Minuteman III ICBM, Cable Assembly Spec
Solicitation number
FA820626Q0229
Issued by

About this file

This is a DD Form 1423 Contract Data Requirements List (CDRL) for contract FD20202600229 issued by the United States Air Force's 414 SCMS (Sustainment Center of Expertise for Munitions and Sensors). The CDRL specifies a single data deliverable requirement for the Cable Reel Assembly, W11 (Part Number 33307-40005-10), with NIIN 014659869. The required data item is a First Article Test/Inspection Procedures and Report (FAT/IPR) with Data Item Number A002, based on the authority document DI-NDTI-82326.

The contractor must deliver the FAT/IPR no later than 45 calendar days after the test and inspection event, with the government retaining 90 calendar days to review and provide comments. The final report must be submitted no later than 14 calendar days following receipt of government comments. The report must demonstrate that the Cable Reel Assembly meets all requirements specified in drawing 33307-40005, including all applicable engineering orders and parts lists. Additional requirements include listing all dimensions and tolerances in parallel columns with actual inspection readings and certifying all material processing and finish requirements. The document carries Distribution Statement D classification (restricted to Department of Defense and U.S. DoD contractors only) with export control restrictions under the Arms Export Control Act and Export Control Reform Act. Submissions must be delivered in PDF and native format (Excel or Word) via email to Alfredo Armendáriz (Mechanical Engineer) at alfredo.armendariz.1@us.af.mil and Eric Ellington (Logistics Management Specialist) at eric.ellington.2@us.af.mil. The estimated price for this data item is $0.00, classified under the NSP price group.

View the file

Other files

File Type Posted
Transportation.pdf PDF
Packaging Requirement.pdf PDF
Solicitation FA8206-26-Q-0229.pdf PDF
SOW Packaging.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

CUI

CUI Controlled by: [Name of Office] CUI Category: (List category or categories of CUI) Distribution/Dissemination Control:

POC: [Phone or email address]

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

NIIN: 014659869

E. CONTRACT/PR NO.

FD20202600229

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

First Article Test/Inspection Procedures and Report (FAT/IPR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-82326

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Changes to addressees, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.

This CDRL is for the Cable Reel Assembly, W11 (P/N 33307-40005-10).

BLOCK 4:

Test report shall show the item meets requirements in drawing 33307-40005 (Cable Reel Assembly, W11), including applicable engineering orders (EOs) and parts lists.

The following items are added to the requirements of DI-NDTI-82326, Section 3.12:

(c) All dimensions and tolerances specified in the drawings shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

(d) Material processing and finish requirements utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements.

BLOCK 9:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only; CTI, and Export Controlled; [Specify Date]. Other requests for this document must be referred to MMIII Program Office, Hill AFB 84056.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCKS 10, 11, 12, & 13:

The contractor shall deliver the FAT/IPR NLT 45 calendar days after the test and inspection event. The government shall have 90 calendar days to review and provide comments. The contractor shall deliver the final copy NLT 14 calendar days following the receipt of government comments.

BLOCK 14:

Document submission shall be delivered in PDF and native format (Excel or Word) via email. Email submission shall be made to the following persons:

Alfredo Armendáriz - Mechanical Engineer, 414 SCMS - alfredo.armendariz.1@us.af.mil Eric Ellington - Logistics Management Specialist, 414 SCMS - eric.ellington.2@us.af.mil

Block 16 1 1

15.TOTAL 1 1

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

0.00

G. PREPARED BY

Alfredo Armendáriz

H. SIGNED ON 20251125 I. APPROVED BY

Skylar Hatch

J. SIGNATURE

ARMENDARIZ.AL

FREDO.1537550470

Digitally signed by

ARMENDARIZ.ALFREDO.15375504

Date: 2025.11.25 09:52:51 -07'00'

HATCH.SKYLAR

.L.1538483180

Digitally signed by

HATCH.SKYLAR.L.1538483180

Date: 2025.11.28 08:22:55 -07'00'

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024 Page 2 of 2

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.