Amendment No. 0018_0018.pdf

PDF 5 MB Posted

Attached to
Protection Relay and Annunciation Replacement
Solicitation number
140R6020R0001
Issued by

View the file

Other files

File Type Posted
Sol_140R6020R0001_Amd_0018.pdf PDF
Amendment No 0017_0017.pdf PDF
Sol_140R6020R0001_Amd_0017.pdf PDF
Sol_140R6020R0001_Amd_0016.pdf PDF
Amendment No. 0016_0016.pdf PDF
Sol_140R6020R0001_Amd_0015.pdf PDF
Amendment No. 15_0015.pdf PDF
Amendment No 0014.pdf PDF
Sol_140R6020R0001_Amd_0014.pdf PDF
Amendment No. 0013 Extension_0013.pdf PDF
Sol_140R6020R0001_Amd_0013.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6020R0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

03/08/20210018

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/27/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Mount Elbert Protection and Annunciation Systems Replacement, Fryingpan-Arkansas Project, Colorado

Please see the following pages.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Darlene Dillon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. 140R6020R0001 Amendment No. 0018

Description of changes:

1) In Part I – The Schedule, the following specifications are hereby removed in their entirety, and substituted therefor with the attached revised Specifications:

Section B – Price Schedule Section 01 79 20 – Training Section 26 05 04 – Removal of Existing Electrical Equipment Section 26 05 10 – Conductors and Cables Section 26 09 16 – Protections Systems Section 26 09 17 – Annunciation System

2) In Part II – Contract Clauses, remove Section I in its entirety, and substitute therefor with the attached revised Section I.

3) In part III – List of Documents, Exhibits and Other Attachments, remove Section J in its entirety, and substitute therefor with the attached revised Section J.

4) In Part IV – Representations and Instructions, remove Section L in its entirety and substitute therefor with the attached revised Section L.

5) In Part IV – Representations and Instructions, remove Section M in its entirety and substitute therefor with the attached revised Section M.

For convenience, essential changes on the revised solicitation pages are indicated by a vertical line within the margin, whereby the lines or paragraphs are changed from the previous version.

However, all portions of the revised solicitation pages shall apply, whether changes thereon have or have not been indicated.

Acknowledgement: See Block 11 above regarding acknowledgement by offerors to this amendment. The Government requires acknowledgement of this amendment at the place designated for receipt of bids. (Please See Block 19 of the Standard Form 1442).

Receipt of Proposals: The date and hour for receipt of proposals is March 26, 2021 at 3:00 PM (Mountain Daylight Time Zone-Denver Time Zone).

Third Party: If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.

Mount Elbert Powerplant Protection and Annunciation Systems Replacement Fryingpan-Arkansas Project, Colorado Amendment No. 0018

Price Schedule Revised - B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

MOUNT ELBERT POWERPLANT

PROTECTION AND ANNUNCIATION SYSTEMS REPLACEMENT

FRYINGPAN-ARKANSAS PROJECT, COLORADO

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) All three Price Schedules shall be completed in their entirety. Offers for less than all of the Contract Line Item Numbers (CLINs) on Price Schedules A, B and C will be considered nonresponsive and will not be considered further for award.

(2) Price Schedule A represents “Common Work” to be performed regardless of whether a single unit outage or a dual unit outage is later determined to be the most viable alternative.

(3) Price Schedule B represents work performed under a Single Unit Outage.

(4) Price Schedule C represents work performed under a Dual Unit Outage.

(5) The Government will make the initial contract award for Price Schedule A (Common Work). The Government will then incorporate into the contract either Price Schedule B (Single Unit Outage) or Price Schedule C (Dual Unit Outage), but not both, at such time that the availability of a dual unit outage window is known.

(6) For evaluation purposes, the Government will calculate a “Total Evaluated Price” for each offeror. The Total Evaluated Price will be the sum of Price Schedules A + B + C and will serve as the price component in any tradeoffs performed. The resultant contract price will eventually be the total of (Price Schedule A + Price Schedule B) or (Price Schedule A + Price Schedule C).

(b) Offers are subject to the terms and conditions of this solicitation.

(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLINs B-1 and C-1.

(d) Definitions:

(1) CLIN – Contract Line Item Number.

Revised - B - 2

PRICE SCHEDULE A - COMMON WORK

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

A-1 Deleted.

A-2 Deleted.

A-3 Deleted.

A-4 26 05 04 Development of Pre- Demolition As-Built Drawings

For the lump sum of $

A-5 Deleted.

A-6 Deleted.

A-7 26 09 16 Design, Furnish, Install, and Test New Protection Systems

For the lump sum of $

A-8 26 09 16 Design, Furnish, Install, and Test the Protection System’s Network

For the lump sum of $

A-9 26 09 16 Spare Parts for Protection Systems

For the lump sum of $

A-10 Deleted.

A-11 Deleted.

A-12 26 09 17 Design, Furnish, Install and Test Annunciation System and Protection System Network

For the lump sum of $

Revised - B - 3

PRICE SCHEDULE A - COMMON WORK

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

A-13 26 09 17 Design, Furnish, Install and Test New Annunciation System

For the lump sum of $

A-14 26 09 17 Spare Parts for Annunciation System

TOTAL FOR PRICE SCHEDULE A $_________________

PRICE SCHEDULE B - SINGLE UNIT OUTAGE

and Unit

Unit Price

Amount

B-1 WBR

1452.232

-81

Mobilization and Preparatory Work (Single Unit Unit Outage)

For the lump sum of $

B-2 01 79 20 Training For the lump sum of $

B-3 26 05 04 Removal of Existing Electrical Equipment

For the lump sum of $

B-4 Deleted.

B-5 26 05 10 Conductors and Cables For the lump sum of $

B-6 26 09 16 Remove and Dispose of Existing Protection Systems

For the lump sum of $

B-7 Deleted.

B-8 Deleted.

B-9 Deleted.

B-10 26 09 17 Remove and Dispose of Existing Annunciation System

For the lump sum of $

B-11 26 09 17 Factory Test New Annunciation System

Revised - B - 4

PRICE SCHEDULE B - SINGLE UNIT OUTAGE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

B-12 Deleted.

B-13 Deleted.

B-14 Deleted.

TOTAL FOR PRICE SCHEDULE B $_________________

PRICE SCHEDULE C - DUAL UNIT OUTAGE

and Unit

Unit Price

Amount

C-1 WBR

1452.232

-81

Mobilization and Preparatory Work (Dual Unit Outage)

For the lump sum of $

C-2 2 01 79 20 Training For the lump sum of $

C-3 26 05 04 Removal of Existing Electrical Equipment

For the lump sum of $

C-4 26 05 10 Conductors and Cables For the lump sum of $

C-5 26 09 16 Remove and Dispose of Existing Protection Systems

For the lump sum of $

C-6 26 09 17 Remove and Dispose of Existing Annunciation System

For the lump sum of $

C-7 26 09 17 Factory Test New Annunciation System

TOTAL FOR PRICE SCHEDULE C $_________________

TOTAL EVALUATED PRICE = PRICE SCHEDULES A + B + C = $_________________

Note: The Total Evaluated Price is used for evaluation purposes only. The resultant contract will either

Revised - B - 5 be the sum of (Price Schedule A + Price Schedule B) or (Price Schedule A + Price Schedule C) once the dual unit outage availability window is known.

END OF SUPPLIES OR SERVICES AND PRICES

Revised - B - 6

This page intentionally left blank.

Training

Revised 01 79 20 - 1

SECTION 01 79 20

TRAINING

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Training:

1. Payment: Lump-sum prices offered in Price Schedule B and Price Schedule C.

a. Includes two multi-session courses to accommodate Government employees who are working on alternate shifts.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00- Submittals.

B. RSN 01 79 20-1, Instructor’s Qualifications.

C. RSN 01 79 20-2, Training Outline:

1. Syllabus and Outline.

D. RSN 01 79 20-3, Training Materials:

1. Schedule.

2. Presentation, including handouts, in .pdf format.

E. RSN 01 79 20-4, Training Documentation:

1. Provide one electronic version on CD-ROM or DVD of the following materials:

a. Presentation, including handouts, in pdf format.

b. Digital video recording of class.

1.03 QUALIFICATIONS

A. Training Staff:

1. Competent with and knowledge of the specific equipment that training is provided for, and the material presented.

a. Minimum 7 years of experience on equipment of similar type and function as the equipment.

b. Minimum 2 years of experience on the specific type and models of equipment.

2. Fluent in English.

Revised 01 79 20 - 2

3. Instructor qualifications subject to review and approval by the COR.

1.04 COORDINATION

A. Coordinate instruction schedule and location with Government. Training shall be accomplished Mondays through Thursdays. Fridays, Saturdays, Sundays, and Federal Holidays shall be excluded from potential training days.

B. Conduct training during normal working hours until conclusion of training course.

1.05 TRAINING COURSE REQUIREMENTS

A. Operator Training

1. Attendees:

a. Provide a multi-session course which addresses needs of the following group:

1) Operations and Maintenance.

2. Training provided on minimum following topics, content shall be plant and equipment specific:

a. How to use and operate components.

b. Understanding equipment feedback.

c. Navigation of equipment user interface.

d. Overview of how systems interact and function in overall operation of the plant.

e. Facility annunciation with completed Project modifications. Includes following.

1) Monitoring.

a) Alarms and events.

b) How alarms are generated

c) Emergency situation response.

f. As-built drawings

g. Operation and Maintenance Manual.

3. Training Session Duration: Minimum (1) 8-hour session per course or as required by COR.

4. Minimum Courses: Minimum two courses.

5. Date: One course will be at least 30 days prior to commissioning of first pump generator unit’s protection system and annunciation system. Government will provide at least 14 days advance notice of preferred training dates.

Revised 01 79 20 - 3

6. Total attendees at each training class performed: 20 maximum.

B. Programming and Maintenance Training

1. Attendees:

a. Provide a multi-session course which addresses needs of the following group, as well as needs of individual trades:

1) Electrical Engineers.

2) Electricians.

3) Communication and Instrumentation (C&I) technicians.

2. Training provided on minimum following topics, content shall be plant and equipment specific:

a. Overview of how components interact and function in overall operation of the system.

b. Safety and Protection.

c. Control and Monitoring Fundamentals and theory.

d. Operations and maintenance.

e. Testing.

f. Hardware.

g. Software.

h. Network.

i. Programming and altering the system.

j. As-built drawings.

k. Operation and Maintenance Manual.

3. Training Session Duration: Minimum (3) 8-hour sessions per course or as required by COR.

4. Minimum Courses: Minimum two courses.

5. Date: Course will be at least 30-days prior to commissioning of first pump generator unit’s protection system and annunciation system. Government will provide at least 14-days advance notice of preferred training dates.

6. Total attendees at each training class performed: 20 maximum.

C. Goal:

1. Each audience can perform their intended function on the completed system.

2. Operators can interpret feedback from the system to operate and run the facility.

3. Engineers, electricians, and C&I technicians can modify and maintain the system.

Revised 01 79 20 - 4

D. Government has sole ownership of Contractor provided training material.

E. Recording of Training Session:

1. Provide audio and color video recording of training.

2. Provide necessary equipment to record classroom portions of training.

3. Ensure projector screen presentations, white board diagrams, and flip chart paper diagrams developed during class are visible and legible on video recording.

4. Ensure audio for both instructor and class participants is understandable.

5. Use DVD format suitable for playback on standard equipment available commercially in the United States.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 TRAINING

A. Approved Training Materials:

1. Class Presentation:

a. PowerPoint presentation and handouts.

1) Including PowerPoint presentation and handouts.

b. In progress as-built drawings.

c. Draft Operation and Maintenance Manual.

d. Photos with descriptions of on-site installed equipment.

e. Reclamation reserves the right to reproduce and modify all Training Materials.

B. Where manufacturer instructions are insufficient, develop and provide procedures for system operation.

C. Provide 20 copies of bound, hard-copy training materials for each session for a total of 40 sets.

D. Government will furnish facilities for training and will retain training materials for future reference.

E. Provide necessary laptop to be used for training sessions.

Revised 01 79 20 - 5

F. Location: Onsite for hands-on training, and in classroom at Mt. Elbert Powerplant as required.

1. Use of actual installed equipment for training demonstration to be coordinated with COR.

2. Submit request to COR at least 14-days in advance. Include details describing intended operational sequences and locations of inspection to determine Government clearance procedures.

G. Attendance at each session will not exceed 20 personnel.

H. Contractor shall provide video recording equipment and personnel to operate equipment.

END OF SECTION

Revised 01 79 20 - 6

Removal of Existing Electrical Equipment

Revised 26 05 04 - 1

SECTION 26 05 04

REMOVAL OF EXISTING ELECTRICAL EQUIPMENT

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Removal of Existing Electrical Equipment:

1. Payment: Lump-sum prices offered in Price Schedule B and Price Schedule C.

B. Development of Pre-Demolition As-Built Drawings:

1. Payment: Lump-sum price offered in Price Schedule A.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM A 780-09(2015) Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

B. National Fire Protection Association (NFPA)

1. NFPA 70 – 2020 National Electric Code

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 26 05 04-1, Unit 1 Pre-Demolition As-Built Site Investigation Files:

1. Submit in electronic format, copies of videos, photos, sketches, and documentation generated for each enclosure and cabinet associated with Unit 1 and within the Contractor’s scope of work for the site visit.

a. All photos shall contain accurate date and time stamps in the photo itself and in the metadata of the files submitted for review.

2. Each enclosure or cabinet shall have its own folder labeled with that enclosure or cabinet’s unique facility identifier. For example, name the folder C2B1, for the C2B1 cabinet.

3. Folders labeled with the enclosure or cabinet’s unique identifier shall contain only videos, photos, sketches, and documentation associated solely with that enclosure.

a. Videos shall be edited to only contain portions of the video that are associated with the enclosure or cabinet for which the folder is labeled.

Revised 26 05 04 - 2

4. A single folder for copies of videos, photos, sketches, and documentation generated during the site investigation and not associated with a single enclosure, or that encompass multiple enclosures or cabinets, shall be contained in a folder labeled “Unit 1 General”.

C. RSN 26 05 04-2, Unit 1 Pre-Demolition As-Built Drawings:

1. As-built drawings for all cabinets, equipment, wiring and connections within the Contractor’s scope of work for this unit.

D. RSN 26 05 04-3, Removal Plan, Unit 1 Annunciation System and Protection System:

1. Submit detailed instructions and checklists, formatted in accordance with 01 33 26 – Electrical Drawings and Data, for the following processes and procedures.

a. Submit a removal schedule and plan.

b. Staged removal/installation process.

c. Describe methods and equipment to be used for removal of equipment, components and material.

d. Include storage plans for equipment (new and existing).

2. Include marked up versions of one-line, schematic, and wiring diagrams approved by the Government in RSN 26 05 04-2 for all removal activities.

E. RSN 26 05 04-4, Unit 2 Pre-Demolition As-Built Site Investigation Files:

1. Submit in electronic format, copies of videos, photos, sketches, and documentation generated for each enclosure and cabinet associated with Unit 2 and within the Contractor’s scope of work for the site visit.

a. All photos shall contain accurate date and time stamps in the photo itself and in the metadata of the files submitted for review.

2. Each enclosure or cabinet shall have its own folder labeled with that enclosure or cabinet’s unique facility identifier. For example, name the folder C2B2, for the C2B2 cabinet.

3. Folders labeled with the enclosure or cabinet’s unique identifier shall contain only videos, photos, sketches, and documentation associated solely with that enclosure.

a. Videos shall be edited to only contain portions of the video that are associated with the enclosure or cabinet for which the folder is labeled.

4. A single folder for copies of videos, photos, sketches, and documentation generated during the site investigation and not associated with a single enclosure, or that encompass multiple enclosures or cabinets, shall be contained in a folder labeled “Unit 2 General”.

F. RSN 26 05 04-5, Unit 2 Pre-Demolition As-Built Drawings:

Revised 26 05 04 - 3

1. As-built drawings for all cabinets, equipment, wiring, and connections within the Contractor’s scope of work for this unit.

G. RSN 26 05 04-6, Removal Plan, Unit 2 Annunciation System and Protection System:

1. Submit detailed instructions and checklists, formatted in accordance with 01 33 26 – Electrical Drawings and Data, for the following processes and procedures.

a. Submit a removal schedule and plan.

b. Staged removal/installation process.

c. Describe methods and equipment to be used for removal of equipment, components and material.

d. Include storage plans for equipment (new and existing).

2. Include marked up versions of one-line, schematic, and wiring diagrams approved by the Government in RSN 26 05 04-5 for all removal activities.

H. RSN 26 05 04-7, Switchyard and Common Systems Pre-Demolition As-Built Site Investigation Files:

1. Submit in electronic format, copies of videos, photos, sketches, and documentation generated for each enclosure and cabinet associated with the Switchyard and Common Systems and within the Contractor’s scope of work for the site visit.

a. All photos shall contain accurate date and time stamps in the photo itself and in the metadata of the files submitted for review.

2. Each enclosure or cabinet shall have its own folder labeled with that enclosure or cabinet’s unique facility identifier. For example, name the folder C2B3, for the C2B3 cabinet.

3. Folders labeled with the enclosure or cabinet’s unique identifier shall contain only videos, photos, sketches, and documentation associated solely with that enclosure.

a. Videos shall be edited to only contain portions of the video that are associated with the enclosure or cabinet for which the folder is labeled.

4. A single folder for copies of videos, photos, sketches, and documentation generated during the site investigation and not associated with a single enclosure, or that encompass multiple enclosures or cabinets, shall be contained in a folder labeled “Switchyard and Common Systems General”.

I. RSN 26 05 04-8, Switchyard and Common Systems Pre-Demolition As-Built Drawings:

1. As-built drawings for all cabinets, equipment, wiring, and connections within the Contractor’s scope of work for these systems.

J. RSN 26 05 04-9, Removal Plan, Switchyard and Common Systems Annunciation System and Protection System:

Revised 26 05 04 - 4

1. Submit detailed instructions and checklists, formatted in accordance with 01 33 26 – Electrical Drawings and Data, for the following processes and procedures.

a. Submit a removal schedule and plan.

b. Staged removal/installation process.

c. Describe methods and equipment to be used for removal of equipment, components and material.

d. Include storage plans for equipment (new and existing).

2. Include marked up versions of one-line, schematic, and wiring diagrams approved by the Government in RSN 26 05 04-8 for all removal activities.

1.04 GENERAL

A. In accordance with Section 26 05 02 - Basic Electrical Materials and Methods.

B. Removal of existing electrical and control components, including but not limited to, cable and conductors (including wiring inside control and electrical enclosures), raceway, junction boxes, pull boxes, control panels, enclosures, supports, miscellaneous metallic components, panelboards, load centers, circuit breakers, disconnect switches, transformers, terminal blocks, pushbuttons, switches, relays, PLCs, displays, and indicating lights.

C. Pre-Demolition As-Built Drawings

1. Contractor shall develop as-built drawings based on site investigations of existing wiring and existing drawings.

2. Contractor shall develop and furnish Pre-Demolition As-Built Drawings for all equipment, components, or connections that the Contractor will modify or demolish.

a. Perform site investigations to gather the necessary data required to generate Pre-Demolition As-Built Drawings within the Contractor’s scope of work.

b. Contractor shall collect data for Pre-Demolition As-Built Drawings via review of facility drawings and onsite investigation. The Request for Information (RFI) process shall not to be utilized for information gathering to develop these drawings.

c. Site investigations for the purpose of gathering data for as-built drawings shall not constitute mobilization by the Contractor.

d. Contractor shall request the necessary outages for as-built data gathering in accordance with Specifications Section 01 14 30 – Interruption of Service.

1) A single site investigation for data gathering is permissible.

Revised 26 05 04 - 5

2) Contractor shall define the scope of investigation for each site investigation and provide this information with the outage request.

a) List all cabinets, areas, and equipment that will require Contractor access.

e. Contractor shall supply all necessary personnel and investigation tools required for completion of this work.

f. Cable and Conductor Investigation:

1) Coordinate with the Government for unbundling of wire bundles.

a) Contractor is to re-bundle wires that are unbundled during the site investigation.

2) De-termination of wires is prohibited.

3) Removal of wires from multi-conductor cables, conduit, or raceway is prohibited.

g. Use only non-destructive investigative methods during the site investigation.

h. Interrogation, disconnection, or modification of computer systems, industrial control systems, multifunction relays, or other network assets during the site investigation is prohibited.

i. Contractor shall develop as-built drawings in accordance with Specifications Section 01 33 26, Part 1.03, C.

3. Demolition, installation, or modification activities for any equipment, components, enclosures, cabinets, raceways, boxes, or wiring are prohibited until the associated Pre-Demolition As-Built Drawings, and other RSN approval requirements in this executed contract, are submitted by the Contractor and approved by the Government.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT

A. Provide equipment, materials, and containers required for disassembly and removal of equipment.

PART 3 EXECUTION

3.01 GENERAL

A. Obtain electrical outage in accordance with Section 01 14 30 - Interruption of Service.

Revised 26 05 04 - 6

1. Government will establish clearance and lock-out, tag-out of equipment in accordance with RSHS.

B. New equipment shall be on site before removal or modifications of existing installation may begin.

C. Consult COR before:

1. Modifying, removing or permanently disabling existing components.

2. Removing components and equipment from site.

D. Cables and Raceway:

1. Disconnect cables and conductors intended for removal prior to removal from service.

3.02 PRE-DEMOLITION AS-BUILT DRAWINGS

A. Generate Pre-Demolition As-Built Drawings documenting the following, minimum, information for all equipment, components, or connections that the Contractor will modify or demolish. Where existing Government drawings are available, Contractor shall update and as-built existing drawings to document existing installation.

1. Dimensions of exterior and interior panel extents, from corner to corner for each horizontal and vertical length on the panel, to 0.0625 inches of accuracy for the following:

a. Front panels.

b. Side panels.

c. Rear panels.

d. Top panels.

e. Bottom panels.

f. Where a panel does not exist, measure the extent of the opening to 0.0625 inches of accuracy.

2. The enclosure or component’s unique identifier.

3. The location of the equipment or enclosure.

a. Enclosures:

1) For enclosures inside the control room note the location as control room.

2) For enclosures located outside of the control room note the floor elevation in the location description.

b. The location of the equipment.

Revised 26 05 04 - 7

1) For equipment inside the control room note the location as control room and, if located within a specific cabinet or enclosure, the specific enclosure in which the equipment is located.

2) For equipment located outside of the control room note the floor elevation in the location description.

4. Contractor shall verify all equipment ratings, installations, and connections. This includes, but is not limited to, the following components and includes verification of the cables or conductors connected to each terminal block, or device terminal:

a. Cables and conductors.

b. Terminal Blocks.

c. Resistors.

d. Diodes.

e. Test Switches.

f. Circuit Breakers.

g. Power Supplies.

h. Transformers.

i. Lockout relays.

j. Relays.

5. Contractor shall verify all cable information:

a. For multi-conductor cables:

1) The cable tag or label.

2) The cable jacket color and type.

3) The number of conductors in the cable.

4) The AWG or kcmil size for all conductors.

5) The insulation color and type for each conductor in the cable.

6) The termination location for each conductor in the cable.

a) Note the terminal block designator and specific terminal number for all conductors terminated on a terminal block.

b) Note the switch deck and specific location on each deck for all conductors terminated on switches or lockout relays.

c) Note the specific relay and specific location on each relay for all conductors terminated on a relay.

d) Note the specific termination points for all other

Revised 26 05 04 - 8

b. For single conductors:

1) The conductor tag or label.

2) The insulation color and type for each conductor.

3) The AWG or kcmil size for all conductors.

4) The termination location for each conductor.

a) Note the terminal block designator and specific terminal number for all conductors terminated on a terminal block.

b) Note the switch deck and specific location on each deck for all conductors terminated on switches or lockout relays.

c) Note the specific relay and specific location on each relay for all conductors terminated on a relay.

d) Note the specific termination points for all other equipment.

6. Contractor shall, at a minimum, update the following existing drawings where they are impacted by the Contractor’s activities during the performance of work related to this contract:

a. Wiring diagrams.

b. Schematic diagrams.

c. Layout or equipment arrangement drawings.

d. One-line or single-line diagrams.

e. Three-line diagrams.

f. Where existing drawings or diagrams for cabinets, equipment, or connections do not exist, create a new drawing in compliance with the as-built drawing requirements of these specifications.

7. Revise and resubmit all drawings found not to match the existing site conditions or as directed by the Contracting Officer (CO).

a. Modifications to equipment, enclosures, or wiring performed by, or at the direction of, the Government, within the Contractor’s scope of work, and for which a site visit for that specific wiring diagram has already been completed, will not require revision.

b. The burden of proof for changes to wiring performed by, or at the direction of, the Government, following a Contractor’s site investigation for any wiring diagram, shall be borne by the Contractor.

1) In contesting the requirement to redraft a pre-demolition as-built drawing due to a change in site conditions following the Contractor’s site investigation, the Contractor shall reference and provide copies of specific files generated and submitted by the

Revised 26 05 04 - 9

Contractor, and approved by the Government, under the appropriate As-Built Investigation Files RSN in this specifications section.

2) References and copies of specific files shall clearly show the as-built drawing that is being contested matches the site conditions at the time of the Contractor’s site investigation.

B. Pre-Demolition As-Built Drawings provided by the Contractor shall meet the requirements of Section 01 33 26 – Electrical Drawings and Data as well as Section 01 78 30 – Project Record Documents. Where conflict exists, the most stringent requirements apply.

1. Wiring Diagrams updated as part of the Pre-Demolition As-Built drawing set shall be provided in accordance with Section 01 33 26 – Electrical Drawings and Data, Part 1.03, C and Section 01 78 30 – Project Record Documents.

3.03 REMOVAL AND DISPOSAL

A. Remove and dispose of electrical and control components which are no longer in use based on Contractor performed modification:

1. Components no longer in use include:

a. Components which will be replaced or otherwise rendered obsolete.

b. Components used by, for, or connect to facilities, installations, equipment or systems which will be demolished, taken out of service or rendered non-functional by the Contractor.

B. Removal of Equipment and Components:

1. Take care to not damage equipment and accessory equipment.

2. Temporarily store on site.

C. Remove and dispose of grounding cables that are damaged or in an unacceptable condition. Prior to removal and disposal of grounding cable ensure new grounding connections have been supplied and installed.

D. Return modified cabinets or enclosures to a neat finished condition.

E. Patch holes in cabinets, enclosures, or other locations resulting from the removal of equipment or components. Minimize number of individual patches for an enclosure or location.

1. If all components or a significant majority of the components are removed from an enclosure front, then the enclosure front shall be replaced or patched with a single piece over the entire enclosure front.

Revised 26 05 04 - 10

2. Provide an equivalent level of moisture and weather permeability as existing installation.

3. Maintain structural integrity of the existing installation.

F. Paint enclosures or any bare locations left by patches or other enclosure or equipment modifications performed for the Work. To the extent possible, color shall match existing enclosure and line-up color schemes. In addition, the final finish shall be of an equivalent quality and provide equivalent corrosion resistance.

G. Where galvanization of components is damaged or affected repair damaged galvanized surfaces repair in accordance with ASTM A 780, except repair materials containing cadmium and lead are not permitted.

H. Dispose of removed equipment and other materials in accordance with Section 01 74 00 – Cleaning and Waste Management.

3.04 CONTRACTOR FIELD QUALITY TESTING

A. Test re-installed or re-terminated equipment and cables as required in Division 26.

B. Re-installed equipment or re-terminated cable that is damaged as a result of Contractor handling shall be replaced by the Contractor with new cable or equipment at no cost to the Government.

Conductors and Cables

Revised 26 05 10 - 1

SECTION 26 05 10

CONDUCTORS AND CABLES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Conductors and Cables:

1. Payment: Lump-sum prices offered in Price Schedule B and Price Schedule C.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM B8 - 2011(2017) Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

2. ASTM B496 - 2016 Compact Round Concentric-Lay-Stranded Copper Conductors

B. Insulated Cable Engineer Association (ICEA)

1. ICEA S-104-696-2001 Standard for Indoor-Outdoor Optical FiberCable

2. ICEA S-116-732-2013 Standard for Category 6 and 6A, 100 Ohm, Individually Unshielded Twisted Pairs, Indoor Cables (With or Without An Overall Shield) for Use In LAN Communication Wiring Systems

C. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE 1202 – 2006 Standard for Flame – Propagation Testing of Wire & Cable

2. IEEE C2 – 2017 National Electrical Safety Code (NEC)

D. International Standards Association

1. ISO 11801-2002 Information Technology – Generic Cabling for Customer Premises

E. National Electrical Manufacturers Association (NEMA)

1. NEMA WC 57 – 2014 Standard for Control, Thermocouple Extension, and Instrumentation Cables

2. NEMA WC 70 – 2009 Power Cables Rated 2000V or Less for the Distribution of Electrical Energy

Revised 26 05 10 - 2

F. National Fire Protection Association (NFPA)

1. NFPA 70 – 2017 National Electrical Code (NEC)

G. Telecommunications Industry Association (TIA)

1. TIA 568.0-Rev.D – 2015 Generic Telecommunications Cabling for Customer Premises

2. TIA 568.1-Rev.C – 2015 Commercial Building Telecommunications Infrastructure Standard

3. TIA 568.2-Rev.C – 2009 Balanced Twisted-Pair Telecommunications Cabling and Components Standards

4. TIA 568.3-Rev.D – 2016 Optical Fiber Cabling Components Standard

5. TIA 568.4-Rev.D – 2017 Broadband Coaxial Cabling and Components Standard

6. TIA 598-14 Optical Fiber Cable Color Coding

7. TIA 1152-09 Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling

H. Underwriters Laboratories, Inc. (UL)

1. UL 486B – 2013 Wire Connectors

2. UL 1581 – 2001 Standard for Electrical Wires, Cables, and Flexible Cords

3. UL 1685 – 2015 Standard for Vertical-Tray Fire-Propagation and Smoke-Release Test for Electrical and Optical-Fiber Cables

1.03 DESIGN REQUIREMENTS

A. Determine conductor sizes, except where shown or specified, in accordance with NFPA 70. In event of conflict between design requirements and NFPA 70, more stringent requirement applies.

B. Provide either multi-mode fiber optic cable or CAT6A cable for network connections, except where indicated otherwise on these drawings or specifications.

C. Reuse existing conduit to the furthest extent possible.

D. Reuse of Cables:

1. Where not indicated otherwise, existing facility conductors and cables may be reused.

2. Provide new cables where required due to project modifications

Revised 26 05 10 - 3

3. Provide new cables, and do not reuse existing conductors or cables, for the following applications:

a. Cables that are internal to the C2B cabinets and do not exit the cabinets.

b. Cables that are internal to the C2A control board do not exit C2A, and connect to Contractor supplied equipment

c. Cables that are internal to an enclosure and have both ends of the cable terminate within the same enclosure. Cables will be considered internal to C2A if both ends terminate somewhere within C2A, regardless of which section of C2A they terminate in.

4. Replace cables as required and in accordance with Contractor’s approved submittals for a fully functional protection system.

E. Provide UL listed plenum or tray cable as required.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals and Section 01 33 26 – Electrical Drawings and Data.

B. RSN 26 05 10-1, Approval Data:

1. Manufacturer’s technical catalog data.

C. RSN 26 05 10-2, Construction Documentation:

1. Test Reports and Wire Termination Sheets.

a. Provide test reports for each cable provided by the Contractor.

1.05 DEFINITIONS

A. Cable: Cable, cables, wire, or wires of one or more insulated conductors.

B. Power Cable: For power loads; motors; alternating- and direct-current distribution circuits; heating, ventilating, and air-conditioning circuits; and cable that is used for controlling heating, ventilating and air-conditioning equipment. Utilized for cable operating voltages 600 volts and below.

C. Building Premises Wire: For connection of lighting system and power receptacle components below 277 volts.

D. Control Cable: For control, metering, indication, annunciation, and relaying circuits; and circuits not identified as power circuits. Utilized for cable operating voltages below 600 volts.

E. Instrumentation Cable: Power limited cable for RTD, transducer output circuits, and can be used for serial communication (RS-232 & RS-485).

Revised 26 05 10 - 4

F. Telecommunications Cable: For supervisory computer control, voice communication, and logic level signals. (fiber, Ethernet, coax, etc.)

G. Enclosure Wiring: For wiring inside of enclosures or control boards.

1.06 PROJECT CONDITIONS

A. Locations of existing cables indicated on drawings are approximate.

PART 2 PRODUCTS

2.01 CABLE, GENERAL

A. Manufactured no more than 24 months prior to Notice to Proceed.

B. Conductors:

1. Copper in accordance with ASTM B8, class B or C.

2. Stranded conductors, except for solid conductor building premises wire.

3. Round shape, unless specified otherwise.

C. AWG or kcmil designation.

D. UL listed and labeled.

E. Color Coding:

1. Provide color coding via colored insulation or jacket compound. Do not apply color coatings to insulation or jacket surface.

2. Phase Conductors:

a. Single-Conductor:

1) 120/240, single-phase: Black.

2) 120/208 or 240 volt. 3-phase: Black, red, blue. Colored phase tape may be used in lieu of colored insulation.

3) 277/480 volt: Black. Provide brown, orange, yellow colored phase tape.

b. Multi-Conductor:

1) Utilize NEMA WC57 Table E2 for cables with conductors 8 AWG and smaller.

2) 120/240, single-phase: NEMA WC 57 Table E2.

3) 120/208 or 240 volt. 3-phase: NEMA WC 57 Table E2.

Revised 26 05 10 - 5

4) 277/480 volt: NEMA WC 57 Appendix E Method 4. Provide brown, orange, yellow colored phase tape.

3. Direct Current (Ungrounded) Conductors:

a. 125-volt DC positive bus: Red.

b. 125-volt DC negative bus: Black.

4. Neutral (Grounded) Conductors: In accordance with NFPA 70.

5. Equipment Grounding Conductors:

a. 6 AWG and smaller: Green insulation.

b. Larger than 6 AWG: Green tape at both ends and visible points including junction boxes.

6. Control Cable:

a. In accordance with NEMA WC 57, Table E-2.

7. Instrumentation Cable:

a. Sequentially number each pair/triad for identification.

8. Telecommunications Cable:

a. Fiber Optic Cable: In accordance with TIA 598.

b. Category 6A Cable: In accordance with TIA 568.

c. Coaxial Cable: In accordance with NFPA 70.

2.02 POWER CABLE

A. 600-volt rated insulation unless specified otherwise.

B. Single-conductor power cable in accordance with NEMA WC 70. Multi-conductor cable in accordance with NEMA WC 57.

C. Conductors:

1. Copper in accordance with ASTM or B496, class B or C.

2. Stranded conductors.

3. Minimum Conductor Size:

a. Single Conductor Cable: 12 AWG.

b. Multi-Conductor Cable: 14 AWG.

4. Conductor sized according to application requirements, and in accordance with the requirements and recommendation in the NEC, including derating of the cable ampacity for conditions where the cable will be installed. Cable sizing shall be based on an ambient temperature of 40o C, unless actual conditions require a higher ambient temperature.

Revised 26 05 10 - 6

D. Type.

1. Single-conductor or multi-conductor, non-shielded type.

2. Suitable for wet or dry location, indoors or outdoors.

3. Suitable for installation in above grade or underground raceway.

4. UL listed type TC.

5. Suitable for installation in vertical position without injury to covering or deformation of insulation when supported in accordance with NFPA 70.

6. Rated for installed configuration in installation locations, including plenums or NFPA 70 Class 1, Class 2 and Class 3 hazardous areas, where applicable.

E. Rated for a minimum of 90o C continuous operating temperature, Wet or Dry.

F. Insulation Type:

1. EPR, XLPE, or equal. Halogen free containing less than 0.2-percent halogen content by weight.

G. Overall Jacket:

1. Type: Halogen free containing less than 0.2-percent halogen content by weight.

2. UV Resistant.

3. Includes rip-cord for single conductor cables.

H. Flame Test Rating:

1. IEEE 1202 or UL 1685.

I. Provide multi-conductor power cable with integral ground conductor. Size ground conductor in accordance with NEMA WC 70.

J. Round, except for 2-conductor cable with parallel conductors.

K. Small diameter conductors (1/0 AWG and smaller) shall be grouped into multi-conductor cables including overall jackets, unless specified otherwise.

2.03 CONTROL CABLE

A. 600-volt rated insulation unless specified otherwise.

B. Single-conductor power cable in accordance with NEMA WC 70. Multi-conductor cable in accordance with NEMA WC 57.

C. Conductors:

1. Copper in accordance with ASTM or B496, class B or C.

2. Stranded conductors.

Revised 26 05 10 - 7

3. Minimum Conductor Size:

a. Single Conductor Cable: 12 AWG.

b. Multi-Conductor Cable: 14 AWG.

c. Conductors used for Current Transformer (CT) or Potential Transformer (PT) applications shall have minimum conductor sizes of 10 AWG for CT applications and 12 AWG for PT applications.

D. Conductor sized according to application requirements, and in accordance with the requirements and recommendation in the NEC, including derating of the cable ampacity for conditions where the cable will be installed. Cable sizing shall be based on an ambient temperature of 40o C, unless actual conditions require a higher ambient temperature.

E. Type:

1. Single-conductor or multi-conductor, non-shielded type.

2. Suitable for wet or dry location, indoors or outdoors.

3. Suitable for installation in above grade or underground raceway.

4. Suitable for direct burial installation when required by specifications or installation location

5. UL listed type TC.

6. Suitable for installation in vertical position without injury to covering or deformation of insulation when supported in accordance with NFPA 70.

7. Rated for installed configuration in installation locations, including plenums or NFPA 70 Class 1, Class 2 and Class 3 hazardous areas, where applicable.

F. Rated for a minimum of 90o C continuous operating temperature, Wet or Dry.

G. Insulation Type:

1. EPR, XLPE, or equal. Halogen free containing less than 0.2-percent halogen content by weight.

H. Overall Jacket:

1. Type: Halogen free containing less than 0.2-percent halogen content by weight.

2. UV Resistant.

3. Includes rip-cord for single conductor cables.

I. Shield

1. Provide shielding confirming to NEMA WC 57 for cables used for Current Transformer (CT) or Potential Transformer (PT) applications.

2. Conform to NEMA WC 57.

Revised 26 05 10 - 8

J. Flame Test Rating:

1. IEEE 1202 or UL 1685.

K. Round, except for 2-conductor cable with parallel conductors.

L. Small diameter conductors (1/0 AWG and smaller) shall be grouped into multi-conductor cables including overall jackets, unless specified otherwise.

2.04 INSTRUMENTATION CABLE

A. Minimum 300-volt rated insulation.

B. Cable in accordance with NEMA WC 57.

C. Conductors:

1. Copper in accordance with ASTM 8, class B or C.

2. Stranded conductors.

3. Minimum Conductor Size:

a. Minimum size: 14 AWG.

b. Conductor sizes to 22 AWG allowed for serial communications applications.

4. Conductor sized according to application requirements, and in accordance with the requirements and recommendation in the NEC.

D. Type:

1. Single-pair or triad shielded, or multiple individual shielded pairs or triads with overall shield.

2. Suitable for installation in above grade or underground raceways.

3. Suitable for direct burial installation when required by specifications or installation location.

4. UL listed type PLTC.

5. Suitable for installation in vertical position without injury to covering or deformation of insulation when supported in accordance with NFPA 70.

6. Rated for installed configuration in installation locations, including plenums or NFPA 70 Class 1, Class 2 and Class 3 hazardous areas, where applicable.

E. Rated for a minimum of 90o C continuous operating temperature, Wet or Dry.

F. Insulation:

1. EPR, XLPE or equal.

Revised 26 05 10 - 9

2. 300 volts, minimum.

G. Shield

1. Pair/Triad Shield:

a. Required for each pair/triad.

b. Aluminum-mylar tape providing 100 percent coverage with a tinned, stranded copper drain wire.

2. Overall Shield:

a. Required for multi-pair or multi-triad cables.

b. Aluminum-mylar tape providing 100-percent coverage with a tinned, stranded copper drain wire.

H. Jacket:

1. PVC (Polyvinyl chloride) or CPE (Chlorinated Polyethylene) or better, flame-retardant with rip-cord.

2. Sunlight and moisture resistant.

I. Flame Test Rating:

1. IEEE 1202 or UL 1685.

2.05 ENCLOSURE WIRING

A. Wiring inside switchboards, control panels, etc., not intended for use extending outside of the enclosure. Enclosure wiring for instrumentation or telecommunications shall maintain characteristics of those cable types.

B. Minimum 600-volt rated insulation.

C. Type:

1. NEC type SIS.

D. Minimum Conductor Size:

1. 16 AWG

2. Conductor sized according to application requirements, and in accordance with the requirements and recommendation in the NEC.

E. Insulation Type

1. XLPE, or equal.

F. Insulation Color:

1. Gray, unless special purpose application.

Revised 26 05 10 - 10

G. Flame Test Rating:

1. UL 1581 VW-1

2.06 TELECOMMUNICATIONS CABLE

A. Cable performance shall not be impacted by immersion in water.

B. UL listed, where available.

C. Approved Types of Telecommunications Cable:

1. Multi-Mode Fiber Optic Cable:

a. Cable Type: Multi-Mode.

b. Major Cable Components:

1) Fibers per cable: As required, with a minimum of 12 fibers per cable.

2) Spare fibers per cable: 20 percent or a minimum of 6 fibers per cable, whichever is greater.

c. Optical Fibers:

1) Wavelengths: As required for the application.

2) Fiber Type: OM1, per ISO 11801. Modification to this requirement shall be with explicit written approval of the CO.

3) Attenuation: Per ISO 11801 requirements for fiber type specified.

4) Attenuation: Directly proportional to cable length for an arbitrary cable length section after steady-state conditions are reached.

d. End Termination: As required by installation.

e. Cable Characteristics:

1) Color Coding: Per TIA/EIA-598.

2) Loose tube.

3) Gel-free.

4) Rod Filler: Central dielectric strength member.

5) Cable Core: Symmetrically stranded buffer tubes around dielectric central member.

6) Dielectric outer cable.

7) Includes ripcord.

8) Rated for riser installation.

9) Fire Retardant: OFNR, in accordance with UL 1666.

Revised 26 05 10 - 11

10) UV Resistant outer jacket material.

11) Includes ripcord.

12) Armored Cable: Provided where required due to installation type and location, corrugated steel tape armor.

13) Cable Tensile Strength:

a) Long Term (installed): 180 pounds.

b) Short Term (during installation): 600 pounds.

14) Designed Service Life: 40 years at specified installation and operating conditions.

15) Age at Installation: 24-months old, maximum.

2. Fiber Optic Patch Cable (Multi-Mode):

a. Type: OM1.

b. Length: As required.

c. Connectors:

1) As required to connect to fiber optic equipment.

d. Loss per Connector: Less than 0.5 dB.

e. Assembly and mounting hardware.

3. Category 6A (CAT 6A) cable with RJ45 connections:

a. Provide in accordance with TIA 568.

1) Type:

2) UL listed CMR cable, unless otherwise required for installation conditions.

3) Single twisted pair, or multiple individual twisted pairs. Quantity of pairs as required for application.

4) Suitable for installation in above grade or underground raceways.

b. Rated for…