1426184-2074075905Statement of Work.pdf
PDF 258 KB Posted
- Attached to
- Invasive vegetation Eradication & Treatment
- Solicitation number
- AG-EXT-ITB-6610
- Issued by
- Orange County, Texas
About this file
This is a Statement of Work document issued by Texas A&M University (TAMU) Administrative Services Procurement Office on behalf of the Naval Air Station Corpus Christi (NASCC) under Partnership Agreement Number N0969726GTC16358. The project focuses on invasive species management, specifically the eradication of Brazilian peppertree (Schinus terebinthifolius) across approximately 5.5 acres at NASCC, including two shoreline sections (Dimmit and Southern Fence Line) and two golf course areas. The contractor must participate in a virtual kickoff meeting to clarify field work plans and schedules, execute cut-stump treatment methodology during appropriate environmental timing windows, and submit draft reports within 30 days of field work completion and final reports within 30 days of receiving government comments. The contract period of performance runs from 8 June 2026 through 7 June 2027 (12 months), with monthly task order status reports required at minimum quarterly intervals. Key deliverables include meeting minutes submitted within five days of completion, draft survey reports, and final reports with photographs and Geographic Information System (GIS) data.
The contractor must employ commercially-certified herbicide applicators licensed in Texas, provide proof of certification prior to work commencement, and report all herbicide applications monthly through the NAVFAC online pest management reporting system (NOPRS). All vehicles transporting herbicides must be properly marked, equipped with fire extinguishers, spill containment kits, emergency eye-wash stations, and first aid kits, with herbicides stored in locked compartments separate from vehicle cabs. Cost estimates must be prepared using PACES or RS Means with itemized breakout costs presented in tabulated format within submitted reports. All submittals must be delivered electronically to NAVFAC Southeast and designated installation points of contact, with file transfers conducted through DoD SAFE or an approved FTP site; flash drive usage is prohibited. Base access requires submission of personnel lists and timeframes to the Installation Natural Resources Manager at least two weeks prior to arrival, with SECNAV 5512 forms completed upon first visit to obtain DBIDS passes. The Principal Investigator is identified as Mathew Kramm, Ph.D., with the Installation Natural Resources Manager contact listed as Scott McGuire.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative Services Procurement Office
2147-TAMU
College Station, TX 77843-2147 Tel. 979-847-5801 | agrilifeas.tamu.edu
Specifications/Statement of Work
STATEMENT OF WORK
Partnership Agreement Number: N0969726GTC16358
Period of Performance: 8 June 2026 – 7 June 2027 (12 months)
Invasive Species Management at Naval Air Station Corpus Christi, Texas.
Background
The Naval Air Station Corpus Christi (NASCC) environmental program ensures military mission activities remain unencumbered and are conducted in compliance with all applicable environmental laws, regulations and policies. The NASCC Integrated Natural Resources Management Plan (INRMP) helps to guide the implementation of the environmental program.
On an annual basis, NASCC staff meet with partners from federal and state natural resources management agencies to evaluate the INRMP’s support of the mission and the effects of its implementation. Additionally, the United States Navy (Navy) has a requirement to control and manage invasive plant species located on Navy lands under Section 7 U.S. Code (U.S.C.) 2814, 16 U.S.C. 670a-f, and Executive Order (EO) 13112. In accordance with the NASCC INRMP and aforementioned regulations, the purpose of the tasks outlined in this Statement of Work (SOW) is the removal of the invasive species Brazilian peppertree (Schinus terebinthifolius) on two sections of the NAS CC shoreline know and “Dimmit” and the “Southern Fence Line”.
Purpose
The purpose of this task order is to treat invasive Brazilian peppertree (Schinus terebinthifolius) on two sections of the shoreline and two sections of the golf course (Attachment A) at NAS Corpus Christi, Nueces County, Texas.
Tasks:
The Partner will perform the following tasks in support of this project.
1. Participate in a virtual Kickoff Meeting.
2147-TAMU
a. Prepare Meeting minutes that clarify the planned field work, tentative schedule of tasks and installation access requirements.
2. Brazilian pepper tree eradication in mapped areas (Dimmit and Southern Fence Line)
a. At the appropriate environmental timing, cut stump methodology shall be used to treat Brazilian peppertree in mapped areas with the goal of eradication. Mapped Brazilian peppertree areas total approximately 5.5 acres (Dimmit ~2.4 ac; Southern Fence line ~ 2.5 ac; Golf Course East ~0.25 ac; Golf Course West ~0.25 ac).
3. Submit report of all activities.
a. The report shall include an introduction, methods, results, discussion, and reference section.
i. All habitat management methods shall be thoroughly described.
ii. Relevant maps of habitat management areas shall be provided in report.
b. Submit a draft report to all applicable Navy persons of contact for feedback and input prior to submitting a final revised report.
c. Submit a final report no later than 30 days after receipt of Government comments.
d. Photos and GIS shall be submitted with draft and final report.
Special Instructions
Minutes: The Partner shall maintain documentation of all communications with all Stakeholders throughout this project. Interview, phone discussions, emails, conference calls, and meeting minutes shall be prepared and forwarded, electronically, by the Partner to the PM within one week following completion of the event or as described in the scope of work.
Comment Response: Written Government review comments shall be returned to the Partner within two weeks of submission. The Partner shall provide written response for all comments made concurrent with continuing of the project.
Cost Estimating: All cost estimates shall be prepared using PACES or RS Means. It shall be helpful to the command to be able to see breakout costs in the report for different elements.
Provide costs in the report in a tabulated format.
Submittal Standards: Each submittal shall be delivered to NAVFAC SE and designated installation POC’s electronically. Each submittal shall have a cover letter including the partnership number, type and date of the submittal, date that comments are due and a list of all others to whom the submittal was sent.
2147-TAMU
File Transferring: The Partner shall maintain an FTP site or use other approved file transfer system (ex. DoD SAFE) to accommodate the electronic transferring of files. Flash-drives prohibited: Flash-drive usage is not allowed; use DoD Safe (https://safe.apps.mil/) for file transfer to and from government computers.
NAS Corpus Christi Access: Access to NAS CC shall be coordinated primarily with the Installation Natural Resources Manager (NRM), Scott McGuire 361-961-2108, scott.a.mcguire12.civ@us.navy.mil), prior to first arrival at the installation. The process for accessing the installation is as follows:
1. The Cooperator shall provide a list of names to the NRM at least 2 weeks prior to arrival (This does not apply to the Kickoff Meeting visit).
2. The Cooperator shall provide the timeframe for base access to the NRM at least 2 weeks prior to arrival.
3. The NRM shall send a spreadsheet containing the list of names, timeframes, company name, contract number, and government representative contact information to the pass and tag office.
4. The Cooperator shall fill out the attached SECNAV 5512 form (Attachment C) and hand-carry it to the Pass and ID Office on the first day arrival to receive their DBIDS passes.
Herbicide Management: All provider personnel who apply herbicides on the installation shall be commercially-certified by the state in which services are rendered, in the appropriate categories.
Proof of certification shall be provided to the NRM before commencement of work. It shall not be acceptable for uncertified personnel to work under the supervision of a certified person.
Herbicide providers shall record and report all herbicide applications conducted on the installation, including surveillance, non-chemical, and chemical control measures. Reports shall be submitted, at least monthly, using the NAVFAC online pest management reporting system (NOPRS). The NRM will assist in obtaining an account and will provide instructions on how to use the system.
Vehicles used to transport herbicides shall be appropriately marked to identify the business, equipped with a fire extinguisher, a spill containment kit capable of containing any potential pesticide spill, an emergency eye-wash station, at least two gallons of emergency wash water for personal decontamination, and a first aid kit. All pesticides carried on vehicles shall be stored in a locked compartment separate from the cab of the vehicle. Vehicles shall not be left unattended at any time unless properly locked and secured. All vehicles shall be maintained with a clean and orderly appearance, free from herbicide residues or grime buildup. Vehicles shall not be cleaned, washed, or rinsed on Government property.
Photography: Anyone who might take pictures as part of this proposed work would need to https://safe.apps.mil/) mailto:scott.a.mcguire12.civ@us.navy.mil
2147-TAMU
acquire a photo pass from NAS CC.
Protected Species: Work the federally listed flora does not authorize the illegal take of any state or federally listed animal and plant; neither do any Tasks prescribed in this statement of work require the take of any listed species.
Exhibit B Additional Details of Service
Principal Investigator: Mathew Kramm, Ph.D., mathew.kramm@agnet.tamu.edu, (210) 643-9318
Period Start and End Dates: 8 June 2026 – 7 June 2027 (12 months)
Service Name Invasive Species Management at Naval Air Station Corpus Christi, Texas
Quantity 1
Unit of Measure each
Unit Price:
Total Value of Task Order: Deliverable(s)/Deliverable Due
Date(s), Deliverable Units Schedule
Draft and Final Meeting Minutes (teleconferences, site investigations, Interviews, presentations, etc.)
Electronic copy 5-days following meeting
Draft report of Surveys Electronic copy 30 days after completion of survey field work
Task Order Status Report – included monthly with invoices and % complete, include schedule and schedule changes
Electronic copy At least quarterly mailto:mathew.kramm@agnet.tamu.edu
| Specifications/Statement of Work |
| Exhibit B Additional Details of Service |