15_Attachment 2 - Legal Spt for OGC QASP 5_16_24.pdf
PDF 138 KB Posted
- Solicitation number
- 2032H324R00019
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a Department of the Treasury contract to provide legal support services to the Office of the General Counsel (OGC). The QASP outlines the performance standards, quality levels, and surveillance methods the government will use to monitor the contractor's performance. The key requirements include providing professional quality advice and documentation for tasks such as equity and debt disposition support, asset management support, compliance support, and oversight support within specified timeframes. The contractor's performance will be inspected for 98% accuracy, and deficiencies could lead to potential contract termination. The document also includes a Performance Requirements Summary table and a sample Quality Assurance Monitoring Form. This QASP supports the federal contract opportunity for "Office of the General Counsel (OGC) Legal Support Services" solicited by the Department of the Treasury.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Office of the General Counsel (OGC) Legal Support Services
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Technical Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting ..................................................................................... Error! Bookmark not defined.
6.3 Reviews and Resolution
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) sets forth the procedures and guidelines the Department of the Treasury will use in ensuring the required performance standards or services levels are achieved by the contractor while performing the requirements in the Performance Work Statement (PWS) as identified within each Blanket Purchase Agreement (BPA) order, unless otherwise identified at the order level.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received under each order, unless otherwise identified at the order level.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by all offices authorized to use the BPA as identified in the scope of the PWS, to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.
The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR) and the contractor. The CO will designate a full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 Contracting Officer’s Representative
The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The CO is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
The baseline required performance standards and/or quality levels are included in the PWS and in Attachment 1, Performance Requirements Summary, however alternate standards and levels may be identified at the order level based on the required support needs..
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are;
Random monitoring, which shall be performed by the COR designated inspector and official government project representative.
Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.
4.2 Communications
The contractor is expected to establish and maintain professional communication between contractor representatives, order representatives and the COR. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer discussions.
Complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, and must be forwarded to the COR. The COR will accept those complaints and investigate using email.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. Levels of performance are keyed to the relative importance of the task to the overall mission performance at the Department of the Treasury.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 or through email. The form or email, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms and emails.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reviews and Resolution
6.2.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis
Issues and concerns of both parties
Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
Recommendations for improved efficiency and/or effectiveness
6.2.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.2.3 The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the Government.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Service (PWS Tasks)
Performance Standard
Acceptable Quality Level
Method(s) of
Surveillance Incentive (Positive and/or Negative)
Task 1 – Equity and debt disposition support
The contractor shall provide professional quality advice and documentation as specified in the order PWS within ten (10) business days of the request.
98% Accuracy
Inspection - All deliverables and reports will be reviewed by Treasury to ensure contractor accuracy, completeness, professional quality, and overall compliance with contract requirements.
Potential termination of contract for multiple deficiencies.
The Government will consider errors;
misleading statements; and incomplete information as deficiencies.
Task 2 – Asset management support
The contractor shall provide professional quality advice and documentation as specified in the order PWS.
Due dates for drafts, reviews, or revisions will vary depending on the scope and complexity of the assignment but must be completed within two (2) weeks of the request, unless otherwise agreed to.
Respond to verbal requests for advice within one (1) business day.
Respond to written requests for advice within three (3) business days.
98% Accuracy
Inspection - All deliverables and reports will be reviewed by Treasury to ensure contractor accuracy, completeness, professional quality, and overall compliance with contract requirements.
Potential termination of contract for multiple deficiencies.
The Government will consider errors;
misleading statements; and incomplete information as deficiencies.
Task 3 – Compliance support
The contractor shall provide professional quality advice and documentation as specified in the order PWS within five (5) business days of the request.
98% Accuracy
Inspection - All deliverables and reports will be reviewed by Treasury to ensure contractor accuracy, completeness, professional quality, and overall compliance with contract requirements.
Potential termination of contract for multiple deficiencies.
The Government will consider errors;
misleading statements; and incomplete information as deficiencies.
Task 4 - Oversight support
The contractor shall provide professional quality advice and documentation as specified in the order PWS.
The due date for each query will be based on the deadline imposed by the oversight body. A typical response time is five calendar days.
98% Accuracy
Inspection - All deliverables and reports will be reviewed by Treasury to ensure contractor accuracy, completeness, professional quality, and overall compliance with contract requirements.
Potential termination of contract for multiple deficiencies.
The Government will consider errors;
misleading statements; and incomplete information as deficiencies.
Monthly status report
The contractor shall provide complete and accurate documentation as specified in the order PWS by the 27th of each month, with respect to the preceding month.
98% Accuracy
Inspection - All deliverables and reports will be reviewed by Treasury to ensure contractor accuracy, completeness, professional quality, and overall compliance with contract requirements.
Potential termination of contract for multiple deficiencies.
The Government will consider errors;
misleading statements; and incomplete information as deficiencies.
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
File details come from the government source that posted it. Updated .