This is a comprehensive structural design and construction document set for the Chatham County Fleet Services Facility, located in Garden City, Georgia, prepared by Cogdell & Mendrala Architects, PC for the Chatham County Board of Commissioners. The project involves constructing a new fleet maintenance and service facility with maintenance bays, office spaces, and associated infrastructure. The facility will include a primary structure with a pre-engineered metal building system, concrete foundations, masonry walls, and a second-floor mezzanine. The construction documents detail structural specifications, foundation plans, framing configurations, wall bracing, and technical specifications for various building components.
The project includes base bid and additive alternate bid options, with the primary facility encompassing approximately 14,873 square feet of storage/industrial space and 4,231 square feet of business occupancy areas. The structural design specifies a Type IIB sprinklered construction with allowable floor areas of 69,000 square feet for storage/industrial spaces and 52,500 square feet for business areas. The facility is designed to accommodate automotive maintenance operations, with specific considerations for load-bearing capacities, wind and seismic design criteria, and specialized equipment support. The documents provide detailed specifications for concrete slabs, steel framing, masonry walls, and mechanical system integrations, indicating a comprehensive approach to facility design that considers structural integrity, functional requirements, and future operational needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications 25_0116_6.pdf | ||
| Invitation to Bid 25_0116_6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SET NO. SHEET:
COGDELL & MENDRALA ARCHITECTS, PC
CHATHAM COUNTY
DEPARTMENT OF ENGINEERING
ARCHITECTS:
CHATHAM COUNTY FLEET SERVICES FACILITY
SAVANNAH, GEORGIA
CIVIL ENGINEERS:
ARCH. PROJECT NO. 1509
FOR
CHATHAM COUNTY BOARD OF COMMISSIONERS
OWNER PROJECT No. 325-60630
SAUSSY ENGINEERING
DULOHERY WEEKS, INC.
STRUCTURAL ENGINEER:
M.E.P.F. ENGINEER:
/2
4/
:5 4:
A
M C
:\U se rs \c sm ith
\D oc um en ts \1
9_
C C
-F
LE
ET
A
U G
R D
_R T1
6_
AR
C H
_C
EN
TR
AL
_c sm ith .rv t
T1.0
CONSTRUCTION DOCUMENTS
ISSUED FOR BID
SCHEDULE OF DRAWINGS:
LOCATION MAP:
SITE
VOLUME I
LIST OF DRAWINGS - STRUCTURAL
S0.1 STRUCTURAL NOTES
S1.1 FOUNDATION PLAN
S1.2 FOUNDATION SECTIONS
S1.3 FOUNDATION SECTIONS
S1.4 FOUNDATION PLAN ADDITIVE ALTERNATE #1
S1.5 FOUNDATION PLAN VEHICLE WASH AND TRASH ENCLOSURE
S2.0 WALL BRACING PLAN
S2.1 SECOND FLOOR FRAMING PLAN
S2.2 FRAMING SECTIONS
S3.0 COLUMN AND FOUNDATION SCHEDULE
S4.0 TYPICAL DETAILS
S4.1 TYPICAL DETAILS
LIST OF DRAWINGS - LIFE SAFETY
LS0.01 LIFE SAFETY INFORMATION
LS0.02 UL ASSEMBLIES
LS2.01 LIFE SAFETY - COMPOSITE FIRST FLOOR PLAN
LS2.02 LIFE SAFETY - COMPOSITE SECOND FLOOR PLAN
LIST OF DRAWINGS - ARCHITECTURAL
A0.01 GEN. PROJECT NOTES, GRAPHIC SYMBOLS, & ABBREVIATIONS
A0.02 CONSTRUCTION SUBSYSTEMS & PARTITION TYPES
A2.01 COMPOSITE FIRST FLOOR PLAN
A2.02 COMPOSITE SECOND FLOOR PLAN
A2.03 ROOF PLAN
A2.51 EXPANSION AND CONTROL JOINT PLAN, SIGNAGE PLANS
A3.01 EXTERIOR ELEVATIONS
A3.02 EXTERIOR ELEVATIONS
A3.11 BUILDING SECTIONS
A3.21 WALL SECTIONS
A3.22 WALL SECTIONS
A3.23 WALL SECTIONS
A3.24 WALL SECTIONS
A4.01 ENLARGED PARTIAL FLOOR PLANS
A4.02 ENLARGED PARTIAL FLOOR PLANS
A4.03 ENLARGED PARTIAL FLOOR PLANS
A4.04 ENLARGED PARTIAL FLOOR PLANS
A4.05 ENLARGED VEHICLE WASH AND DUMPSTER PLANS AND SECTIONS
A5.01 INTERIOR ELEVATIONS
A5.02 INTERIOR ELEVATIONS
A6.01 COMPOSITE FIRST FLOOR REFLECTED CEILING PLAN
A6.02 COMPOSITE SECOND FLOOR REFLECTED CEILING PLAN
A7.01 ENLARGED STAIR PLANS, STAIR SECTIONS, AND STAIR DETAILS
A8.01 DOOR SCHEDULE & DETAILS
A8.02 DOOR AND WINDOW DETAILS
A8.11 STOREFRONT ELEVATIONS & DETAILS, OVER- HEAD COILING DOOR DETAILS
A8.31 ROOF AND EXTERIOR DETAILS
A8.41 EXTERIOR DETAILS
A8.51 MISCELLANEOUS DETAILS
A9.01 FINISH SCHEDULE AND INTERIOR DETAILS
A9.11 MILLWORK SECTIONS
A9.12 FLOOR MATERIALS PATTERN PLAN
LIST OF DRAWINGS - CIVIL
C0.0 COVER SHEET
C1.0 GENERAL NOTES
C2.0 DEMOLITION PLAN
C3.0 SITE PLAN AND LAYOUT
C3.1 SITE PLAN AND LAYOUT BID ALTERNATE
C4.0 PAVING, GRADING, AND DRAINAGE PLAN
C4.1 PAVING, GRADING, AND DRAINAGE PLAN BID ALTERNATE
C5.0 UTILITY PLAN
C5.1 UTILITY PLAN BID ALTERNATE
C6.0 CONSTRUCTION DETAILS
C7.0 CONSTRUCTION DETAILS
C8.0 WATER AND SEWER DETAILS
EC1.0 EROSION CONTROL NOTES AND CHECKLIST
EC2.0 EROSION CONTROL NOTES AND CHECKLIST
EC3.0 EROSION & SEDIMENTATION CONTROL PLAN - INITIAL PHASE
EC4.0 EROSION & SEDIMENTATION CONTROL PLAN - INTERMEDIATE PHASE
EC5.0 EROSION & SEDIMENTATION CONTROL PLAN - FINAL PHASE
EC6.0 EROSION & SEDIMENTATION CONTROL DETAILS
LIST OF DRAWINGS - LANDSCAPING
L1.0 LANDSCAPE PLAN
L1.1 LANDSCAPE PLAN BID ALTERNATE
L2.0 LANDSCAPING DETAILS
LIST OF DRAWINGS - PLUMBING
P0.01 PLUMBING LEGEND AND SCHEDULES
P0.02 PLUMBING DETAILS
P1.01 FIRST FLOOR PLAN - DRAINAGE & VENT
P1.02 SECOND FLOOR PLAN - DRAINAGE & VENT
P2.01 FIRST FLOOR PLAN - HOT & COLD WATER
P2.02 SECOND FLOOR PLAN - HOT & COLD WATER
P3.01 RISER DIAGRAMS
P3.02 RISER DIAGRAMS
P4.01 FIRST FLOOR PLAN - PLUMBING ADD ALTERNATE NO. 1
P4.02 FIRST FLOOR PLAN - PLUMBING ADD ALTERNATE NO. 8
P4.03 ADD ALTERNATE SITE PLAN
LIST OF DRAWINGS - FIRE PROTECTION
F0.01 FIRE PROTECTION DETAILS
F1.01 FIRST FLOOR PLAN - FIRE PROTECTION
F1.02 SECOND FLOOR PLAN - FIRE PROTECTION
LIST OF DRAWINGS - MECHANICAL
M0.01 MECHANICAL LEGEND & SCHEDULES
M1.01 FIRST FLOOR PLAN - HVAC
M1.02 SECOND FLOOR PLAN - HVAC
M1.03 FIRST FLOOR PLAN - HVAC ADD. ALTERNATE
M2.01 MECHANICAL SECTIONS
M3.01 MECHANICAL DETAILS
M3.02 MECHANICAL DETAILS
LIST OF DRAWINGS - ELECTRICAL
E0.01 ELECTRICAL LEGEND
E0.02 ELECTRICAL SITE PLAN
E1.01 FIRST FLOOR PLAN - LIGHTING
E1.02 SECOND FLOOR PLAN - LIGHTING
E2.01 FIRST FLOOR PLAN - POWER
E2.02 SECOND FLOOR PLAN - POWER
E3.01 FIRST FLOOR PLAN - MECHANICAL POWER
E3.02 SECOND FLOOR PLAN - MECHANICAL POWER
E4.01 FIRST FLOOR - FIRE ALARM
E4.02 SECOND FLOOR PLAN - FIRE ALARM
E5.01 ELECTRICAL DETAILS
E5.02 LIGHTING, POWER & FIRE ALARM ADD ALTERNATE
E5.03 LIGHTING AND POWER VEHICLE WASH FLOORPLAN
E6.01 ELECTRICAL ONE-LINE DIAGRAM
E6.02 ELECTRICAL PANEL SCHEDULES
LIST OF DRAWINGS - TELECOMMUNICATIONS
T0.01 COMMUNICATION LEGEND AND DETAILS
T1.01 FIRST FLOOR PLAN - COMMUNICATIONS
T1.02 SECOND FLOOR PLAN - COMMUNICATIONS
T2.01 COMMUNICATION ADD ALTERNATE PLAN
OCTOBER, 2018
W/
DBL.
BOT
SIM.
T/O
U.N.
PEJ
GA.
E.W.
O.C.
CL.
F.D.
LLV
SLV
E.J.
O.H.
P.T.
P.E.
ADD #4x4'-0" IN CENTERLINE OF SLAB
FOOTING
REINFORCED CONCRETE MASONRY
CONCRETE
BOND BEAM
REINF. MASONRY PIERS
DROP SLAB TO RECEIVE FLOOR FINISH
THICKENED SLAB
CONTROL JOINT (SAWN JOINT)
WALL FLOOR JOINT
CONCRETE SLAB TURNDOWN
SLOPE (DIRECTION AND DROP)
VERTICAL STEP IN WALL FOOTING
TOP OF STEEL ELEVATION
TOP OF FOOTING ELEVATION (RELATIVE TO F.F.)
SYMBOLS
STRUCTURAL LEGEND
ABBREVIATIONS
S
2"
X
P2 P3
CJ
WFJ
T.O.S
(-1'-4")
R
WITH
DBL.
BOTTOM
SIMILAR
THROUGHOUT
UNLESS NOTED
PRE-MOULDED EXPANSION JOINT
GAUGE
EACH WAY
ON CENTER
CLEAR
FLOOR DRAIN
LONG LEG VERTICAL
SHORT LEG VERTICAL
EXPANSION JOINT
OPPOSITE HAND
PRESSURE TREATED
PRE-ENGINEERED
BASIS OF DESIGN: 2012 INTERNATIONAL BUILDING CODE (WITH GEORGIA AMMENDMENTS)
A. GRAVITY LOADS:
1. METAL BUILDING ROOF DEAD LOADS:
SEE PRE-ENGINEERED METAL BUILDING NOTES THIS SHEET
2. METAL BUILDING ROOF LIVE LOADS: 20 PSF
B. SNOW LOADS (REFERENCE: ASCE 7-10)
GROUND SNOW LOAD, Pg = 5 PSF (FIGURE 7-1) Ce = 0.90 (TERRAIN CATEGORY C) (TABLE 7-2) Ct = 1.0 (TABLE 7-3)
I = 1.0 (BUILDING RISK CAT. II) (TABLE 7-4)
C1. WIND LOADS (REFERENCE: ASCE 7-10)
BUILDING RISK CATEGORY = II (TABLE 1.5-1)
BASIC WIND SPEED (3 SECOND GUST), V = 136 MPH (FIGURE 26.5-1B)
IMPORTANCE FACTOR = 1.0 (TABLE 1.5-2)
EXPOSURE CATEGORY = C (SECTION 26.7.3)
INTERNAL PRESSURE COEFFICIENTS: +0.18,-0.18 (ENCLOSED) (TABLE 26.11-1)
C2. WIND LOADS (REFERENCE: IBC 2012)
Vult = 136 MPH (ULTIMATE DESIGN WIND SPEED) (SECTION 1609.3) Vasd = 105 MPH (NOMINAL DESIGN WINDSPEED) (SECTION 1609.3.1)
NOTE: ALL WIND LOADING PRESSURES SHOWN HEREIN ARE UNFACTORED BASED ON ASCE-7-10
STRUCTURE IS LOCATED OUTSIDE OF THE WIND-BORNE DEBRIS REGION PER ASCE 7-10
BASIC WIND SPEED (3 SECOND GUST) WHICH IS EQUIVALENT TO IBC 2012
ULTIMATE DESIGN WIND SPEED. ALL WIND LOADING PRESSURES SHALL BE USED IN THE
APPROPRIATE LOAD COMBINATION FROM ASCE-7 CHAPTER 2 AND IBC 2012 SECTION 1605.
SEE B/S4.1 FOR COMPONENT & CLADDING DESIGN WIND PRESSURES AND FOR ADDITIONAL
INFORMATION.
D. SEISMIC LOADS (REFERENCE: ASCE 7-10)
RISK CATEGORY = II (TABLE 1.5-1)
0.2 SEC SPECTRAL RESPONSE ACCELERATION: Ss = .295
1.0 SEC SPECTRAL RESPONSE ACCELERATION: S1 = .116
Sds = 0.308 Sd1 = 0.180
SOIL SITE CLASSIFICATION = D
BASIC SEISMIC-FORCE-RESISTING SYSTEM
LONGITUDINAL: METAL BUILDING PORTAL FRAMES
TRANSVERSE: METAL BUILDING MOMENT FRAMES
RESPONSE MODIFICATION FACTOR: R= 3.0 (STEEL)
SEISMIC DESIGN CATEGORY = C (SECTION 11.6)
SEISMIC IMPORTANCE FACTOR = 1.00 (TABLE 1.5-2)
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE (SECTION 12.8)
GENERAL:
1. DO NOT SCALE DRAWINGS. FOLLOW DIMENSIONS SHOWN ON PLAN OR OBTAIN
ADDITIONAL INFORMATION.
2. CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS AND ELEVATIONS
SHOWN HEREIN WITH ARCHITECTURAL PLANS, SECTIONS, AND DETAILS PRIOR TO
CONSTRUCTION OR MATERIAL PURCHASE. CONTRACTOR SHALL NOTIFY ARCHITECT IN
WRITING OF ANY DISCREPANCIES NOTED. REFER TO ARCHITECTURAL DRAWINGS FOR
ALL DIMENSIONS AND ELEVATIONS NOT SHOWN HEREIN.
3. WHERE DETAIL OR SECTION IS SHOWN FOR ONE CONDITION. IT SHALL APPLY TO
ALL LIKE OR SIMILAR LOCATIONS.
4. CONTRACTORS SHALL VISIT THE SITE PRIOR TO BID TO ASCERTAIN CONDITIONS
WHICH MAY ADVERSELY AFFECT THE WORK OR COST THEREOF AND SHALL NOTIFY THE
ARCHITECT IN WRITING PRIOR TO SUBMITTING BIDS.
5. REFERENCE TO STANDARD SPECIFICATIONS OF ANY TECHNICAL SOCIETY,
ORGANIZATION, OR ASSOCIATION OR TO CODES OF LOCAL OR STATE AUTHORITIES,
SHALL MEAN THE LATEST STANDARD, CODE, SPECIFICATION, OR TENTATIVE
SPECIFICATION ADOPTED AT THE DATE OF TAKING BIDS, UNLESS SPECIFICALLY
STATED OTHERWISE.
6. COORDINATE FLOOR SLAB LAYOUT WITH ARCHITECTURAL DRAWINGS FOR EXACT LIMITS
AND DEPRESSIONS FOR AREAS TO RECEIVE ARCHITECTURAL FLOOR FINISHES
COORDINATE FLOOR JOINTS AT DOORS WITH ARCHITECTURAL DOOR DETAILS.
LIMITS SHOWN ON STRUCTURAL DRAWINGS ARE SCHEMATIC.
7. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION AND DETAILS OF ALL EXTERIOR
WALKS, CANOPIES, RAMPS, RAMP WALLS, AND ENTRANCE SLABS NOT DETAILED
HEREIN.
8. NO CHANGE IN SIZE OR DIMENSION OF ANY STRUCTURAL MEMBER SHALL BE MADE
WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER OF RECORD. NO OPENING SHALL
BE MADE IN ANY STRUCTURAL MEMBER WITHOUT THE WRITTEN APPROVAL OF THE
ENGINEER OF RECORD UNLESS SPECIFICALLY DETAILED ON THE CONTRACT
DRAWINGS.
9. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH ARCHITECTURAL AND
MECHANICAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
SUCH REQUIREMENTS INTO THE SHOP DRAWINGS AND CONSTRUCTION ACTIVITIES.
10. THE USE OF REPRODUCTIONS OF CONTRACT DRAWINGS BY ANY CONTRACTOR,
SUBCONTRACTOR, ERECTOR, FABRICATOR, OR MATERIAL SUPPLIER, IN LIEU OF
PREPARATION OF SHOP DRAWINGS SIGNIFIES HIS ACCEPTANCE OF ALL INFORMATION
SHOWN HEREON AS CORRECT AND OBLIGATES HIMSELF TO ANY JOB EXPENSE, REAL OR
IMPLIED, ARISING DUE TO ANY ERRORS THAT MAY OCCUR HEREON.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL SAFETY PRECAUTIONS
AND REGULATIONS DURING THE WORK. THE ENGINEER WILL NOT ADVISE ON NOR ISSUE
DIRECTION AS TO SAFETY PRECAUTIONS AND PROGRAMS.
12. CONTRACTOR HAS THE SOLE RESPONSIBILITY FOR MEANS, METHODS, SAFETY,
TECHNIQUES, SEQUENCES, AND PROCEDURES OF ALL CONSTRUCTION SHOWN HEREIN.
CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTIBILITY, ANALYSIS, AND ERECTION
PROCEDURES, INCLUDING DESIGN AND ERECTION OF FALSE WORK, TEMPORARY
BRACING, ETC. CONTRACTOR HAS THE SOLE RESPONSIBILITY TO COMPLY WITH ALL
OSHA REGULATIONS.
13. THE STRUCTURE IS STABLE ONLY IN ITS COMPLETED FORM. TEMPORARY SUPPORTS
REQUIRED FOR STABILITY DURING ALL INTERMEDIATE STAGES OF CONSTRUCTION
SHALL BE DESIGNED, FURNISHED, AND INSTALLED BY THE CONTRACTOR.
14. COORDINATE WITH PLUMBING AND ARCHITECTURAL FOR ALL FLOOR DRAIN AND ROOF
DRAIN LOCATIONS.
FOUNDATIONS:
1. FOUNDATION DESIGN IS BASED ON A MAXIMUM ALLOWABLE SOIL NET BEARING
PRESSURE OF 2000 PSF BASED ON THE RECOMMENDATIONS INCLUDED IN
GEOTECHNICAL ENGINEERING INVESTIGATION BY TERRACON DATED 10/17/2014,
PROJECT NO. ES145143. THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR
SUBSURFACE CONDITIONS ENCOUNTERED IN THE FIELD DIFFERENT FROM THOSE
ASSUMED OR DESIGNED. DATA CONCERNING SUBSURFACE MATERIALS OR CONDITIONS
WHICH ARE BASED UPON SOUNDINGS, TEST PITS, TEST BORINGS, OR OTHER
MEANS, HAVE BEEN OBTAINED BY THE DESIGN PROFESSIONAL FOR ITS USE
IN DESIGNING THE PROJECT.
THE ACCURACY OR COMPLETENESS OF THE DATA IN NOT GUARANTEED; AND
THEREFORE, THE CONSTRUCTION PROFESSIONAL SHALL NOT RELY ON THIS
INFORMATION WITHOUT INDEPENDENT VERIFICATION. NEITHER THE TECHNICAL
COLLEGE SYSTEM OF GEORGIA, THE GEORGIA STATE FINANCING AND INVESTMENT
COMMISSION, NOR THE DESIGN PROFESSIONAL AND HIS CONSULTANTS WILL BE
RESPONSIBLE IN ANY WAY FOR ADDITIONAL COMPENSATION EXCEPT AS PROVIDED
IN THE GENERAL REQUIREMENTS SECTION - CHANGES DUE TO SUBSURFACE OR
OTHER UNFORESEEN CONDITIONS.
2. ALLOWABLE BEARING PRESSURE SHALL BE VERIFIED BY FIELD TESTING IN
ACCORDANCE WITH REQUIREMENTS OF THE PROJECT SPECIFICATIONS. IN THE
ABSENCE OF SPECIFICATION REQUIREMENTS, A DYNAMIC CONE PENETROMETER TEST
(ASTM STP-399) SHALL BE PROVIDED AT EACH COLUMN FOOTING EXCAVATION AND
MAXIMUM 50' O.C. IN WALL FOOTINGS AND THICKENED SLABS TO VERIFY
AVAILABILITY OF THE DESIGN PRESSURE INDICATED.
3. ALL FOOTINGS AND SLABS SHALL BEAR ON SUBGRADE COMPACTED TO A MINIMUM 98%
ASTM D-698 UNLESS MORE STRINGENT REQUIREMENTS ARE INDICATED IN PROJECT
SPECIFICATIONS. UNLESS REQUIRED OTHERWISE BY SPECIFICATIONS, PROVIDE ONE
COMPACTION TEST AT EACH COLUMN FOOTING EXCAVATION AND EVERY 50 FEET ON
CENTER IN WALL FOOTINGS.
4. NO FOOTINGS SHALL BEAR ON ROCK. UNDERCUT ROCK A MINIMUM OF 2 FEET BELOW
BOTTOM OF FOOTING AND REPLACE WITH STRUCTURAL FILL IN ACCORDANCE WITH
PROJECT SPECIFICATION REQUIREMENTS.
5. ALL WATER SOFTENED SOILS IN FOUNDATION EXCAVATIONS SHALL BE REMOVED PRIOR
TO POURING CONCRETE. FILL OVER-EXCAVATED LIMITS WITH COMPACTED STRUCTURAL
FILL OR ADDITIONAL CONCRETE.
6. ALL BOTTOM REINFORCING IN FOOTINGS AND THICKENED SLABS SHALL BE SUPPORTED
WITH WHOLE CONCRETE BRICKS OR PREFABRICATED ALL PLASTIC CHAIR SUPPORT AT
MAXIMUM 48" O.C. BAR SUPPORTS SHALL BE POSITIONED TO MAINTAIN NO LESS
THAN 3" CLEAR TO BOTTOM OF LOWEST REINFORCING BAR.
7. ALL FOOTING, PIER AND OTHER FOUNDATION TYPE REINFORCING SHALL BE TIED IN
PLACE PRIOR TO POURING CONCRETE.
8. WHERE UNDERGROUND PLUMBING AND/OR UTILITY PIPES NEED TO BE SET AT AN
ELEVATION SUCH THAT THE PIPES WILL OCCUR IN A ZONE BELOW TOP OF WALL
FOOTINGS TO A DEPTH OF 24 INCHES BELOW THE BOTTOM OF WALL FOOTINGS (BASED
ON FOOTING ELEVATIONS SHOWN ON FOUNDATION PLANS), PROVIDE A VERTICAL STEP
(OR STEPS) IN THE WALL FOOTING (PER DETAIL E/S4.0) AS REQUIRED
TO PROVIDE CLEARANCES FOR LINE TO PASS OVER THE TOP OF THE FOOTING PER THE
TYPICAL DETAIL UNLESS OTHERWISE SPECIFIED. COORDINATE LOCATIONS, SIZES,
AND INVERTS WITH PLUMBING DRAWINGS.
9. PROVIDE 1/4" PREMOLDED EXPANSION JOINT FILLER AROUND PERIMETER OF SLABS
WHERE THEY ABUT VERTICAL WALL SURFACES AND AT COLUMN ISOLATION JOINTS AS
DETAILED.
10. WHERE VERTICAL STEPS IN WALL FOOTINGS SHOWN ON FOUNDATION PLAN, THEY
SHALL BE A MAXIMUM 2'-0" HIGH SPACED NO CLOSER THAN 4'-0" O.C. SEE E/S4.0
11. CONSTRUCTION JOINTS IN WALL FOOTINGS SHALL BE FORMED VERTICALLY WITH
MINIMUM 2'-0" LAP HORIZONTAL REINFORCING.
12. WHERE FINISHED GRADES DIFFER ON OPPOSITE SIDES OF FOUNDATION WALLS,
PROVIDE TEMPORARY BRACING AT TOP OF WALL TO PREVENT LATERAL MOVEMENT
UNTIL ALL ADJACENT FILLING, COMPACTION, FLOOR SLABS, WALLS, AND FRAMING
AT NEXT LEVEL IS COMPLETED.
13. CAPILLARY BARRIER BELOW FLOOR SLABS SHALL CONSIST OF 4" THICK LAYER OF
GRADED AGGREGATE BASE (GAB) OR COMPACTED CLEAN SAND FILL WITH MAXIMUM
5% FINES (MAXIMUM 5% PASSING #200 SIEVE).
CONCRETE:
1. UNLESS OTHERWISE SHOWN, THE CENTERLINES OF ALL PIERS AND COLUMN
FOOTINGS SHALL BE LOCATED ON COLUMN CENTERLINES OVER.
2. UNLESS SPECIFIED OTHERWISE, CONCRETE COVER OVER REINFORCEMENT SHALL
CONFORM TO THE FOLLOWING:
A. ALL FOOTINGS AND OTHER CONCRETE CAST AGAINST AND PERMANENTLY
EXPOSED TO EARTH: 3"
B. FORMED CONCRETE EXPOSED TO EARTH OR WEATHER:
#5 BAR AND SMALLER: 1 ½"
#6 BAR AND LARGER: 2"
3. ALL REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, UNLESS
NOTED OTHERWISE. PROVIDE A706 BARS WHERE REINFORCING IS INDICATED TO BE
WELDED.
4. PROVIDE DOWELS OF THE SAME SIZE AND NUMBER AS THE VERTICAL WALL AND
COLUMN REINFORCING, UNLESS NOTED OTHERWISE.
5. REINFORCEMENT SHALL BE SPLICED ONLY AT LOCATIONS SHOWN OR NOTED ON THE
STRUCTURAL DOCUMENTS, EXCEPT REINFORCING MARKED CONTINUOUS MAY BE SPLICED
AT LOCATIONS DETERMINED BY THE CONTRACTOR. SPLICES AT OTHER LOCATIONS
SHALL BE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER. ALL SPLICES SHALL
BE LAPPED 48 BAR DIAMETERS UNLESS NOTED OTHERWISE.
6. ALL CONCRETE WORK SHALL CONFORM TO ACI 318 AND CRSI STANDARDS.
7. PIPES OR DUCTS SHALL NOT EXCEED 1/3 SLAB TO WALL THICKNESS UNLESS
SPECIFICALLY DETAILED. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
LOCATION OF SLEEVES, ACCESSORIES, ETC.
8. REFER TO ARCHITECTURAL DRAWINGS FOR MOLDS, GROOVES, ORNAMENTS, CLIPS, OR
OTHER INSERTS REQUIRED TO BE ENCASED IN CONCRETE AND FOR EXACT LOCATIONS
OF FLOOR FINISHES AND SLAB DEPRESSIONS.
9. CONSTRUCTION JOINT LOCATIONS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER.
NO HORIZONTAL CONSTRUCTION JOINTS ARE PERMITTED EXCEPT THOSE SHOWN ON THE
STRUCTURAL DRAWINGS.
10. DEFECTIVE AREAS IN CONCRETE WORK INCLUDING, BUT NOT LIMITED TO,
HONEYCOMBING, SPALLS, AND CRACKS WITH WIDTHS EXCEEDING 0.10" SHALL BE
REPAIRED BY THE CONTRACTOR. THE EXTENT OF THE DEFECTIVE AREA SHALL BE
DETERMINED BY THE STRUCTURAL ENGINEER.
11. NO REINFORCING SHALL BE CUT IN FIELD. ADDITIONAL REINFORCING AND THAT
QUANTITY OF REINFORCING OCCURRING AT OPENINGS SHALL BE PLACED EQUALLY
EACH SIDE OF OPENING AS DETAILED.
12. HOOKS IN REINFORCING ARE IN ADDITION TO LINKS SHOWN.
13. UNLESS NOTED OTHERWISE, DETAILING AND FABRICATION OF REINFORCING STEEL
SHALL FOLLOW ACI “MANUAL OF STANDARD PRACTICE FOR DETAILING OF REINFORCED
CONCRETE STRUCTURES” (ACI 315).
14. REINFORCING SHALL BE SUPPORTED IN FORMS AND SPACED WITH WIRE BAR SUPPORTS
ACCORDING TO CRSI “PLACING REINFORCING BARS”, UNLESS NOTED OTHERWISE.
15. WALL FOOTING SHALL BE POURED MONOLITHICALLY WITH ADJACENT COLUMN FOOTINGS,
WITH THE WALL FOOTING REINFORCING STEEL EXTENDING CONTINUOUS THRU THE COLUMN
FOOTING.
16. FOR AREAS OF SLAB ON GRADE SCHEDULED TO RECEIVE SEALED CONCRETE FINISH,
COORDINATE MIX DESIGN ADMIXTURES, CURING, ETC., WITH SEALING MANUFACTURER'S
REQUIREMENTS.
17. MAINTENANCE BAY SLAB ON GRADE AREAS SHALL HAVE 4000 PSI 28 DAY STRENGTH CLASS OF
CONCRETE.
STRUCTURAL STEEL FRAMING:
1. ALL WIDE FLANGE STEEL SHAPES INCLUDING WT’S SHALL BE FABRICATED USING
ASTM A992 GRADE 50 STRUCTURAL STEEL MATERIAL. ALL OTHER SHAPES, PLATES,
BARS, ETC., SHALL BE ASTM A36 OR AS INDICATED IN DETAILS OR IN
SPECIFICATIONS. RECTAGULAR (AND SQUARE) HSS SHALL BE ASTM A500 GRADE B
(Fy = 46 K.S.I., Fu = 58 K.S.I.)
2. ALL BOLTED CONNECTIONS SHALL BE PRE-TENSIONED JOINT TYPE MADE WITH 3/4"
DIAMETER (MIN.) ASTM A325X HIGH STRENGTH BOLTS (UNLESS NOTED OTHERWISE)
WITH LOAD INDICATOR WASHERS OR LOAD INDICATOR BOLTS (TWIST OFF TYPE)
INSTALLED PER MANUFACTURER’S WRITTEN INSTRUCTIONS.
3. STEEL FRAMING, INCLUDING BOLTED AND WELDED CONNECTIONS, BRACING, AND
ANCHORAGES SHALL BE COMPLETE AND PLUMB PRIOR TO PLACEMENT OF DECKS.
4. TOP OF STEEL ELEVATIONS SHOWN ON FRAMING PLANS ARE MEASURED FROM
FINISHED FIRST FLOOR UNLESS NOTED.
5. ALL STRUCTURAL STEEL CONSTRUCTION SHALL CONFORM TO “SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS - ALLOWABLE STRESS DESIGN” OF AISC 14TH EDITION.
6. ALL FABRICATIONS SHALL COMPLY WITH “CODE OF STANDARD PRACTICE FOR STEEL
BUILDINGS AND BRIDGES”, LATEST EDITIONS, AS PUBLISHED BY THE AMERICAN
INSTITUTE OF STEEL CONSTRUCTION.
7. THE STRUCTURAL DRAWINGS ARE NOT INTENDED TO REPRESENT ALL STEEL REQUIRED
ON THIS PROJECT. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL MISCELLANEOUS STEEL FRAMING NOT SHOWN ON STRUCTURAL DRAWINGS
INCLUDING MISCELLANEOUS ANGLE FRAMING, BRACING, ETC.
8. ALL STRUCTURAL STEEL EXPOSED TO WEATHER SHALL BE HOT-DIPPED GALVANIZED
UNLESS OTHERWISE DIRECTED BY THE ARCHITECT. WHERE WELDING IS USED ON HOT-
DIPPED GALVANIZED FRAMING MEMBERS, WELDS AND ADJACENT AREAS SHALL BE
COATED WITH A COLD GALVANIZING COMPOUND. CONTRACTOR TO SUBMIT DATA SHEET
OF MATERIAL TO BE USED FOR ARCHITECT’S REVIEW.
9. DO NOT FIELD CUT ANY STRUCTURAL STEEL WITHOUT PRIOR REVIEW AND
ACCEPTANCE OF THE ARCHITECT/ENGINEER.
10. NO SHOP SPLICE OR OTHER CONNECTION WILL BE PERMITTED UNLESS THAT SPLICE
OR CONNECTION IS SHOWN ON THE SHOP DRAWINGS AND REVIEWED BY THE ENGINEER.
11. ALL FASTENERS SHALL CONSIST OF ONE BOLT,ONE LOAD INDICATOR WASHER, ONE
HARDENED WASHER, AND ONE NUT. NO SLOTTED HOLES ARE ALLOWED UNLESS
INDICATED ON SECTIONS AND DETAILS.
12. AFTER ALL FIELD WELDING IS COMPLETED, WELDS SHALL BE CLEANED OF ALL
WELDING SPOILS AND RE-PRIMED. SEE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
13. WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS. PROOF OF CERTIFICATION
FOR EACH WELDER PERFORMING FIELD WELDING SHALL BE AVAILABLE AT THE JOB
SITE. ALL WELDERS SHALL HAVE BEEN CERTIFIED WITHIN THE PREVIOUS 12 MONTHS
IN ACCORDANCE WITH SPECIFICATION REQUIREMENTS.
14. WHERE THRU BOLTS ARE DETAILED, PROVIDE A36 OR A307 MATERIAL WITH
3"x1/4"x3" A36 PLATE WASHERS AT THE CMU FACE OF CONNECTION, AND STANDARD
WASHERS AT THE STEEL FACE OF CONNECTION.
SUBMITTALS:
1. ALL SUBMITTALS SHALL BE PREPARED IN ELECTRONIC PORTABLE DOCUMENT FILE
(PDF) FORMAT. SUBMIT ELECTRONIC SHOP DRAWINGS ON SHEETS AT LEAST 8-1/2 X
11 INCHES (215 X 280 mm) BUT NO LARGER THAN 30 X 42 inches (750 X 1067 mm), WITH SUFFICIENT RESOLUTION THAT ALL ITEMS CAN BE CLEARLY IDENTIFIED.
2. SUBMITTALS WILL BE REVIEWED AND ANNOTATED ELECTRONICALLY BY THE ENGINEER
AND RETURNED AS PDF ELECTRONIC FILES TO THE CONTRACTOR.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE ARCHITECT AT THEIR
REQUEST WITH PRINTED COPIES INCLUDING ALL MARKS AND NOTES OF REVIEWED SHOP
DRAWINGS.
PRE-ENGINEERED METAL BUILDING:
1. METAL BUILDING MANUFACTURER SHALL FURNISH ALL ITEMS SPECIFIED OR SHOWN IN THE
CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, FRAMES, BASE PLATES, WIDE
FLANGE WIND BEAM GIRTS, PURLINS, CABLES, RODS, ANGLE FRAMES, ETC., NECESSARY
TO COMPLETE THE STEEL PORTION OF THE STRUCTURE UNLESS SPECIFICALLY DETAILED
OTHERWISE.
2. METAL BUILDING SHALL BE DESIGNED FOR THE FOLLOWING MINIMUM DESIGN LOADS:
A. LATERAL LOADS (WIND AND SEISMIC): SEE "BASIS OF DESIGN" THIS SHEET.
B. ROOF LIVE LOAD: 20.0 PSF
C. DEAD LOADS: COMPUTED AS THE WEIGHT OF ALL BUILDING COMPONENTS SUPPLIED BY
METAL BUILDING MFR.
D. COLLATERAL LOAD: 12.0 PSF COLLATERAL LOAD
(NOTE THAT THE COLLATERAL LOAD ALLOWANCE IS NOT INTENDED TO
INCLUDE THE CONCENTRATED LOADS RESULTING FROM MECHANICAL
EQUIPMENT AND SPECIALIZED SERVICE BAY EQUIPMENT AND VEHICLE
WASH EQUIPMENT WHICH ARE TO BE IN ADDITION TO THE COLLATERAL
LOAD)
E. CRANE LOADS: METAL BUILDING DESIGNER SHALL COORDINATE WITH CRANE
MANUFACTURER TO DETERMINE ALL VERTICAL AND HORIZONTAL
CRANE LOADS TO BE SUPPORTED BY METAL BUILDING, INCLUDING MAXIMUM
DEFLECTION REQUIREMENTS FOR ALL SUPPORTING ELEMENTS. REFER TO
ARCHITECTURAL DRAWINGS FOR BASIS OF DESIGN CRANE CAPACITY AND
SERVICE CLASS, PLAN LIMITS, ELEVATIONS, LOCATIONS WITHIN
BUILDING, ETC.
F. REFER TO ARCHITECTURAL/MECHANICAL/ELECTRICAL/PLUMBING/ETC. FOR EQUIPMENT LOADS AND LOCATIONS, INCLUDING SPECIALIZED SERVICE BAY EQUIPMENT, FLUID DELIVERY SYSTEMS, VEHICLE WASH EQUIPMENT, ETC. INDICATED TO BE SUSPENDED AND SUPPORTED BY METAL BUILDING ROOF FRAMING. METAL BUILDING MFR. SHALL PROVIDE ALL NECESSARY SUPPLEMENTARY SUPPORT FRAMING FOR SPECIFIED/SCHEDULED EQUIPMENT TO BE SUPPORTED. CONTRACTOR SHALL PROVIDE THE METAL BUILDING MANUFACTURER ALL LOCATIONS AND WEIGHTS OF EQUIPMENT TO BE SUPPORTED BY METAL BUILDING SYSTEM. LOADS SHALL BE SHOWN IN THE METAL BUILDING SHOP DRAWING
CALCULATIONS.
G. THE BUILDINGS ARE FULLY SPRINKLED. COORDINATE WITH FIRE PROTECTION SHOP DRAWINGS.
METAL BUILDING MFR. SHALL PROVIDE ALL NECESSARY SUPPLEMENTARY SUPPORT FRAMING FOR
SPRINKLER LINES TO BE SUPPORTED BY METAL BUILDING.
3. THE METAL BUILDING MANUFACTURER SHALL PROVIDE ALL NECESSARY DESIGN AND FRAMING
REQUIRED TO SUPPORT THE SPECIFIED CRANES. THE METAL BUILDING MANUFACTURER SHALL
COORDINATE WITH THE SELECTED CRANE MANUFACTURER TO DETERMINE ALL NECESSARY CRANE
LOADING, INSTALLATION TOLERANCES, AND SERVICEABILITY (DEFLECTION, DRIFT, ETC.)
REQUIREMENTS RELATED TO THE DESIGN AND DETAILING OF THE METAL BUILDING SYSTEM. NOTE THAT THE THE METAL BUILDING SYSTEM SHALL FULLY SUPPORT BRIDGE CRANES WITHOUT SUPPORT FROM CMU WALLS. NOTE: BUILDING SHALL BE DESIGNED FOR CRANE LOADS REGARDLESS OF WHETHER
THE CRANES ARE INSTALLED.
4. BRACING SYSTEMS INCLUDING PORTAL FRAMES, SAG RODS, STRUTS, ETC., SHALL BE THE
STANDARD OF THE BUILDING MANUFACTURER AND SHALL BE INCLUDED IN THE SUBMITTED SHOP
DRAWINGS. MANUFACTURER SHALL COORDINATE LOCATION AND TYPES OF ALL BRACING
NECESSARY TO ACCOMMODATE ALL ARCHITECTURAL REQUIREMENTS.
5. CALCULATIONS FOR FRAME DEFLECTIONS SHALL BE BASED ON THE STIFFNESS OF PRE-
ENGINEERED METAL BUILDING STRUCTURE ONLY AND SHALL NOT INCLUDE STIFFNESS
CONTRIBUTIONS FROM ADJACENT STRUCTURES. CALCULATED DRIFTS AND DEFLECTIONS SHALL
NOT EXCEED THE FOLLOWING:
A. DRIFT DUE TO LATERAL LOADS INDUCED ON THE STRUCTURE
DRIFT DUE TO WIND: H/360
DRIFT DUE TO SEISMIC: H/200
DRIFT DUE TO CRANE: REFER TO CRANE MFR. CRITERIA
B. DEFLECTION LIMITS:
PURLINS: VERTICAL DEFLECTION DUE TO LIVE LOAD = L/240 OF THE SPAN.
WIND GIRT ATTACHED TO MASONRY= HORIZONTAL DEFLECTION DUE TO WIND
L/480 OF THE SPAN.
FRAME: VERTICAL DEFLECTION DUE TO LIVE LOAD = L/240 OF THE SPAN.
VERTICAL DEFLECTION DUE TO DEAD LOAD + LIVE LOAD = L/180 OF THE
SPAN.
ELEMENTS SUPPORTING CRANE: REFER TO CRANE MANUFACTURER'S CRITERIA
6. THE DIAMETER, NUMBER, AND PLACEMENT PATTERN OF ALL ANCHOR BOLTS SHALL BE
DETERMINED BY PRE-ENGINEERED BUILDING MANUFACTURER. ANCHOR BOLT EMBEDMENTS
ARE AS INDICATED IN THE STRUCTURAL FOUNDATION DETAILS.
7. ALL PRE-ENGINEERED METAL BUILDING COLUMNS SHALL BE DESIGNED BASED ON A
“PINNED-BASED” SUPPORT CONDITION. METAL BUILDING STRUCTURE SHALL NOT
INDUCE ANY OVERTURNING OR BENDING MOMENT FORCES INTO THE FOUNDATION OTHER
THAN GRAVITY LOADS DUE TO DEAD, LIVE AND WIND UPLIFTS.
8. REFER TO STRUCTURAL DRAWINGS FOR METAL BUILDING COLUMN BASE PLATE
BEARING ELEVATION.
9. CONTRACTOR SHALL PROVIDE THE METAL BUILDING MANUFACTURER ALL LOCATIONS
AND WEIGHTS OF SPRINKLER PIPES AND ROOF SUPPORTED MECHANICAL AND SERVICE BAY
RELATED EQUIPMENT. LOADS SHALL BE SHOWN IN THE METAL BUILDING SHOP DRAWINGS &
CALCULATIONS.
10. LATERAL BRACING PERPENDICULAR TO RIGID FRAMES (SIDE WALL CONDITION) SHALL
BE PROVIDED BY PORTAL FRAMES AT THE LOCATIONS INDICATED AS PORTAL FRAME BAYS.
METAL BUILDING MANUFACTURER SHALL PROVIDE NECESSARY DETAILS AND MATERIAL TO
ACCOMPLISH TRANSFER OF LATERAL LOADS (OUT-OF-PLANE WIND AND SEISMIC LOADS) AT
END WALL CONDITION PER DETAIL C/S3.0. MASONRY WALLS SHALL NOT BE USED BY THE
METAL BUILDING DESIGNER TO RESIST LATERAL LOADS.
11 GRAVITY LOADS FROM THE 2ND FLOOR FRAMING AREA SHALL BE SUPPORTED BY METAL BUILDING
COLUMNS. SEE SHEET S2.1 2ND FLOOR FRAMING PLAN FOR MORE INFORMATION.
12. ALL CALCULATIONS ARE TO BE PREPARED, SIGNED, AND SEALED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE STATE OF GEORGIA.
SPECIAL STRUCTURAL INSPECTIONS:
A. SPECIAL INSPECTIONS
1. SPECIAL STRUCTURAL TESTS AND INSPECTIONS SHALL BE PERFORMED ON THIS
PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF CHAPTER 17 OF THE
IBC 2012 BUILDING CODE.
2. SPECIAL STRUCTURAL TESTS AND INSPECTIONS SHALL BE PERFORMED BY AN
AGENCY SELECTED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER OF
RECORD (EOR) WHICH MEETS ALL OF THE REQUIREMENTS FOR APPROVAL
INDICATED IN IBC 2006 SECTION 1703.1. SPECIAL INSPECTORS SHALL BE
QUALIFIED PERSONS WHO SHALL DEMONSTRATE COMPETENCE, TO THE
SATISFACTION OF THE BUILDING OFFICIAL, FOR INSPECTION OF THE
PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL
INSPECTION.
3. THE CONTRACTOR SHALL COORDINATE THE INSPECTION SERVICES IN
ACCORDANCE WITH THE PROGRESS OF THE WORK. THE CONTRACTOR SHALL
PROVIDE SUFFICIENT NOTICE TO THE INSPECTOR TO ALLOW PROPER
SCHEDULING OF PERSONNEL.
4. THE COSTS OF THE SPECIAL INSPECTOR’S SERVICES SHALL BE PAID FOR BY
THE OWNER. COSTS OF INSPECTION SERVICES WHICH ARE EXEMPTED UNDER
CHAPTER 17 AND SPECIFIED IN THE PROJECT SPECIFICATIONS, SHALL BE
PAID FOR BY THE CONTRACTOR.
B. REPORTS
1. SPECIAL INSPECTORS SHALL KEEP A RECORD OF ALL INSPECTIONS PERFORMED.
COPIES OF ALL INSPECTIONS SHALL BE FURNISHED TO THE BUILDING
OFFICIAL, THE ARCHITECT, AND THE EOR WITHIN 48 HOURS OF THE
INSPECTION.
2. REPORTS SHALL INDICATE THAT THE WORK WAS PERFORMED AND CONSTRUCTED
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. WORK WHICH DOES NOT
CONFORM TO THE CONTRACT DOCUMENTS SHALL BE IDENTIFIED IN THE REPORT
AND SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR.
3. A FINAL REPORT OF INSPECTIONS DOCUMENTING REQUIRED SPECIAL
INSPECTIONS INCLUDING ANY DISCREPANCIES NOTED IN THE INSPECTIONS
SHALL BE SUBMITTED TO THE BUILDING OFFICIAL, THE ARCHITECT, AND THE
EOR PRIOR TO COMPLETION OF THE STRUCTURAL SYSTEMS BUT AT A FREQUENCY
NOT TO EXCEED 60 DAYS.
C. REQUIRED SPECIAL INSPECTIONS
IBC SPECIAL INSPECTION REQUIRED
SECTION DESCRIPTION OF WORK YES NO REMARKS
1704.2 INSPECTION OF FABRICATORS X 1
1704.3 STEEL CONSTRUCTION X 2
1704.4 CONCRETE CONSTRUCTION X 3
1704.5 MASONRY CONSTRUCTION X 4
1704.6 WOOD CONSTRUCTION X
1704.7 SOILS X 5
1704.8 PILE FOUNDATIONS X
1704.9 PIER FOUNDATIONS X
1704.10 WALL PANELS AND VENEERS X
1704.11 SPRAYED FIRE-RESISTANT
MATERIALS X
1704.12 EXTERIOR INSULATION AND
FINISH SYSTEMS X
1704.13 SPECIAL CASES X 6
1704.14 SPECIAL INSPECTION FOR
SMOKE CONTROL X
REMARKS:
1. WHERE FABRICATION OF STRUCTURAL LOAD BEARING ELEMENTS (I.E.
JOISTS) ARE BEING PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP,
SPECIAL INSPECTIONS ARE REQUIRED.
2. STEEL SPECIAL INSPECTION:
CONTINUOUS AND PERIODIC INSPECTIONS, AS DEFINED BY SECTION 1702 OF
THE IBC 2012 BUILDING CODE, SHALL BE PERFORMED BY THE SPECIAL
INSPECTION AGENCY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
1704.3 AND TABLE 1704.3 WITH THE EXCEPTION THAT INSPECTION OF HIGH
STRENGTH BOLTING MAY BE PERIODIC IN ACCORDANCE WITH IBC 2012,
SECTION 1704.3.3.2.
3. CONCRETE SPECIAL INSPECTION:
CONTINUOUS AND PERIODIC INSPECTIONS, AS DEFINED BY SECTION 1702 OF
THE IBC 2012 BUILDING CODE, SHALL BE PERFORMED BY THE SPECIAL
INSPECTION AGENCY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
1704.4 AND TABLE 1704.4.
4. MASONRY SPECIAL INSPECTION:
CONTINUOUS AND PERIODIC INSPECTIONS, AS DEFINED BY SECTION 1702 OF
THE IBC 2012 BUILDING CODE, SHALL BE PERFORMED BY THE SPECIAL
INSPECTION AGENCY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
1704.5 AND TABLE 1704.5.1 (NON-ESSENTIAL FACILITIES) OR TABLE
1704.5.3 (ESSENTIAL FACILITIES).
5. SOILS SPECIAL INSPECTION:
INSPECTION OF THE EXISTING SITE SOIL CONDITIONS, FILL PLACEMENT AND
LOAD BEARING REQUIREMENTS SHALL BE PERFORMED BY THE SPECIAL
INSPECTION AGENCY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
1704.7 AND TABLE 1704.7.
6. SPECIAL CASES:
MECHANICAL ANCHORS ANCHORING INTO CMU CONSTRUCTION SHALL BE INSPECTED
IN ACCORDANCE WITH THE ICC-ESR OR IAPMO EVALUATION REPORT.
D. CONTRACTOR RESPONSIBILITY:
CONTRACTOR AND SUBCONTRACTORS ENGAGED IN CONSTRUCTION OF MAIN WIND OR
SEISMIC-FORCE RESISTING SYSTEMS SHALL SUBMIT A STATEMENT OF
RESPONSIBILITY TO THE BUILDING DEPARTMENT AND OWNER IN ACCORDANCE WITH
THE PROVISIONS OF SECTION 1706.
E. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE SHALL BE PROVIDED IN
ACCORDANCE WITH THE REQUIREMENTS OF IBC SECTION 1707.
F. STRUCTURAL TESTING FOR SEISMIC RESISTANCE SHALL BE PROVIDED IN
ACCORDANCE WITH THE REQUIREMENTS OF IBC SECTION 1708.
G. A REPRESENTATIVE OF THE EOR SHALL PERFORM A PERIODIC VISUAL STRUCTURAL
OBSERVATION IN ACCORDANCE WITH, AND WHERE REQUIRED BY, IBC SECTION 1709.
SUCH OBSERVATIONS SHALL BE PERFORMED AT SIGNIFICANT STAGES OF
CONSTRUCTION AND AT THE FINAL COMPLETION OF THE STRUCTURAL SYSTEMS. THE
CONTRACTOR SHALL NOTIFY THE EOR TO COORDINATE THE OBSERVATION AND SHALL
NOT CONCEAL ANY PORTIONS OF THE STRUCTURAL SYSTEMS (EXCLUDING
FOUNDATIONS AND OTHER WALL REINFORCING) PRIOR THE EOR'S FINAL REVIEW.
SECOND FLOOR DECK:
1. STRUCTURAL NORMAL WEIGHT CONCRETE FILL (4000 P.S.I. NON-AIR ENTRAINED)
OVER 1 1/2" X 22 GAUGE GALVANIZED STEEL COMPOSITE FLOOR DECK (Fy = 50 KSI)
WITH MIN. (3) CONT. SPANS (TOTAL SLAB THICKNESS = 4"), REINFORCED WITH 6X6-
W4.0 x W4.0 WWF LOCATED WITH 1 1/2" CLEAR FROM THE TOP OF CONCRETE. DECK
SHEETS SHALL BE FASTENED TO SUPPORTING STEEL WITH MINIMUM 5/8" DIA. OR
GREATER ARC PUDDLE WELDS (OR MECHANICAL FASTENERS APPROVED BY THE ENGINEER
OF RECORD) AND SHALL NOT EXCEED A MAXIMUM AVERAGE SPACING OF 12" O.C. WITH
SPACING BETWEEN ANY POINTS OF ATTACHMENT NOT TO EXCEED 18".
STEEL COLUMNS:
1. STEEL COLUMN BASES ARE DESIGNED AS “UN-RESTRAINED”; THEREFORE COLUMNS MUST
BE KEPT BRACED UNTIL ALL HORIZONTAL FRAMING, INCLUDING SLAB OVER
SECOND FLOOR FRAMING, HAS BEEN INSTALLED.
2. COLUMN ANCHOR RODS SHALL BE INSTALLED AND TIED IN PLACE PRIOR TO POURING
CONCRETE. ANCHOR RODS SHALL NOT BE REPAIRED, REPLACED, OR MODIFIED BY THE
CONTRACTOR WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER.
3. WHERE JOISTS ARE SHOWN AT COLUMN LINES, JOISTS BETWEEN COLUMN LINES SHALL
BE EQUALLY SPACED UNLESS NOTED OTHERWISE.
4. UNLESS NOTED OTHERWISE, IF A BEAM IS DISCONTINUOUS AT A COLUMN, BEAM SHALL
BE CONNECTED TO THE FACE OF THE COLUMN RATHER THAN ON TOP OF THE COLUMN.
5. UNLESS NOTED OTHERWISE, WHERE BEAMS ARE NOT CONTINUOUS OVER TUBE OR PIPE
COLUMNS, PROVIDE 3/8" THICK CLOSURE PLATE ON TOP OF TUBE OR PIPE COLUMNS.
STEEL JOISTS:
1. ALL STEEL JOISTS, BRIDGING, AND THEIR CONNECTIONS SHALL BE DESIGNED,
FABRICATED, AND ERECTED, ACCORDING TO THE SPECIFICATIONS OF THE STEEL
JOIST INSTITUTE, LATEST EDITION. All JOISTS SHALL BE DESIGNED BY THE JOIST
MANUFACTURER TO SUPPORT THE TOTAL LOAD-CARRYING CAPACITY SHOWN IN THE STEEL
JOIST INSTITUTE TABLES FOR THE JOIST DEPTH, CHORD DESIGNATIONS, AND SPAN
LENGTH INDICATED ON THE CONTRACT DRAWINGS.
2. ALL STEEL ROOF JOISTS AND BRIDGING SHALL BE DESIGNED FOR A NET UNIFORM
WIND UPLIFT LOAD OF 30.0 PSF (ASD). A 1/3 INCREASE IN ALLOWABLE STEEL
STRESSES SHALL NOT BE PERMITTED FOR WIND LOAD COMBINATIONS. STEEL JOIST
MANUFACTURER TO PROVIDE ADDITIONAL BRIDGING AT ENDS OF BAR JOIST AS
REQUIRED FOR WIND UPLIFT LOAD COMBINATIONS.
3. NUMBER AND LOCATION OF BRIDGING LINES SHOWN ON CONTRACT DRAWINGS, IF ANY,
IS MINIMUM. STEEL JOIST MANUFACTURER SHALL PROVIDE ADDITIONAL BRIDGING ROWS
AS REQUIRED TO MEET STEEL JOIST INSTITUTE REQUIREMENTS AND LATEST OSHA
REGULATIONS.
4. STEEL JOIST MANUFACTURER SHALL HAVE SOLE RESPONSIBILITY FOR FABRICATION,
AND DETAILING OF ALL STEEL JOIST COMPONENTS TO MEET LATEST OSHA
REQUIREMENTS.
5. THE JOIST MANUFACTURER SHALL SUBMIT CALCULATIONS FOR ALL SPECIAL JOISTS
TO THE ENGINEER OF RECORD FOR APPROVAL PRIOR TO FABRICATION. THESE
CALCULATIONS SHALL BEAR THE SIGNED AND DATED SEAL OF THE PROFESSIONAL
ENGINEER REGISTERED IN THE STATE WHERE JOISTS ARE MANUFACTURED.
6. WHERE TWO JOISTS BEAR ON A BEAM WITH A 4" WIDE FLANGE, JOISTS SHALL BE
DESIGNED TO CARRY THE DESIGN LOAD WITH A BEARING OF 1 7/8". JOISTS TO BE
WELDED ALL-AROUND AND WELDED TO EACH OTHER WHEN MINIMUM BEARING OF 1 7/8"
IS USED.
7. STEEL JOISTS SHALL NOT BE MODIFIED WITHOUT THE APPROVAL OF THE STRUCTURAL
ENGINEER.
8. NO PIPING, DUCTS, CONDUITS OR ANY OTHER MECHANICAL OR ELECTRICAL COMPONENT
SHALL BE SUSPENDED FROM JOIST BRIDGING.
9. STEEL JOISTS WHICH ARE SCHEDULED TO RECEIVE SPRAYED ON FIRE PROOFING SHALL
BE UNPAINTED AND MEET THE REQUIREMENTS FOR MINIMUM CHORD AND WEB MEMBERS
REQUIRED BY THE U.L. DESIGN NUMBER REQUIREMENTS SPECIFIED BY THE ARCHITECT.
10. SEE MECHANICAL FOR DUCTS TO BE ROUTED THRU (PERPENDICULAR TO) JOISTS. JOIST
MANUFACTURER SHALL FABRICATE ALL JOIST WEB MEMBERS TO ALIGN SUCH THAT DUCTS
CAN PASS THRU JOIST ON CONTINUOUS STRAIGHT RUN WHERE INDICATED IN MECHANICAL
DRAWINGS. COORDINATE DUCT NUMBER, SIZE, & LOCATION WITH MECH. NOTE THAT THE
DUCT SIZES INDICATED ON PLAN ARE NOMINAL DESIGN SIZE AND DO NOT INCLUDE
INSULATION. COORDINATE TOTAL OUT-TO-OUT DUCT SIZE INCLUDING THICKNESS OF
INSULATION WITH MECHANICAL TO DETERMINE THE OVERALL REQUIRED DUCT CLEARANCE
THRU JOISTS. INDICATE REQUIRED OVERALL DUCTS SIZES AND LOCATIONS IN JOIST SHOP
DRAWINGS.
11. SEE MECHANICAL FOR DUCTS TO BE ROUTED IN BETWEEN AND PARALLEL TO JOISTS WITH
DUCTS RUNNING ABOVE THE BOTTOM CHORD ELEVATION WITHIN THE PLANE OF THE JOIST.
WHERE BOLTED DIAGONAL BRIDGING IS REQUIRED FOR THE JOIST, JOIST MFR. SHALL
DESIGN AND DETAIL TEMPORARY REMOVABLE DIAGONAL BRIDGING IN ADDITION TO
INSTALLING PERMANENT HORIZONTAL BRIDGING IN THOSE INSTANCES.
AFTER ROOF DECK IS INSTALLED AND SECURED TO JOISTS REMOVE TEMPORARY DIAGONAL
BRIDGING AND LEAVE PERMANENT HORIZONTAL BRIDGING IN PLACE. INDICATE IN JOIST
SHOP DRAWINGS. COORDINATE WITH MECHANICAL FOR ALL REQUIRED DUCT LOCATIONS,
ETC.
CONCRETE MASONRY:
1. REINFORCED WALLS, PIERS, AND PILASTERS, SHALL BE FILLED IN MAXIMUM 8'-0"
LIFTS. FILL SHALL BE MECHANICALLY MIXED (ASTM C476) GROUT WITH MAXIMUM ½"
DIA. AGGREGATE AND SHALL DEVELOP NOT LESS THAN 2500 PSI MINIMUM 28 DAY
COMPRESSIVE STRENGTH, INSTALLED WITH 8"-11" SLUMP RANGE
2. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE MASONRY SHALL BE f’m = 1500
PSI.
3. ALL REINFORCING SHALL BE TIED IN CMU CELLS IN THE LOCATION INDICATED ON
THE STRUCTURAL DETAILS AS REQUIRED TO PREVENT DISPLACEMENT OF REINFORCING
DURING PLACEMENT OF GROUT.
4. VERTICAL REINFORCING SHALL BE LAPPED AT DOWELS AND SPLICES PER THE LAP
SCHEDULE ON SHEET S4.0
5. WHERE GROUT POUR HEIGHT EXCEEDS 5'-4" PROVIDE A 4"X4" CLEAN-OUT OPENING
AT THE BOTTOM COURSE OF EACH VERTICAL LIFT AT ALL REINFORCED CELLS EXCEPT
WHERE OPENING CANNOT BE CONCEALED BY BRICK OR OTHER WALL VENEERS OR FINISHES.
PRIOR TO FILLING CELLS WITH GROUT, CMU REINFORCED CELLS SHALL BE THOROUGHLY
FLUSHED TO REMOVE ALL DEBRIS AND MORTAR PROJECTIONS. SEAL OPENING PRIOR TO
FILLING CELL WITH GROUT.
6. WHERE REINFORCED PIERS (TYPES P1, P2, P3, ETC.) ARE INDICATED ON
FOUNDATION PLAN, THEY SHALL BE DISCONTINUOUS ABOVE BEARING OF LINTEL
EXCEPT AS FOLLOWS:
OPENINGS 4'-0" TO 6'-0": CONTINUE JAMB REINFORCING 24" ABOVE OPENING
OPENINGS OVER 6'-0": CONTINUE JAMB REINFORCING TO TOP OF WALL
7. MASONRY CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE
“SPECIFICATION FOR MASONRY STRUCTURES (ACI 530.1-05)” PUBLISHED BY THE
AMERICAN CONCRETE INSTITUTE.
8. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH ASTM A-615, GRADE 60. SHOP
FABRICATE REINFORCING BARS WHICH ARE SHOWN TO BE HOOKED OR BENT. ALL
REINFORCING DOWELS FROM FOUNDATIONS SHALL MATCH VERTICAL REINFORCING, SIZE
AND SPACING INDICATED FOR CONSTRUCTION OF WALL OVER. ALL DOWELS SHALL
HAVE STANDARD 90 DEGREE HOOKS (MINIMUM 6"). THE #2 SMOOTH TIES SHOWN IN
THE REINFORCED MASONRY PIER DETAILS SHALL BE 1/4" DIAMETER PLAIN STEEL
WIRE (W5 WIRE SIZE NUMBER) PER ASTM A 1064 WITH YIELD STRENGTH OF 60 KSI.
9. UNLESS INDICATED OTHERWISE IN SPECIFICATIONS OR ON ARCHITECTURAL
DRAWINGS, PROVIDE 9 GA. HORIZONTAL TRUSS TYPE JOINT REINFORCING AT 16"
O.C. IN ALL WALLS. DISCONTINUE JOINT REINFORCING AT CONTROL JOINTS.
10. PROVIDE CMU CONTROL JOINTS WHERE INDICATED ON ARCHITECTURAL DRAWINGS
WITH ADDITIONAL JOINTS SUCH THAT THE SPACING BETWEEN JOINTS DOES NOT
EXCEED A SPACING OF 3 TIMES THE WALL HEIGHT (30'-0" MAX.) AS DIRECTED BY
ARCHITECT. WHERE BEAMS OR LINTELS BEAR AT CMU CONTROL JOINTS, OFFSET JOINT
AND LAP THE VERTICAL REINFORCING AS INDICATED. IN NO CASE SHALL CONTROL
JOINTS BE INSTALLED IN LINTELS, THROUGH OPENINGS IN MASONRY WALLS, OR WITHIN
8" BEARING OF STRUCTURAL MEMBER.
MECHANICAL ANCHORS
SEE DETAILS FOR NUMBER, DIAMETER, AND EMBEDMENT.
A. ANCHORING INTO CMU:
ALL ANCHORS SHALL BE INSTALLED IN GROUTED FILLED CELLS. MECHANICAL ANCHORS
SHALL HAVE BEEN TESTED IN ACCORDANCE WITH ICC-ES AC01 OR ICC-ES AC106.
PRE-APPROVED PRODUCTS INCLUDE:
(1) SIMPSON STRONG-TIE “STRONG BOLT 2” (IAPMO ES ER-240)
(2) HILTI KWIK BOLT 3 (ICC-ES ESR 1385)
(3)POWERS FASTENING POWER STUD+ SD1 (ICC-ES ESR 2966)
B. ANCHORING INTO CONCRETE:
MECHANICAL ANCHORS SHALL HAVE BEEN TESTED IN ACCORDANCE WITH ACI 355.2 AND
ICC-ES AC193 FOR CRACKED CONCRETE AND SEISMIC APPLICATIONS. PRE-APPROVED
PRODUCTS INCLUDE:
(1) SIMPSON STRONG-TIE “STRONG-BOLT 2” (ICC-ES ESR-3037)
(2) HILTI KWIK BOLT TZ (ICC-ES ESR 1917)
(3) POWERS FASTENING POWER STUD+ SD1 (ICC-ES ESR 2818)
SAUSSY ENGINEERING
400 Johnny Mercer Boulevard Suite E
P.O. Box 30597 Savannah, Georgia 31410
Phone: (912) 898-8255 Fax: (912) 898-1882
Not Valid Unless Signed
IRG
ED
TSIG ER
A
R
EG
No. 19126
E
O
I
,YN ER
SUSR A
G ENI
S
W H
T
U
N
PROFESSIONAL
E
E
I I
N O R T H
517 EAST CONGRESS STREET
SAVANNAH, GEORGIA 31401
tel 912.234.6318 fax 912.236.8414 cogdellmendrala.com
PROJECT CONSULTANTS:
SEAL:
SHEET TITLE:
PROJECT NO:
DRAWN BY:
DATE:
SCALE:
SHEET:
KEY PLAN:
COGDELL & MENDRALA ARCHITECTS, PC
STRUCTURAL ENGINEER:
MECHANICAL & PLUMBING ENGINEER:
DULOHERY WEEKS, INC.
333 COMMERICAL DRIVE
SAVANNAH, GA. 31406
SAUSSY ENGINEERING
400 E. JOHNNY MERCER BOULEVARD
SAVANNAH, GA 31410
CIVIL ENGINEERS:
CHATHAM COUNTY
DEPARTMENT OF ENGINEERING
124 BULL STREET, SUITE 430
SAVANNAH, GA 31401
MAINTENANCE
BAYS
OFFICE
SUITE
Cogdell MendralaArchitects
PROJECT NO. 16102
1 : 11 /1
/2
:3 :4
P
M
S0.1
STRUCTURAL
NOTES
AJB/GJH
OCTOBER 2018
C O
N S T R U
C T
IO
N D
O C U
M E N
T S
IS
S U
E D
F O
R B
ID
C H
A T
H A
M C
O U
N T
Y F
L E
E T
S E
R V
IC
E
S F
A C
IL
IT
Y
M
IN
U S
A V
E N
U E
G A
R D
E N
C
IT
Y G
A
C H
A T
H A
M C
O U
N T
Y B
O A
R D
O F
C O
M M
IS
S
IO
N
E R
S
SHEET LIST
SHEET
NUMBER SHEET NAME
Current
Revision
S0.1 STRUCTURAL NOTES
S1.1 FOUNDATION PLAN
S1.2 FOUNDATION SECTIONS
S1.3 FOUNDATION SECTIONS
S1.4 FOUNDATION PLAN ADDITIVE ALTERNATE #1
S1.5 FOUNDATION PLAN VEHICLE WASH AND TRASH ENCLOSURE
S2.0 WALL BRACING PLAN
S2.1 SECOND FLOOR FRAMING PLAN
S2.2 FRAMING SECTIONS
S3.0 COLUMN AND FOUNDATION SCHEDULE
S4.0 TYPICAL DETAILS
S4.1 TYPICAL DETAILS
REVISION SCHEDULE
DATE DESCRIPTION
C L
3'-0"
6"
C O
O R
D W
P
L A
N
3'-6"
L A
P
S E
E S
C H
E D
U L E
EQ. EQ.
2'-0"
1'-0"
#4 AT 16" O.C.
4#5 CONT. OVER
VAPOR BARRIER
3/8"
FIN. FLR.-
SEE PLAN
TOP OF FOOTING-
SEE PLAN
12" CMU REINF. W/ 2#5 AT
24" O.C. IN GROUT FILLED
CELLS
PEJ
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
CONCRETE SLAB ON GRADE-
SEE FOUNDATION PLAN FOR
THICKNESS AND REINFORCING
SOLID GROUT
FILL BELOW FIN.
FLOOR
4"x4" KNOCKOUT
AT VERT. REINF.
CELLS
2#6 CONT. TOP & BOTTOM-
LAP 2'-6" @ SPLICES &
CORNERS
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
RECESSED CONC. SLAB ON
GRADE- SEE PLAN FOR
THICKNESS AND REINF.
SEE ARCH. LIMITS
#3 HOOKED DOWELS EACH SIDE AT
24" O.C. EXTENDED UP FROM FIRST
POUR (2" CL. FROM TOP)
#3 @ 24" O.C.- 2" CL.
COVER AT TOP
CONT. 4" PVC FUEL RESISTANT
WATER STOP. NOTCH AT #3
BARS AS REQUIRED
2ND POUR: CURB
2#5 CONT. OVER #3 AT 24" O.C.
(PROVIDE 2" CL. COVER AT TOP
AND SIDES).
FIRST POUR
COMPACTED SUBGRADE
3" CL. COVER TYP.
SIDES AND BOTTOM
COMPACTED SUBGRADE
METAL WALL PANELS-
SEE ARCH.
3/4" CHAMFER
OVERHEAD COILING
DOOR ASSEMBLY
2#4 CONT. SUPPORT
BAR
CONT. L3x2x5/16 (SLV) 5/8"Ø x4" HEADED STUDS WELDED
TO ANGLE AT 12" O.C.
#3 AT 24" O.C.- 2"
CLEAR FROM TOP
OF SLAB
2#5 CONT.
CONT. 2x4 KEY JOINT
2#5 CONT.
CONCRETE PAVING-SEE CIVIL
FOR SLOPE
COORD. W/ DOOR MFR
SEE SECTION
C/S1.1
12" CMU JAMB
BEYOND
VERIFY WITH ARCH.
AND CIVIL
/2
2'-6"
(MIN.)
(M
IN
(MIN.) (MIN.)
CL.
C L
C L
C L
1'-6" 12"8"
"3
SEE SECTION AT ADJACENT
WALL BEYOND
2"
EQ. EQ.
TOP OF FOOTING-
SEE PLAN
FIN. FLR.-
SEE PLAN
CONCRETE SLAB ON GRADE-
SEE FOUNDATION PLAN FOR
THICKNESS AND REINFORCING.
SEE ARCH. FOR SLOPE
2#5 DOWELS AT 24" O.C.
EXTENDED TO WITHIN
4" OF TOP OF CONCRETE
C L
C O
O R
D W
P
L A
N
"3
3'-6"
L A
P
S E
E S
C H
E D
U L E
EQ. EQ.
FLOOR
FILL BELOW FIN.
SOLID GROUT
#4 AT 16" O.C.
4#5 CONT. OVER
VAPOR BARRIER
3/8"
SUBGRADE
COMPACTED
FIN. FLR.-
SEE PLAN
TOP OF FOOTING-
SEE PLAN
AT VERT. REINF.
4"x4" KNOCKOUT
CELLS
12" CMU REINF. W/ 2#5 AT
24" O.C. IN GROUT FILLED
CELLS
PEJ
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
CONCRETE SLAB ON GRADE-
SEE FOUNDATION PLAN FOR
THICKNESS AND REINFORCING
PAVING- SEE CIVIL
METAL WALL PANELS-
SEE ARCH.
C L
C O
O R
D W
P
L A
N
"3
3'-6"
L A
P
S E
E S
C H
E D
U L E
EQ. EQ.
FLOOR
FILL BELOW FIN.
SOLID GROUT
#4 AT 16" O.C.
4#5 CONT. OVER
VAPOR BARRIER
3/8"
SUBGRADE
COMPACTED
FIN. FLR.-
SEE PLAN
TOP OF FOOTING-
SEE PLAN
AT VERT. REINF.
4"x4" KNOCKOUT
CELLS
12" CMU REINF. W/ 2#5 AT
16" O.C. IN GROUT FILLED
CELLS
PEJ
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
CONCRETE SLAB ON GRADE-
SEE FOUNDATION PLAN FOR
THICKNESS AND REINFORCING
PAVING OR FINISHED
GRADE- SEE CIVIL
METAL WALL PANELS-
SEE ARCH.
A
0 1 2 3 4 5 6 7 8 9
C
F
H
D
G
SEE SHEET S1.4 FOR ADDITIVE ALTERNATE #1
25' - 0" 25' - 4" 25' - 0" 20' - 0" 22' - 0" 25' - 4" 21' - 3 5/8" 12' - 10 3/4" 16' - 10"
/1
/1
/8
/1
/1
/4
/4
C
S1.1
E
S1.3
D
S1.3
D
S1.1
F
S1.3
8" THICK CONCRETE SLAB
ON GRADE (4000 PSI) REINF.
WITH 6x6-W4.0xW4.0 WWF
MAIN FIN. FLR. ELEV.
(0'-0" REFERENCE)
CJ
R
D
S1.3
(-2'-0")
/SEE D S4.0
/SEE F S3.0
P3 P3
P4
F
S1.2
A
S1.2
(TYP.)
A
S1.2
D
S1.2
REFER TO SHEET S0.1
FOR METAL BUILDING
NOTES AND CRITERIA
SEE A/S4.0 FOR VERTICAL
REINFORCING STEEL
DETAILS
SEE B/S4.0 FOR REINFORCED
MASONRY PIER DETAILS
(TYP.)
P4
P2
P2
P2
P2 P2
P1 P1
P1 P1P1 P1P1 P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P2 P2P1P1
(-2'-0")(-2'-0") (-2'-0") (-2'-0")
(-2'-0")
(-2'-0") (-2'-0")
(-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0")
(-2'-0") (-2'-0")(-2'-0")(-2'-0")(-2'-0")(-2'-0")
(-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0") (-2'-0")
(-2'-0")
(-2'-0")
6" THICK CONCRETE SLAB
ON GRADE (4000 PSI) REINF.
WITH 6x6-W2.9xW2.9 WWF
6" THICK CONCRETE SLAB ON GRADE
(4000 P.S.I.) REINF. WITH 6x6-
W2.9xW2.9 WWF
P1
P1
P1 P1P1
P1
P1P1P1P1 P3
P3
P1
B
E
R
R
R
"LP1" INDICATES HSS5x5X3/8
LOUVER POST WITH BASEPLATE
TYPE BP3- COORDINATE WITH
ARCH. FOR LAYOUT.
LP1
LP1
LP1
LP1
LP1
LP1
LP1
LP
LP
P1 P1
P1
P1
G
S1.3
G
S1.3
P2
P2
P3
P2
P2
(-2'-0")
(-2'-0")
R
R
D
S1.2
R
/SEE A S1.2
H
S1.3
H
S1.3
A
S1.3
C
S1.3
4" THICK CONCRETE SLAB
ON GRADE REINF. WITH
6x6-W2.1xW2.1 WWF
PORTAL FRAME BAY (BASE BID) PORTAL FRAME BAY
PORTAL FRAME BAY (BASE BID) PORTAL FRAME BAY
C
S1.2
C
S1.2
E
S1.2
B
S1.2
B
S1.2
E
S1.2
G
S1.2
H
S1.3
H
S1.3
SIM.
SIM.
/SEE A S1.3
B
S1.3
B
S1.3
SIM.
/SEE D S3.0
A
S1.2
A
S1.2
A
S1.2
RECESSED 6" THICK
CONCRETE SLAB ON GRADE
(4000 P.S.I.) REINFORCING
WITH 6x6-W4.0xW4.0 WWF
P2
P2
FLOOR DRAINS NOT
SHOWN FOR CLARITY-
SEE ARCH. AND
PLUMBING- TYP.
P2 CENTERED ON BEAM
BEARING ABOVE
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J C
J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J C J
C J
C J
C J C
J
C J
C J
C J
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ
CJ
CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ
C J
C J
C J
C J
C J
C J
CJ CJ CJ
CJ CJ CJ CJ
CJ CJ CJ CJ
CJ CJ CJ CJ
CJ
CJ
CJ CJ
CJ CJ CJ CJ
CJ CJ CJ CJ
CJ CJ
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C
JC
J
C J
C J
C J
C J
CJCJCJ
CJ
CJ
C J
C J
C J
C J
TOP OF FOOTING ELEVATION
IS MEASURED RELATIVE TO
MAIN FIN. FLR. 0'-0" REFERENCE
(TYP.)
EXTERIOR FACE OF 12" CMU
WALL (VERIFY WITH ARCH.)
EXTERIOR FACE OF 12" CMU
WALL (VERIFY WITH ARCH.)
VERIFY W/ ARCH.
EXTEND WALL FOOTING
AS SHOWN
K
S1.3
1' - 0 5/8"
/1
/8
1' - 0 5/8"
IF ADDITIVE ALTERNATE #1 IS ACCEPTED, THE
PORTAL FRAME BAY MOVES FROM BETWEEN GRIDS
2 AND 3 TO BETWEEN GRIDS 1 AND 2 - SEE SHEET
S1.4
(-2'-0")
(-2'-0")
J
S1.3
L
S1.3
EXTERIOR FACE OF 12" CMU
WALL (VERIFY WITH ARCH.)
F
S1.2
VERIFY W/ ARCH.
V E
R
IF
Y W
A
R C
H
V E
R
IF
Y W
A
R C
H
10"
L
S1.3
SIM.
B
S1.1
A
S1.1
LP1
LP1
LP1
SIM.
SIM.
C
S1.3
C
S1.1
SEE TYPICAL DETAIL ON
SHEET S4.0 FOR TURNDOWN
SLAB
C J
C J C
J
C J C
J
C J
C J
C J
C J
C J
(-2'-0")(-2'-0")
(-2'-0")(-2'-0")
(-2'-0")
(-2'-0")
(-2'-0")(-2'-0")
(-2'-0")(-2'-0")
ENLARGE COLUMN ISOLATION
ENCASEMENT AS REQUIRED
AT PORTAL FRAME COLUMNS
(TYPICAL)
TRENCH DRAIN-
SEE ARCH. &
PLUMBING
AT ROLL UP
DOOR
H
S2.2
/SEE D S4.0
R
R
R
R
INSIDE FACE OF 12" CMU
WALL (VERIFY WITH ARCH.)
/SEE D S4.1
CONTRACTOR SHALL
COORDINATE RECESS
WITH PLUMBING FIXTURE
CONTRACTOR SHALL
COORDINATE RECESS WITH
PLUMBING FIXTURE
4" THICK CONCRETE SLAB ON
GRADE REINFORCING WITH
6x6-W2.1xW2.1 WWF. SEE
ARCH. FOR SLOPE
SEE PLUMBING FOR
SLOPE OF BOTTOM OF
TRENCH
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
C J
C J
C J
C J
C J
C J
C J
C J
C J
PRE-ENG. STAIR POST
NOT SHOWN FOR CLARITY
MAIN FIN. FLR. ELEV.
(0'-0" REFERENCE)
FD
SEE TYPICAL DETAIL ON
SHEET S4.0 FOR TURNDOWN
SLAB
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
SEE ARCH. FOR FENCE TUBE
POSTS AND FOOTING
4" THICK CONCRETE SLAB ON
GRADE REINFORCING WITH
6x6-W2.1xW2.1 WWF. SEE
ARCH. FOR SLOPE
SIM.
SIM.
R
P1
P1
P2
FD
SECTION A
S1.1
SECTION B
S1.1
SECTION C
S1.1
SECTION D
S1.1 SAUSSY ENGINEERING
400 Johnny Mercer Boulevard Suite E
P.O. Box 30597 Savannah, Georgia 31410
Phone: (912) 898-8255 Fax: (912) 898-1882
Not Valid Unless Signed
IRG
ED
TSIG ER
A
R
EG
No. 19126
E
O
I
,YN ER
SUSR A
G ENI
S
W H
T
U
N
PROFESSIONAL
E
E
I I
N O R T H
517 EAST CONGRESS STREET
SAVANNAH, GEORGIA 31401
tel 912.234.6318 fax 912.236.8414 cogdellmendrala.com
PROJECT CONSULTANTS:
SEAL:
SHEET TITLE:
PROJECT NO:
DRAWN BY:
DATE:
SCALE:
SHEET:
KEY PLAN:
COGDELL & MENDRALA ARCHITECTS, PC
STRUCTURAL ENGINEER:
MECHANICAL & PLUMBING ENGINEER:
DULOHERY WEEKS, INC.
333 COMMERICAL DRIVE
SAVANNAH, GA. 31406
SAUSSY ENGINEERING
400 E. JOHNNY MERCER BOULEVARD
SAVANNAH, GA 31410
CIVIL ENGINEERS:
CHATHAM COUNTY
DEPARTMENT OF ENGINEERING
124 BULL STREET, SUITE 430
SAVANNAH, GA 31401
MAINTENANCE
BAYS
OFFICE
SUITE
Cogdell MendralaArchitects
PROJECT NO. 16102
As indicated1 /1
/2
:3 :4
P
M
S1.1
FOUNDATION
PLAN
AJB/GJH
OCTOBER 2018
C O
N S T R U
C T
IO
N D
O C U
M E N
T S
IS
S U
E D
F O
R B
ID
C H
A T
H A
M C
O U
N T
Y F
L E
E T
S E
R V
IC
E
S F
A C
IL
IT
Y
M
IN
U S
A V
E N
U E
G A
R D
E N
C
IT
Y G
A
C H
A T
H A
M C
O U
N T
Y B
O A
R D
O F
C O
M M
IS
S
IO
N
E R
S
FOUNDATION PLAN
SCALE: 1/8"=1'-0"
COL
APRON SLAB- SEE PLAN. (SAME
THICKNESS AND REINFORCING AS
ADJACENT SERVICE BAY. SEE CIVIL
FOR SLOPE
1'-0"
2'-0"
0'-10"
2#6 TOP & BOTTOM-LAP
2'-6" @ SPLICES &
CORNERS
OPTIONAL POUR
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
COMPACTED
SUBGRADE
METAL WALL PANELS-
SEE ARCH.
CONC. SLAB ON GRADE-
SEE PLAN FOR THICKNESS
AND REINFORCING. SEE
ARCH. FOR SLOPE
#4 SUPPORT BAR-
CUT @ CJ's
VAPOR BARRIER- SEE NOTES
FIN. FLR.-
SEE PLAN
#3 @ 24" O.C.- 2" CL.
COVER FROM TOP
BOARD FORM
GRADE BEAM
3" CL. COVER
TYP SIDES AND
BOTTOM
VERIFY WITH ARCH.EXTERIOR FACE OF METAL
BUILDING WALL GIRT (VERIFY
WITH ARCH.)
SEE C/S1.2
COL
COL
COL
C
L
C L
SEE A/S1.2 &
C/S1.2
C O
O R
D W
P
L A
N D
E P
T H
S
E E
S C
H E
D U
L E
FOOTING SIZE SEE SCHEDULE
0'-10"
5"
EQUAL EQUAL
4"
VAPOR BARRIER- SEE NOTES
SUBGRADE
COMPACTED
TOP OF FOOTING-
SEE PLAN
METAL WALL PANEL-
SEE ARCH.
SEE SCHEDULE FOR
REINFORCING
CAPILLARY BARRIER- SEE
NOTES ON SHEET S0.1
CONCRETE SLAB ON GRADE-
SEE FOUNDATION PLAN FOR
THICKNESS AND REINFORCING.
SEE ARCH. FOR SLOPE
CENTERLINE OF COLUMN
FOOTING OFFSET 5" FROM
EXTERIOR FACE OF
BUILDING COLUMN
PRE-ENG. COLUMN-
SEE PLANS. EXTEND DOWN
TO AND ANCHOR DIRECTLY
TO TOP OF COLUMN FOOTING
"A" "A"
TOP OF FOOTING CONCRETE
SHALL BE INSTALLED AT
SPECIFIED TOP OF FOOTING
ELEVATION AND LEVEL
WITHIN 1/16" EACH AXIS AT
BASEPLATE LOCATION
PRE-ENG. METAL BUILDING COLUMN ANCHOR RODS.
COORDINATE WITH METAL BUILDING SHOP DRAWINGS
FOR DIAMETER AND LAYOUT. PROVIDE 5" PROJECTION
ABOVE TOP OF FOOTING. PROVIDE RODS AS ASTM F1554
GRADE 36 HEADED TYPE ANCHOR RODS EMBEDDED TO
6" FROM BOTTOM OF FOOTING
CENTERLINE OF FOOTING
AT CENTERLINE OF P.E.
COLUMN SHAPE. (COORD.
WITH METAL BUILDING
DRAWINGS FOR COLUMN
SIZE)
PLAN "A-A" MINIMUM 4" ANCHOR ROD SPACING IN
EACH DIRECTION (BASED ON ANCHOR
ROD IN CONCRETE DESIGN). METAL
BUILDING MFR. SHALL COMPLY WITH
THIS MINIMUM SPACING REQUIREMENT
FORMED CONCRETE ENCASEMENT
POURED AFTER COLUMN IS SET.
PROVIDE MIN. 6" COVER AROUND
BASEPLATE EACH SIDE
PRE-ENG. METAL BUILDING
COLUMN ANCHOR RODS.
COORDINATE WITH METAL
BUILDING SHOP DRAWINGS
FOR DIAMETER AND LAYOUT.
EXTERIOR VERTICAL
FACE OF BUILDING
COLUMN
PRE-ENGINEERED METAL
BUILDING COLUMN- SEE
FLOOR PLAN
FIN. FLR.-
SEE PLAN
REINFORCING CONTINUOUS
THRU CONCRETE ENCASEMENT
AROUND COLUMNS- SEE A/S1.2
FOR REINFORCING
WHERE GRADE BEAM
OVERLAPS COLUMN FOOTING:
PROVIDE #4 DOWELS WITH
STANDARD 90 DEGREE HOOK
AT 12" O.C. FROM COLUMN
FOOTING INTO GRADE BEAM.
EXTEND DOWELS TO WITHIN 4"
OF TOP OF GRADE BEAM
EXTERIOR FACE OF METAL
BUILDING WALL GIRT (VERIFY
WITH ARCH.)
/2
COL
C L
CONT. 2x4 KEY JOINT
2#5 CONT. (3" CL.)
EXTERIOR SLAB-
SEE SITE PLANS
OVERHEAD COILING
DOOR ASSEMBLY
CONT. L3x2x5/16 (SLV) 5/8"Ø x4" HEADED STUDS WELDED
TO ANGLE AT 12" O.C.
VERIFY WITH ARCH.
AND CIVIL
APRON SLAB- SEE PLAN.
(SAME THICKNESS AND
REINFORCING AS ADJACENT
SERVICE BAY. SEE CIVIL
FOR SLOPE
1'-0"
0'-10"
8"
COORD. W/ DOOR MFR.
COMPACTED
SUBGRADE
FIN. FLR.-
SEE PLAN
SEE A/S1.2 FOR ADDITIONAL
INFORMATION
VERIFY WITH ARCH.EXTERIOR FACE OF METAL
BUILDING WALL GIRT (VERIFY
WITH ARCH.)
SECTION AT ROLL
UP DOOR
COL
COL
COL
C L
C L
C O
O R
D W
P
L A
N D
E P
T H
S
E E
S C
H E
D U
L E
FOOTING SIZE SEE SCHEDULE
0'-10"
COORD. WITH METAL
BUILDING MFR.
EQUAL EQUAL
VAPOR BARRIER- SEE NOTES
SUBGRADE
COMPACTED
TO…