This is a Performance Work Statement (PWS) for professional construction management support services to be provided to the Bureau of Reclamation's California Great Basin Region.

The PWS requires contractor provision of eight personnel across three labor categories: two Materials Engineering Testing (MET) Level III technicians, three Civil Construction Inspectors (CI) Level IV, and three Construction Management Services (CMS) Level IV professionals. The services will support ongoing and future infrastructure projects including the Arroyo Canal Fish Screen and Sack Dam Bypass Project near Dos Palos, CA; B.F. Sisk Dam Safety and Reservoir Expansion Projects near Santa Nella, CA; and the Trinity River Fish Hatchery Modernization Design Build Project near Lewiston, CA. Work will be performed in the California-Great Basin Region primarily throughout California from Redding to the San Joaquin Valley. The base period of performance is 12 months from award with an option to extend up to 12 additional months, with an anticipated level of effort of 2,500 hours per year per position. This is a labor-hour task order with reimbursement based on actual hours worked, submitted weekly and verified by Reclamation representatives. The typical work week is 40-50 hours with potential for up to 12-hour days and weekend work when required. Personnel must have high school diplomas minimum, with 10+ years of construction management and inspection experience for CI and CMS positions, and 5+ years for MET positions. Required certifications include OSHA 30 Hours Construction Training and/or RSHS 32 Hours Training; Base CPR, First Aid, AED, and Bloodborne Pathogens; and valid state-issued driver licenses. Each employee will have a one-month probation period, and replacement must occur within 10 days if expectations are not met. Deliverables include daily/weekly inspection reports with photographs, submittal responses, invoice validation, materials testing reports, meeting documentation, travel authorizations, and required security documentation including background investigations, fingerprinting, non-disclosure agreements, and hold harmless government vehicle releases.

View the file

Other files

File Type Posted
Sources_Sought_Notice-SAM_gov_11_18_2026_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation XXXX

PERFORMANCE WORK STATEMENT (PWS)

Professional Services for Construction Management Support

California Great Basin – Bureau of Reclamation

1. BACKGROUND

Bureau of Reclamation (Reclamation): Reclamation is a water management agency with 600 dams in 17 western states. We are known best for construction of dams, power plants, and canals, including Hoover Dam on the Colorado River, Grand Coulee Dam on the Columbia River, and Folsom Dam on the American River. Reclamation is the largest wholesaler of water in the country and the second largest producer of hydroelectric power in the western US.

Reclamation is organized into six regions (Missouri Basin [MB], Arkansas-Rio Grande- Texas- Gulf [ART], Upper Colorado Basin [UCB], Lower Colorado Basin [LCB], Columbia- Pacific Northwest [CPN], and California-Great Basin [CGB]).

The Bureau of Reclamation requires construction management support services for infrastructure projects throughout the California Great Basin Region. This PWS covers the provision of two Materials Engineering Testing (MET) Level III, three Civil Construction Inspectors (CI) Level IV, and three Construction Management Services (CMS) Level IV personnel to support ongoing and future construction projects, including but not limited to Arroyo Canal Fish Screen and Sack Dam Bypass Project, located near Dos Palos CA, B.F. Sisk Dam Safety of Dam and Reservoir Expansion Projects, Located near Santa Nella, CA and the Trinity River Fish Hatchery Modernization Design Build Project, located near Lewiston CA.

1. DEFINITIONS

Construction Contractor (CC) – the contractor performing the work directly related to the construction project the Contractor will be inspecting/monitoring; the construction contractor’s contract is separate from this task order.

Contracting Officer’s Representative (COR) – the individual, designated and authorized in writing by the contracting officer to perform specific technical or administrative functions for the separate construction contract awarded to the construction contractor.

Contracting Officer (CO) – A duly appointed person with the authority to enter into, administer or terminate purchase orders, and to make findings and determinations on behalf of the United States Government. This is the only individual authorized to change the purchase order or any of the requirements stated herein.

Contractor – the contractor to perform the work required for this specific task order. The individual, partnership, company, or corporation responsible for the duties and responsibilities under the task order.

2. Scope for Construction Inspectors

Reclamation has a requirement for three (3) Level IV Construction Inspectors (CI) to serve as the daily “Inspector” overseeing Quality Assurance (QA) and safety oversight responsibilities for the construction project. The purpose of the CI is to report daily construction activities, problems, concerns, impacts, finished work/tasks, etc. to the COR/Program Manager (PM) on this construction contract

The CI role shall have no contractual authority to direct the construction contractor’s performance of the work unless potential loss of life (safety) may occur from the contractor’s actions. The CI shall become familiar with specifications, drawings, approved submittals, referenced standards, environmental documents, and other related contractual documents. The CI shall be familiar with OSHA and Reclamation Safety and Health Standards (RSHS) and the difference between the two guiding safety standards for this construction.

The CI shall perform the following QA oversight activities:

• Observe contractor’s daily operations to ensure compliance with specifications, drawings, standards, and environmental requirements.

• Ensure Contractor’s safety compliance with OSHA and RSHS requirements:

o Other safety considerations may include the following:

Contractor’s employees affected by high altitude.

Public and Government personnel working or access construction site.

Wildlife Impacts from the weather such as cold, heat, rain, snow, lightning, high runoff in streams/rivers/channels, etc.

• Observe contractor’s methods and practices for complying with environmental requirements.

• Observe contractor’s methods to ensure diversion and care of stormwater and other waters of the state during construction activities.

• Observe contractor's Cast-in-Place (CIP) concrete work which includes subgrade preparation, forms, reinforcement, structural dimensions, and placement which covers delivery times/schedules, temperature, slump, air, method of placement, finishing, cold weather protection, curing, and Quality Control (QC) testing of CIP concrete.

• Observe contractor’s earthwork which includes excavation, stockpiling, hauling, placement of backfill, compaction, QC testing of compacted materials, and final grading.

• Observe contractor’s placement of gravel bedding and riprap.

• Observe contractor’s re-seeding activities.

• Measure and record in Quantity Assurance Site Report (QASR) installed materials, supplies, and quantities.

• Record in QASR weekly use of construction water in either truck (contractor’s water truck or trailer) loads or gallons taken from upstream of Heron reservoir.

The following tasks shall be performed:

The following tasks will be performed by the CI. These tasks may require documentation and become a deliverable as defined in Section “11.0 Deliverables” to provide the Government adequate level of QA documentation for this construction project.

2.1 CI shall attend the construction contractor’s weekly “toolbox” meeting, if required participate in the conversations.

2.2 CI shall attend the monthly Joint Safety Policy Meeting (JSPM), if required participate in the conversations.

2.3 CI shall document and record information related to all accidents and/or near misses during the Period of Performance (PoP). If required, actively participate in conversations, discussions, and assist with the Government’s investigations of an accident and/or near misses.

2.4 CI shall document all safety concerns, accidents, near misses, and other related activities in the daily

QASR.

2.5 CI shall document in the QASR direction provided by Government’s (CO, COR/PM, Field Division, Manager (CFD), & Technical Expert (TE)) representatives to the construction contractor that occur onsite.

2.6 CI shall document all conversations between the construction contractor, public, or other visitors as related to construction activities in the QASR daily.

2.7 CI shall provide a written summary of construction activities in the QASR daily. The QASR shall include an accounting of contractor’s and subcontractor’s labor, equipment, and supplies/materials used throughout the day.

2.8 CI shall provide a minimum of two photographs per day, showing prominent construction activities that occurred during the day. Photographs shall be included with the QASR and meet the following requirements.

Each photograph shall be captioned with the following information:

• Date and time (nearest hour) photo was taken

• Name of person who took the photograph

• Contract number and title

• If work is being documented, provide if the Contractor or Subcontractor performed the work or tasks

• A brief narrative describing what is being illustrated on the photograph and include orientation such as station, feature, direction like looking west, etc.

• Photographs shall meet the Reclamtion digital standards:

3. PERSONNEL QUALIFICATIONS

The tasks listed above require the candidate(s) be qualified in civil construction inspection.

Contractor shall provide candidate(s) proficient in civil construction methods, processes, and techniques having the following abilities:

3.1 Proficient in Microsoft Office with a focus on Word and Excel, eMail (Outlook, Google Mail, etc.).

3.2 Proficient in OSHA and RSHS regulations and the differences between the two safety requirements. RSHS Proficiency may occur during onboarding process.

3.3 Understands crane safety and use of preplanning for critical lifts.

3.4 Proficient in CIP concrete activities such as formwork, scaffolding, reinforcement, methods of placement and finishing, cold weather protection, curing, and documenting Contractor’s QC testing of concrete placements. Experience with placement of CLSM.

3.5 Proficient with earthwork activities such as excavating, stockpiling, hauling, placement, compaction, and Contractor’s QC testing of earthen materials.

3.6 Understands industry and Government best management practices for Diversion and Care of river/waterways/channels, and removal of water from construction excavations.

3.7 Understands industry and Government best management practices for demolition of CMPs and existing road crossings.

3.8 Understands industry and Government best management practices for removal of vegetation (trees, brushes, etc.) from construction areas.

3.9 Proficient in communication of ideals, technical subjects, concerns, and ability to provide potential solutions.

3.10 Proactive, works independently, engages, and actively participate in teams, understand Reclamation’s specifications and drawings, understands and follows industry standards, attentive listener, and able to comply written documentation that is clear and precise.

3.11 Proficient with time management and facilitates adhering to schedules.

3.12 High school diploma, minimum. With more than 10 years of experience in construction management and inspection as an owner’s representative

3.13 The Contractor is responsible for all training for its employees, except when training can only be provided by Reclamation.

3.14 The contractor shall sign a “hold harmless” release for any training provided by the government.

3.15 OSHA 30 Hours Construction Training and/or RSHS 32 Hours Training.

3.16 Base CPR, First Aid, AED, and Bloodborne Pathogens (BBP).

3.17 Optional, OSHA’s Hazard Communication 1.5 Hours, OSHA’s Confined Space 8 Hours, OSHA’s Hearing Conservation, and 24-Hour Fall Protection & Prevention.

3.18 Valid state issued driver license. A Government vehicle is expected to be available for use during working hours.

4. Scope for Construction Management Services

Reclamation has a need for three (3) Construction Managers (CM) to perform CMS duties and assist with project workload needs. The Contractor shall provide assistance to Reclamation personnel during the construction phase of the contract, through the completion of construction. The Contractor will provide support to the Regional Construction Office (RCO) Office Engineering (OE) and Field Engineer (FE) Divisions.

4.1 Review modifications including construction plans, specifications, quantity estimates, and government construction schedules during the construction process and check for compliance with Reclamation engineering standards and procedures. Comments shall be provided in writing to Reclamation’s COR.

4.2 Assist the COR in all aspects related to construction contract administration, including contractor submittal review and drafting responses and reports.

4.3 Conduct or attend meetings to discuss construction related problems and document attendance. Provide meeting notes and document action items for Reclamation’s COR.

4.4 Construction Coordination Meetings: These meetings generally occur every week, internally, and with the CC for approximately one (1) hour each throughout the duration of construction to review construction contract progress and identify any problems or issues that may impede contract performance.

4.5 Construction Problem Resolution Meetings: During construction, it is anticipated that problems will occur that require the Contractor to participate in ad hoc construction problem resolution meetings to provide assistance in resolving the construction problems.

4.6 The Contractor will assist Reclamation office and field staff regarding quality assurance, quality control, and safety measures for ensuring construction is performed in accordance with contract specifications, drawings, the CC’s safety and health plan, and the Reclamation Safety and Health Standards (RSHS).

4.7 The Contractor will provide assistance to the COR regarding daily inspection reports;

safety issues identified; and labor, material and equipment utilized and report significant discussions held with CC personnel regarding contractual issues or safety concerns.

4.8 Contractor shall immediately notify the COR, followed by a written report submitted to within four (4) business hours, if it is determined the work performed is not in compliance with the specifications and drawings for the project.

4.9 Review of technical documentation and reports provided to the CC by Reclamation.

4.10 Report potential construction problems and provide assistance to the COR to avoid contract delays.

4.11 Provide assistance to the COR on resolutions for issues and questions resulting from inspection, quality control, material testing, safety, and technical consideration of contractor operations, methods, procedures, operated equipment, etc.

4.12 Provide assistance to the COR regarding the CC technical documentation and correspondence.

4.13 Review CC’s schedules and construction summary and voucher to verify and confirm work progress to the COR. The Contractor shall report any discrepancies to the COR.

4.14 The Contractor shall provide assistance to the COR regarding updates and questions about construction activities from project stakeholders, meeting coordination, outreach, or notifications.

5. PERSONNEL QUALIFICATIONS

Qualifications must include:

The CM must demonstrate extensive contract management and construction inspection experience totaling a minimum of ten (10) years.

5.1 The CM must be able to demonstrate relevant experience in the following areas within the last ten (10) years:

5.1.1 Skill at a professional level reading and interpreting engineering specifications, drawings and contract documents.

5.1.2 Experience reviewing design drawings, specifications, construction schedules, and concrete documents.

5.1.3 Experience reviewing construction contractor submittals.

5.1.4 Experience overseeing quality control materials testing for concrete and embankment structures.

5.1.5 Knowledge of engineering concepts, principles, and practices with in-depth experience and knowledge of construction industry standards demonstrated by the ability to plan, manage and monitor construction inspection activities and to identify and resolve complex and interrelated construction problems and issues.

5.1.6 Understanding of activities to assist with the construction management of major construction contracts and monitor all work for technical and contractual compliance.

5.1.7 Knowledge of Reclamation safety practices including experience with the implementation of Reclamation Safety and Health Standards, OSHA, and Reclamation Occupational Health Handbook on major construction projects.

5.1.8 Experience training entry level field staff on standard construction practices including quality control and assurance monitoring and safety procedures.

5.1.9 Skill at a professional level in written communications to provide assistance with correspondence and technical reports and to provide assistance on clear and concise supporting data.

5.1.10 Proficient computer skills including Microsoft Office (Word, Excel) and email. Ability to communicate proficiently both orally and in writing.

5.1.11 Mental and physical ability to work the required hours, in ambient weather conditions, and mobilize around construction site.

5.1.12 Demonstrates proficiency on construction projects at managing time efficiently, working independently, and adhering to schedule.

6. SCOPE FOR MATERIAL ENGINEERING TESTING SUPPORT

Reclamation has need for up to (2) Materials Engineering Testing Technicians (MET) to sample and test earthwork and concrete materials for the construction of heavy civil works and document sampling and testing activities in written reports.

6.1 MET will be on-site as ordered when CC is performing construction tasks to sample and test earthwork and concrete materials. The MET will serve as Reclamation’s on-site MET but has no contractual authority to direct the CC’s performance of the work.

6.2 MET shall become familiar with the construction plans and specifications, referenced standards, and approved submittals.

6.3 Document MET activities through construction sampling and testing reports that accurately, concisely, and completely document the MET’s activities.

6.4 Review CC’s test results for accuracy and completeness.

6.5 Attend quality control meetings for preparatory, initial, and follow-up meetings.

6.6 Communicate MET activities to the COR to keep them apprised of sampling and testing activities.

6.7 Participate in weekly coordination meetings between the CC, COR, and construction contract administrators when requested.

6.8 Attend CC safety and environmental awareness meetings and review CC-prepared Job Hazard Analyses (JHAs). Safety meetings shall be documented in the daily report.

6.9 Immediately notify the COR and Field Engineer (FE) of safety issues.

7. PERSONNEL QUALIFICATIONS

Qualifications must include:

7.1 The MET must demonstrate recent construction materials sampling and testing experience totaling a minimum of five (5) years including relevant experience with earthwork and concrete construction.

7.2 Experience with sampling and testing soils and concrete methods.

7.3 Basic knowledge of construction surveying techniques and stake reading.

7.4 Proficient computer skills including Microsoft Office (Word, Excel) and email. Ability to communicate proficiently both orally and in writing.

7.5 Proficient computer skills including Microsoft Office (Word, Excel) and email. Ability to communicate proficiently both orally and in writing.

7.6 Demonstrates proficiency on construction projects at managing time efficiently, working independently and adhering to schedule.

7.7 Mental and physical ability to work the required hours, in ambient weather conditions, and mobilize around construction site, including climbing up to an approximately 40-vertical feet of ladder.

7.8 Demonstrates proficiency on construction projects at managing time efficiently, working independently and adhering to schedule.

Summary Table of Positions

Role Qu ant ity

Key Tasks Minimum Qualifications

MET Level III 2 Materials testing, reporting, compliance 5+ years, certifications CI Level IV 3 Inspection, QA/QC, safety, reporting 10+ years, certifications

CMS Level IV 3 Every aspect of construction management to support OE and FE for owner.

10+ years, software proficiency

8. PLACE AND PERIOD OF PERFORMANCE: Work will be performed in the California- Great Basin Region primarily in California from Redding to the southern part of the San Joaquin Valley

8.1. The anticipated period of performance is a base year of 12 months from the time of award with an option to extend up to 12 additional months; the anticipated level of effort is up to 2,500 hours per year for each position.

8.2. Each contractor appointed employee will have a one-month probation period. If the contractor fails to meet Reclamation’s expectations described in the scope above the Contracting Officer’s Representative (COR) will provide a written description of the deficiencies and provide the report to the CO. The CO will notify the contractor of the need to replace the employee. The contractor shall have 10 days to replace the required labor category. If, at any time, the contractor is not meeting Reclamations expectations described in the scope above the COR will provide a written description of the deficiencies of the to the CO. The CO will notify the contractor of the need to replace the employee and the contractor shall have 10 days to do so.

8.3. This is a LABOR-HOUR task order for reimbursement of actual labor-hours worked.

Timesheets will be submitted to Contracting Officer’s Representative (COR) and verified by the on-site designated Reclamation representative on a weekly basis, with reporting daily to check-in/out with the Resident Engineer, Project Manager or COR.

8.4. The typical work week is 40-50 hours and may be up to 12 hours per day. With weekend work when required.

8.5. The Contractor may be required to provide the following:

8.5.1. Vehicle suitable for use at large construction sites including caution strobe and company identification. A Government vehicle may be provided for use if available.

8.5.2. Personal protective equipment.

8.5.3. Personal computer with network coverage loaded with Microsoft office.

9. GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND MATERIALS (GFM):

9.1. The Government will provide office. and access to applicable government network resources.

9.1.1. The contractor shall not take GFE off the Government designated premises unless authorized by a property pass for a specific period of use, which does not allow personal or unauthorized use. The contractor may be held fiscally responsible in the event of gross negligence, abuse, or loss of GFE.

9.1.2. Government may provide a laptop and all applicable permissions if network access is required.

9.2. The Government will provide disposable supplies including access to printers, paper, and various office supplies when employee is assigned to a Government Facility. Contractor will provide printers and supplies when employee works out of the contractors facilities.

9.3. The contractor shall be on-site daily. For mobilization and demobilization, each trip requires pre-authorization. Travel costs are reimbursed in accordance with FAR 31.205- 46 and the Federal Travel Regulations.

9.4. Government may provide a vehicle for use on site.

10. GOVERNMENT VEHICLES AGREEMENT:

Contract employees may operate a government vehicle if one is available. Before any contractor employee is an occupant or driver in any government vehicle, the contractor employee shall sign and submit a Hold Harmless Government Vehicle Release.

11. SECURITY:

11.1. Contractor employee(s) shall comply with Reclamation security procedures and security training requirements in accordance with Reclamation Clause WBR 1452.237- 80.

11.2. Contractor employees performing work under this task order shall complete fingerprinting at a USA Access center before performing work under this task order.

Reclamation will contact the Contractor employee directly for this appointment.

11.3. Contractor employees performing work under this task order shall be required to complete and successfully pass a background investigation. The background investigation requires submission of Personally Identifiable Information (PII), including full name, social security number, city and state of birth, citizenship status, date of birth, any other names used, contact phone numbers, Selective Service information, military service record, criminal convictions within the past 7 years, firings within the past 5 years, and existing delinquent federal debt.

11.4. The Contractor shall sign a non-disclosure agreement (NDA) prior to performance on this task order. Reclamation has identified specific security sensitivity designations for information related to Reclamation facilities.

12. DELIVERABLES: The following paragraphs and Deliverables Tables below provides a listing of deliverables, the media required, the number of copies, and the recipients.

12.1. (CM) Coordinate and prepare submittal responses including incorporation of technical responses for Construction Office staff, the Regional Engineer, COR, CO, and Technical Service Center Engineers when required by the project contract documents.

12.2. (CM) Validate invoice quantities in coordination with field inspectors to identify official Government quantities acceptance for the period.

12.3. (CM) Maintain a spreadsheet of contractor quantities of materials delivered, batched, wasted, materials requiring testing, and materials that do not meet specification.

Review and compare Government and Contractor quantities and validate quantities monthly and special quantity submittals for invoice validation.

12.4. (CM) Coordinate, consolidate Government comments, and prepare responses to

Requests for Information (RFI), Requests for Change (RFC), Requests for Equitable Adjustment (REA), Requests for Proposals (RFP), Value Engineering Change Proposals (VECP), and other applicable documents as required.

12.5. (CM) Prepare contract modification documentation including quantities, cost estimates, statements of work, technical analysis, pre-negotiation memorandums, and tracking of modifications.

12.6. (CM) Attend and document meetings with the Contractor including the weekly Progress

Meetings, meetings to discuss RFI’s, RFC’s, Schedule, and related work. If the CM is in place prior to start of construction the CM shall participate in Partnering Session, Design Risk Coordination Meetings, Preconstruction Meeting, and the Preconstruction Safety Meeting.

12.7. (CI) Daily Inspection Reports: Provide detailed written daily reports having detailed documentation of field activities through daily written recitation and photographs. Document daily construction inspection to monitor compliance with the specifications, monitor work site for safety, and monitor contractor safety compliance.

Include an accounting of construction contractor equipment and personnel. Significant discussions with construction contractor personnel shall be well documented, as well as any safety issues and resolution of those issues. Include a minimum of two photographs with descriptive file name, photo captioning, and date/time stamp to record visual events/objects pertaining to the day’s activities. Daily report template shall be provided by the COR. Provide reports to COR and or identified Reclamation Staff.

12.8. (CI) Weekly Activity Reports: Provide detailed written weekly reports describing daily activities with progress photos. Include a general overview of construction contractor activities, issues faced and who problems were reported to, and any other pertinent information about the week not captured elsewhere. The COR may request a weekly recap of the Daily Inspection Report to accompany the above information.

Provide reports to COR and or identified Reclamation Staff.

12.9. Travel Authorization: Submit travel request to PM, Contracting Officer (CO), COR or identified Reclamation Staff prior to travel.

12.10. Non-Disclosure Statement: The Contractor employee shall be required to sign a Non- Disclosure Statement and provide it to the COR.

12.11. Hold Harmless Government Vehicle Release: The Contractor employee is required to sign a Hold Harmless Government Vehicle Release Statement and submit it to the PM, Contracting Officer (CO), COR, or identified Reclamation Staff.

12.12. Deliverables Table:

LABOR

CATEGORY

DELIVERABLE DUE DELIVER TO

CM Coordinate and prepare submittal responses.

Upon completion with 98% of responses completed within the required submittal completion period.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format to identified Reclamation Staff Members

CM Validate invoice quantities and review invoices.

Monthly and when submitted under special circumstances within the period prescribed in the applicable contract.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format to identified Reclamation Staff Members

CM Review, maintain and validate spreadsheet of contractor quantities of materials delivered, batched, wasted, materials requiring testing, and materials that do not meet specification.

Monthly (Every 30 days) and as required by the Resident Engineer. Copies to CO due with invoices.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format. PM: 1 copy in electronic format to identified Reclamation Staff Members

CM Coordinate, consolidate Government comments, and prepare responses to RFI’s, RFC’s, VECP’s, and other documents as required.

Upon completion with 98% of responses completed within the applicable contracts required completion period.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format to identified Reclamation Staff Members.

CM Prepare Contract Modification Documentation, Upon completion with 98% of responses completed within the applicable contracts required completion period.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format. 1 copy in electronic format to identified

Reclamation Staff Members.

CM Attend and document the contractor’s weekly Progress Meetings.

Close of business the following workday.

Copies to CO due with invoices.

PM: 1 copy in electronic format.

CO/COR: 1 copy in electronic format. 1 copy in electronic format to identified Reclamation Staff Members.

CI Daily, Weekly, and Special Inspection Reports, Including Photos. (When performing inspection duties)

Close of business the following workday. In Reclamation Daily, Weekly, and Special Inspection Report formats.

PM: 1 copy in electronic format.

CO/COR: 1 copy in electronic format. 1 copy in electronic format to identified Reclamation Staff Members.

MET,CM

and CI

Provide a weekly report.

To accompany the request for timesheet verification by the on-site Reclamation designated representative.

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format. 1 copy in electronic format to identified Reclamation Staff Members.

MET Daily Reports and Monthly summary of all testing activities.

Daily- Close business the following workday. In Reclamation Testing Report formats. Monthly- By end of first business day following the month or as required by the COR

PM: 1 copy in electronic format CO/COR: 1 copy in electronic format. 1 copy in electronic format to identified Reclamation Staff Members.

MET,CM

and CI

Travel Authorization

Approved prior to travel. Electronic copy to

PM, COR,

COR/CO

1 hard copy to PM.

1 copy in electronic format to identified Reclamation Staff Members.

MET,CM

and CI

Non-Disclosure Statement

Within 5 days after on boarding PM: 1 copy in electronic format CO/COR: 1 copy in electronic format.

MET,CM

and CI.

Hold Harmless Government Vehicle Release

Before being an occupant or driver in any government vehicle

Electronic copy to

PM, COR,

COR/CO

1 hard copy to PM

13. PERFORMANCE REQUIREMENTS:

LABOR

CATEGORY

PERFORMANCE

OBJECTIVE

METHOD OF

OBSERVATION

PERFORMANCE

GOAL

All Be on-site, on time, and able to perform the required work.

Inspection Reports Delivered on Time.

95% Compliance.

CI, MET Reports are clear, complete, delivered on time, and require rare-to-no corrections.

Periodic Staff Observation and Inspection.

Minimal mistakes and need for corrections in reports after 2 weeks.

All Attendance. Review of Reports and Periodic Staff Observation and Inspection

Provides ample notice and makes arrangements to ensure work responsibilities are covered.

All Adaptability - Ability to Adjust to Changes.

Periodic Staff Observation and Inspection.

Demonstrates the Ability to Quickly Adjust to Changes in the Work and Contractor Activities

All Collaboration – Ability to Work with Coworkers and Contractors.

Periodic Staff Observation and Inspection.

Maintains a Professional Presence in Complex and Changing Work Conditions.

All Tools – Ability to use Tools for Inspection and Software for Report Preparation.

Periodic Staff Observation and Inspection.

Demonstrates Competence Through Report Completeness.

14.0. IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering government telephones, or working in other situations where their contractor status is not obvious to third parties, they shall make their status known to avoid creating an impression that they are government employees.

END OF TASK ORDER

PERFORMANCE WORK STATEMENT (PWS)
1. BACKGROUND
1. DEFINITIONS
2. Scope for Construction Inspectors
The following tasks shall be performed:
3. PERSONNEL QUALIFICATIONS
4. Scope for Construction Management Services
The following tasks shall be performed:
5. PERSONNEL QUALIFICATIONS
6. SCOPE FOR MATERIAL ENGINEERING TESTING SUPPORT
7. PERSONNEL QUALIFICATIONS
Summary Table of Positions
8. PLACE AND PERIOD OF PERFORMANCE: Work will be performed in the California-Great Basin Region primarily in California from Redding to the southern part of the San Joaquin Valley
8.1. The anticipated period of performance is a base year of 12 months from the time of award with an option to extend up to 12 additional months; the anticipated level of effort is up to 2,500 hours per year for each position.
8.2. Each contractor appointed employee will have a one-month probation period. If the contractor fails to meet Reclamation’s expectations described in the scope above the Contracting Officer’s Representative (COR) will provide a written description ...
8.3. This is a LABOR-HOUR task order for reimbursement of actual labor-hours worked. Timesheets will be submitted to Contracting Officer’s Representative (COR) and verified by the on-site designated Reclamation representative on a weekly basis, with ...
8.4. The typical work week is 40-50 hours and may be up to 12 hours per day. With weekend work when required.
8.5. The Contractor may be required to provide the following:
8.5.1. Vehicle suitable for use at large construction sites including caution strobe and company identification. A Government vehicle may be provided for use if available.
8.5.2. Personal protective equipment.
8.5.3. Personal computer with network coverage loaded with Microsoft office.
9. GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND MATERIALS (GFM):
9.1. The Government will provide office. and access to applicable government network resources.
9.1.1. The contractor shall not take GFE off the Government designated premises unless authorized by a property pass for a specific period of use, which does not allow personal or unauthorized use. The contractor may be held fiscally responsible in t...
9.1.2. Government may provide a laptop and all applicable permissions if network access is required.
9.2. The Government will provide disposable supplies including access to printers, paper, and various office supplies when employee is assigned to a Government Facility. Contractor will provide printers and supplies when employee works out of the con...
9.3. The contractor shall be on-site daily. For mobilization and demobilization, each trip requires pre-authorization. Travel costs are reimbursed in accordance with FAR 31.205-46 and the Federal Travel Regulations.
9.4. Government may provide a vehicle for use on site.
10. GOVERNMENT VEHICLES AGREEMENT:
Contract employees may operate a government vehicle if one is available. Before any contractor employee is an occupant or driver in any government vehicle, the contractor employee shall sign and submit a Hold Harmless Government Vehicle Release.
11. SECURITY:
11.1. Contractor employee(s) shall comply with Reclamation security procedures and security training requirements in accordance with Reclamation Clause WBR 1452.237-80.
11.2. Contractor employees performing work under this task order shall complete fingerprinting at a USA Access center before performing work under this task order. Reclamation will contact the Contractor employee directly for this appointment.
11.3. Contractor employees performing work under this task order shall be required to complete and successfully pass a background investigation. The background investigation requires submission of Personally Identifiable Information (PII), including f...
11.4. The Contractor shall sign a non-disclosure agreement (NDA) prior to performance on this task order. Reclamation has identified specific security sensitivity designations for information related to Reclamation facilities.
12. DELIVERABLES: The following paragraphs and Deliverables Tables below provides a listing of deliverables, the media required, the number of copies, and the recipients.
14.0. IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering government telephones, or working in other situations where their contractor status is not ...