | ||
| Attachment_1_list_of_attendees.pdf | ||
| Attachment_3.pdf | ||
| Amendment_1.pdf | ||
| Attachment_J-4_FDA_Form_3391.pdf | ||
| 15-223-SOL-00036.pdf | ||
| Attachment_J-8.pdf | ||
| Attachment_J-7_PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE.doc | DOC document | |
| Attachment_J-2.pdf | ||
| Attachment_J-5_FDA_Form_3398.pdf | ||
| Attachment_J-1.pdf | ||
| Attachment_J-3_Wage_Decision.pdf | ||
| Attachment_J-6_SAMPLE_CLIENT__LETTER.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I- THE SCHEDULE
SECTION B- SUPPLIES OR SERVICES AND PRICES/COSTS
B-1 Purpose
Construction of Production Well at the U.S. Food and Drug Administration (FDA) Jefferson Laboratories Complex in Jefferson, AR as detailed herein.
B-2 Schedule of Items
Contract Line Item No.
Description Quantity Unit Price
Base: Drill Test Hole/Test Well, which includes mobilization, one test hole to a base depth of 1000’ (feet), including laboratory testing of formation samples, Geophysical logging service (including electrical and natural gamma logging) and Hydrological review. Work shall be accomplished in accordance with attachment J-
1. Work shall be completed within 60 calendar days after the notice to proceed. (See SF 1442, Block 11 and Section F FAR Clause 52.211-10).
1 Job $
UNIT PRICED ITEMS: In the event changes are required under the contract (i.e., FAR Clauses 52.2.236-6, 52.243-4 Changes (to include the supplement at Section H, Paragraph H-4), etc.) the following unit priced items, which shall be inclusive of all direct and indirect costs including fee/profit, shall be used to adjust the contract amount upwards or downwards as the case may be.
For evaluation purposes quantities are established at “1” however, actual quantities will be negotiated and agreed upon prior to affecting any modification to the contract at the stated unit prices.
1a
UNIT PRICED ITEM: The final adjustment of the test hole/test well depth is to be based on the maximum depth of the electrical and natural gamma log. Add or deduct per linear foot for more or less than 1000' of test hole. Work shall be completed within 30 calendar days of option exercise. .
Linear foot
Option for Increased Quantity—Separately Priced Line Item. See FAR Clause 52.217-7 in Section I-2
15-223-SOL-00036 Amendment 1 1 of 6
Contract Line Item No.
Description Quantity Unit Price
Option Item: Monitoring Well: The Arkansas Department of Health (ADH) may require the test hole/test well to be turned into a monitoring well after reviewing, well drillers log, pumping capacity and chemical test results. Please refer to attached Test Well Specification Section 02524, Paragraph 3.6 in attachment J-1. Work shall be completed within 90 calendar days after the option is exercised.
1 Job $
Option Item: Abandonment of Test Hole/Test Well.
The Arkansas Department of Health may require the test hole/test well to be abandoned after reviewing, well drillers log, pumping capacity and chemical test results. Please refer to attached Test Well Specification Section 02524, Paragraph 3.6 in attachment J-1. Work shall be completed within 90 calendar days after the option is exercised.
1 Job $
Option Item: In lieu of drilling production well in location shown on drawings; provide production well at the same location as the test hole / test well. See Line Item #7 for calendar day duration” Work shall be completed within 210 calendar days after the option is exercised.
1 Job $
Option Item: Sandblast and apply approximately 6-8 mils of dry film thickness to the inside diameter (ID) & outside diameter (OD) of column pipe, OD of oil tubing with stainless steel nipples to bowl. Work shall be completed within 90 calendar days after the option is exercised.
1 Job $
6 Option Item: Furnish and install one oil 1 Job $
15-223-SOL-00036 Amendment 1 2 of 6
No.
Description Quantity Unit Price lubricated vertical turbine pump assembly.
Pump designed for 800 GPM at 50 lbs. per square inch discharge pressure with 320' of 8" oil lube column assembly, complete with 3 phase, 60 hertz, 480 volt premium efficiency motor all bronze bowl assembly. Work shall be accomplished in accordance with attachment J-
2. Work shall be completed within 180 calendar days of option exercise.
Option Item: The construction of an 800 GPM production well with 12" outer casing, 8" inner casing, and screen. Conduct testing of the pump and install water meter. Provide concrete slab at well (5’x5’x5’ trapezoidal 5’ at base 4’ at top start 1’ below finish grade) and perimeter fencing (chain link #9 gauge galvanized steel see specification). Consisting of 950' of outer casing, 100’ of inner casing and 50’ of screen.
Division 2 Scope of Work: Provide thrust blocks for all piping as required per standard details. Reference Table of Contents (TOC) for other items of work; contractor is requested to provide the normal scope of work as required by the Arkansas Department of Health. Work shall be accomplished in accordance with attachment J-2. Work shall be completed within 210 calendar days of option exercise.
1 Job $
7a UNIT PRICED ITEM: For adjustment of final price on length of 12" outer casing, add for each foot more or deduct for each foot less than 950'.
Lineal Foot
7b UNIT PRICED ITEM: For adjustment of final price on length of screen, add for each foot more or deduct for each foot less than 50 feet.
Lineal Foot
15-223-SOL-00036 Amendment 1 3 of 6
No.
Description Quantity Unit Price
7c
UNIT PRICED ITEM: For adjustment of final price of length of stainless steel inner casing and/or blank, add for each foot more or deduct for each foot less than 100 feet.
Lineal Foot
Option Item: Electrical Scope of Work Division 16;
The Contractor shall provide all wiring, conduit, starter, transformer and variable speed drive in accordance with the attached specifications and drawings. Provide electrical service from switch VS-OB-2 to proposed well site, control wiring for start/stop control with an HOA (hand , off, auto switch), and provide 2” conduit with turn-up with cap from north side of VS-OB-2 to Well #1 start/stop switch with pull string. All electrical enclosures shall be National Electrical Manufacturers Association (NEMA) 4 enclosures. Provide all earthwork including excavation, bedding, backfill and compaction.
Provide trench detail per drawing E5.2 section 3 or 4 per surface requirements. Provide miscellaneous metal support (unistrut) in concrete for all devices with concrete slab 4’ clear in front of devices. Provide concrete slab for transformer. The work shall be completed in accordance with all state regulations (Arkansas Department of Health) and forthcoming construction documents. The contractor shall be licensed in the State of Arkansas to drill potable wells. Final cost to be based on issued construction documents from the Government.
Provide product submittals, permits, closeout documents including As-Builts as required for a full and complete project. Work shall be accomplished in accordance with attachment J-
1 Job $
15-223-SOL-00036 Amendment 1 4 of 6
No.
Description Quantity Unit Price
2. Work shall be completed within 210 calendar days of option exercise.
Option Item: Plumbing Scope of Work Division 15:
The Contract shall provide all piping, meter, fittings and valves. Provide one 10” shut-off valve at the connection of existing well #14 to new service pipe connection tee. Provide check valve at well with shut-off valves for flushing port and sample port. Piping shall be 10” C900 PolyVinyl Chloride (PVC). Also provide 2” conduit with pull string from Well #1 to Well #14 with turn-up and capped. Provide all earthwork including excavation, bedding, backfill and compaction. Provide steel pipe encasement for C900 pvc pipe under road crossing; extend end of pipe (3’) feet in to bank so that no C900 is unprotected. Provide a minimum cover of (4’) feet measured vertically from the flow line of parallel ditches. Provide spiders, end caps with seals for steel pipe case to C900. Reference CAW Encasement Specification.pdf and drawing.pdf Attachment 3.
Provide a (10”) inch shut-off valve with pedestal at connection of C900 to existing Well #14 piping. All bedding shall be a minimum of (6”) inch. The work shall be completed in accordance with all state regulations (Arkansas Department of Health) and forthcoming construction documents. The contractor shall be licensed in the State of Arkansas for potable well drilling. Final cost to be based on issued construction documents from the owners consult. Provide product submittals, permits, closeout documents including As-Builts as
1 Job $
15-223-SOL-00036 Amendment 1 5 of 6
No.
Description Quantity Unit Price required for a full and complete project. Work shall be accomplished in accordance with attachment J-2. Work shall be completed within 210 calendar days of option exercise.
The Contractor shall provide the connection of the new C900 to the existing piping at Well #14 by means of a “Wet Tap”. The base bid is the supply of water will be diverted so that Well # 14 can be shut off; no water flow. Work shall be completed within 180 calendar days of option exercise.
Total Price CLINs 1-10
15-223-SOL-00036 Amendment 1 6 of 6
| PART I- THE SCHEDULE |
| SECTION B- SUPPLIES OR SERVICES AND PRICES/COSTS |
File details come from the government source that posted it. Updated .