Sol_140RR027Q0023_Amd_0004.pdf

PDF 202 KB Posted

Attached to
Northern California Area Office (NCAO) Low Bed Tra
Solicitation number
140RR027Q0023
Issued by
Not on record

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Northern California Area Office (NCAO) under the Bureau of Reclamation. The amendment is numbered 0004, effective November 16, 2026, and applies to solicitation 140RR027Q0023, dated October 28, 2026. The contracting activity is CGB-Contracting Activity, located at 2800 Cottage Way, Room E-1815, Sacramento, CA 95825-1898.

The amendment addresses a single question and answer regarding the procurement of a Low Bed Trailer with Gooseneck Attachment. A contractor questioned whether the Government would accept trailers equipped with 25,000-lb-rated axle beams that, due to installed brake components, have a stamped Gross Axle Weight Rating (GAWR) of 20,000 lbs. each, rather than the specified 25,000 lbs. each. The Government's response clarifies that alternative configurations will not be considered, meaning the completed axle assemblies must meet the minimum 25,000 lbs. GAWR requirement as originally specified. The submission due date remains unchanged, and contractors must acknowledge this amendment by submitting a signed copy of the Standard Form 30 along with their quote.

View the file

Other files

File Type Posted
Sol_140RR027Q0023_Amd_0003.pdf PDF
Sol_140RR027Q0023_Amd_0002.pdf PDF
C5_5__140RR027Q0023_Updated_0001.pdf PDF
Sol_140RR027Q0023_Amd_0001.pdf PDF
Sol_140RR027Q0023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

See continuation page

CGB-Contracting Activity 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898

RR2

140RR027Q0023

11/16/2026

10/28/2026

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140RR027Q0023/0004

The solicitation cited in block 9A above, Northern California Area Office (NCAO) Low Bed

Trailer with Gooseneck Attachment

Purpose: The purpose of this amendment is to answer the question received:

Question 1: The specifications state a requirement for two (2) axles rated at 25,000 lbs. each. Our proposed manufacturer offers a trailer equipped with 25,000-lb-rated axle beams; however, due to the installed brake components, the completed axle assemblies will have a stamped Gross Axle Weight Rating (GAWR) of 20,000 lbs. each. The manufacturer indicates that this configuration satisfies the 25,000-lb requirement based on the rating of the axle beams.

Could you please confirm whether the Government would accept this configuration, or whether the requirement specifically calls for each completed axle assembly to have a minimum GAWR of 25,000 lbs.?

Answer 1: Alternative configurations will not be considered.

The submission due date remains unchanged.

The contractors must acknowledge this amendment by submitting a signed copy of the Standard

Form (SF)-30 along with the quote.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .