This document is an amendment to a solicitation for a federal contract opportunity. The key details are:

This amendment provides follow-up answers to questions from a site visit and extends the solicitation due date from June 28, 2024 to July 8, 2024. The requirement is for a firm fixed price contract for lab control system upgrades, including lab valves and actuators, for the Bureau of Reclamation Hydraulics Investigations and Laboratory. The amendment clarifies details such as valve and actuator sizing, the number of powered vs. non-powered valves, and requirements for uninterruptible power supply, valve opening/closing speed, and flow control valve specifications. It also provides photos of motor nameplates and flow rate information for the venturi control valves. Contractors are required to bid on the full scope of work - partial bids will not be accepted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R8124Q0035 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

R81

Denver CO 80225 Bldg 67 - Denver Federal Center Denver Office - AOB Bureau of Reclamation

05/22/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/22/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment 0002 is to provide the following:

A. Follow-up answers to questions from the site visit that was conducted on Thursday, June

20, 2024, from 1:00 pm. - 3:00 pm. MST.

B. Extend the solicitation due date from June 28, 2024 to July 8, 2024 by 5:00 PM Eastern.

THIS IS A FIRM FIXED PRICE REQUIREMENT FOR LAB CONTROL SYSTEM UPGRADES; TO INCLUDE LAB

VALVES AND ACTUATORS FOR THE BUREAU OF RCLAMATION HYDRAULICS INVESTIGATIONS AND LABORATORY

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Robert Shedrick

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140R8124Q0035 - Amend 0002

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 8CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R8124Q0035/0002

SERVICES

SEE ATTACHED STATEMENT OF WORK FOR FULL DETAILS.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Questions

1. Are the dimensions of the valves and actuators the need replacement (listed in Table 1) accurate?

Isolation Valve A is not correct. It is a 14” valve, not a 12” valve.

Valve Type: Isolation Location: North – A Size (in): 14 inch Existing Valve Type: Gate Valve Existing Flange to Flange Distance: 15 inch New Valve Type: Gate Valve Flow Control: NO

2. Do the Valve Operator Disconnect Cabinets need to be replaced?

No. There are valve operator disconnect cabinets on the east and west side of the lab (shown below). These do not need to be replaced.

Figure 1. The valve operator disconnect cabinet on the east side does not need to be replaced under this contract.

140R8124Q0035 - Amend 0002 Page 3 of 8

Figure 2. The valve operator disconnect cabinet on the west side does not need to be replaced under this contract.

3. Clarification was requested on the number of powered and non-powered valves in the north and south pump pits.

In the north pump pit, there are 4 motorized valves labeled as Valve A, B, C, D as shown in Table 1 of the statement of work. There are 3 other valves in the pump pit, but they are manually operated and will not be replaced as part of this scope of work. In the south pump pits, there are 3 motorized valves labeled as Valve J, K, L as shown in Table 1 of the statement of work.

4. Is an uninterruptible power supply for 72 hours really needed?

The goal is to not lose control system programming if the power goes out. If this is already included in the proposed system, then an UPS of 72 hour is not required.

5. Can a company submit for only part of the project (e.g., valves and actuators only)?

No. The bid must be complete with all elements in the solicitation. Subcontractors may be required to meet all required criteria in the statement of work.

6. Should globe valves be specified instead of ball valves?

The flow control valves on the venturis will be replaced with ball valves. We require flow capacity and flow control. Although globe valves have better flow control, we expect there would be too much head loss at the valves. Please proceed with ball valves.

7. HDMI screen

The HDMI screen does not need to be exact same size as the existing screen. The HDMI screens just need to be functional and fit in the available control panel space.

8. Has BOR considered purchasing spares parts?

140R8124Q0035 - Amend 0002 Page 4 of 8

Spare parts have not been requested in the solicitation. Venturi actuators should be sized as appropriate for each venturi and do not need to be interchangeable to provide redundancy.

9. Can we get photos of the motor name plates?

Figure 3. NE motor name plate (photo from one angle).

Figure 4. NE motor name plate (photo from a different angle).

Figure 5. NW motor name plate.

140R8124Q0035 - Amend 0002 Page 5 of 8

Figure 6. SE motor name plate.

Figure 7. SW motor name plate.

10. What is the required opening/closing speed for full open/close?

All valves should fully open/close in 30-60 seconds.

11. How do we envision staging installation?

The hydraulics lab would like to bring down only one quadrant at a time if possible to maintain functionality in the lab. If half of the lab (north/south) needs to be out of service, we will be able to accommodate this, but will need to work closely with the contractor on timing.

12. Should burned out lights on control panel indicators be replaced?

140R8124Q0035 - Amend 0002 Page 6 of 8

It appears that the signal is not being received from the isolation valves or venturi valves to turn the lights on. A new system should resolve this. However, if it is simply a bulb replacement, then please replace the bulbs. LED lights are not required.

13. What is the flow range for each venturi? What is the maximum pressure?

Control Valves - Sizing Critical Info

Flow Rate(gpm):

Tag #s: Line Size:

Inlet Pressure(psi):

Outlet Pressure (psi):

Media: Temperature: Minimum: Nominal: Maximum:

4” NE 4” 0-50 0-50 Water Ambient (65F) 0 500 700

6” NE 6” 0-50 0-50 Water Ambient (65F) 0 1100 1550

8” NE 8” 0-50 0-50 Water Ambient (65F) 0 2400 3400

12” NE 12” 0-50 0-50 Water Ambient (65F) 0 5800 8200

14” NE 14” 0-50 0-50 Water Ambient (65F) 0 9100 12800

4” SE 4” 0-50 0-50 Water Ambient (65F) 0 500 700

6” SE 6” 0-50 0-50 Water Ambient (65F) 0 1100 1550

8” SE 8” 0-50 0-50 Water Ambient (65F) 0 2400 3400

12” SE 12” 0-50 0-50 Water Ambient (65F) 0 5800 8200

4” SW 4” 0-50 0-50 Water Ambient (65F) 0 500 700

6” SW 6” 0-50 0-50 Water Ambient (65F) 0 1100 1550

8” SW 8” 0-50 0-50 Water Ambient (65F) 0 2400 3400

12” SW 12” 0-50 0-50 Water Ambient (65F) 0 5800 8200

3” NW 3” 0-50 0-50 Water Ambient (65F) 0 225 300

4” NW 4” 0-50 0-50 Water Ambient (65F) 0 500 700

6” NW 6” 0-50 0-50 Water Ambient (65F) 0 1100 1550

8” NW 8” 0-50 0-50 Water Ambient (65F) 0 2400 3400

12” NW 12” 0-50 0-50 Water Ambient (65F) 0 5800 8200

14. How many 14” venturi control valves are there?

The drawing in Figure 1 of the statement of work is correct. There is one 14” flow control valve at the NE venturi. The maximum size of the flow control valves on the NW, SW, and SE sides is 12”.

140R8124Q0035 - Amend 0002 Page 7 of 8