BGNDRF YARD PIPING AND FLOW MEASUREMENT UPGRADES
Solicitation number
140R4025R0017
Issued by

About this file

This Sources Sought Notice is issued by the Bureau of Reclamation for a Design-Build project to upgrade water piping and flow measurement infrastructure at the Brackish Groundwater National Desalination Research Facility (BGNDRF) in Alamogordo, New Mexico. The project involves a two-phase design-build approach with an estimated budget between $500,000 and $1 million, targeting small businesses for a contract to design and construct yard piping upgrades, including buried and above-grade piping for source water, potable water, and concentrate water, along with flow measurement improvements.

Key project requirements include installing new piping manifolds, valve vaults, magnetic flow meters, SCADA system integration, temperature-controlled heat trace and insulation, and completing all testing and commissioning by June 2026. Interested small businesses must submit a capabilities statement by April 6, 2025, at 5:00 PM MDT, including business information, unique entity ID, business type, past project experience, and equipment assets. Prospective contractors must be registered in the System for Award Management (SAM) to be eligible for the future solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF RECLAMATION

Upper Colorado Regional Office

140R4025R0017 - SOURCES SOUGHT NOTICE

Brackish Groundwater National Desalination Research

Yard Piping and Flow Measurement Upgrade Please respond to vjiron@usbr.gov, no later than

5:00 PM MDT (Mountain Daylight Time) on April 6, 2025

NOTICE: THIS IS NOT A SOLICITATION OR REQUEST FOR

PROPOSAL, BUT RATHER A SOURCES SOUGHT SYNOPSIS TO

DETERMINE POTENTIAL SOURCES FOR INFORMATION

AND PLANNING PURPOSES ONLY.

NO FORMAL SOLICITATION FOR THIS WORK EXISTS AT THIS TIME

The Bureau of Reclamation (Reclamation), Upper Colorado Basin Region, has a requirement for a Two-Phase Design-Build project to provide upgrades to site source water (SW), potable water (PW) and concentrate water (CW) piping and flow measurement infrastructure at the Brackish Groundwater National Desalination Research Facility. Based upon responses to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 237110 Water and Sewer Line and Related Structures Construction, and the related small business size standard is $45.0 million. Product Service Code (PSC) is C1NE Architect and Engineer-Construction: Water Supply Facilities. This notice is not a request for proposals/quotations and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner.

Background

Reclamation was created in 1902 to develop water projects that would store and transport water to the arid lands of the Western United States. Reclamation now spans 17 western states, divided into 5 regions. Within the Upper Colorado Basin Region, the Albuquerque Area Office (AAO) is one of the largest in Reclamation, reaching from the Alamosa area of southern Colorado through most of New Mexico and into west Texas. The AAO manages water delivery on the Rio Grande, Rio Chama, Pecos and Canadian rivers.

The 2001 Desalination Act, directed Reclamation, in cooperation with Sandia National Laboratories, to plan for a desalination research and development facility in the Tularosa Basin of New Mexico. The facility is called the Brackish Groundwater National Research and Development Facility (BGNDRF). The Research Facility is integrated into Reclamation's existing desalination research and development program. It fills a unique role and draws upon the expertise and research activities already established.

BGNDRF is proposing to upgrade the existing source water, potable water, and concentrate water piping and flow measurement infrastructure of the outdoor test area known as Pad 10. The project will design, then construct new piping to support three supply and waste manifolds and provide a new piping system for a future supply tank.

Reclamation seeks contractor services to provide Design-Build services at BGNDRF located at 500 Lavelle Road in Alamogordo, New Mexico in Otero County.

Objective

The project is to be designed and constructed in two phases, using a traditional design-build delivery method. In this contract, traditional design-build refers to construction delivery method that provides owners with a single point of contact for both the design and construction phases of a project.

Design Phase: Collect design data and investigations as needed, prepare designs for all required project infrastructure targeted to the stipulated construction budget, and develop a final price proposal, targeted to the project budget, in consultation with Reclamation and Project stakeholders to complete designs, specifications and construct the yard piping and flow measurement upgrade.

Construction Phase: Complete construction tasks, including yard piping and flow measurement upgrades, four (4) magnetic flow meters in the CW vault, install new conduit from all new flow meter locations to the existing plant SCADA system, temperature-controlled heat trace and insulation for all pressure piping, and all testing, training, and commissioning.

Project shall provide upgrades to site source water, potable water, and concentrate water piping and flow measurement infrastructure.

Design and construct the following:

1. Yard piping and flow measurement upgrades:

a. Buried and above grade piping infrastructure (SW 4) from Point A (future Source Water Storage Tank 4 (SWST4) and Source Water Booster Station 4 (SWBS4) location) with branches to the Research Facility Building (Point B) and the TP10 Flow Measurement Vault (Point C).

b. TP10 Flow Measurement Vault (Point C) installation including below grade vault, access hatch(es), magnetic flow meters, power and controls, valves, piping, and accessories.

c. Buried piping infrastructure for SW 4 from the TP10 Flow Measurement Vault (Point C) to the SW Vault (Point D) for interconnection with the existing 2” SW piping and branch to the TP7, TP8, and TP9 SW4 Manifolds (Point F, Point G, Point H, respectively).

d. Removal of the existing partially buried TP10 manifold, which contains existing piping from SWST1 (SW 1), SWST2 (SW 2), SWST3 (SW 3), and PW source, and rerouting buried piping to the TP10 Flow Measurement Vault (Point C).

e. Buried piping for SW 1, SW 2, SW 3, SW 4, and PW from TP10 Flow Measurement Vault (Point C) to three above grade piping manifolds at TP10 (Point E).

f. Three TP10 Piping Manifolds (Point E) that each provide above grade connection to SW 1, SW 2, SW 3, SW 4, PW sources and a connection to CW pressure drain piping.

g. Separate pressure CW drain piping (three pipelines) from each of the three TP10 manifolds (Point E) to the CW Vault (Point L). The pressure drain piping shall be buried between the TP10 manifolds and the CW Vault.

h. A valving manifold within the CW Vault (Point L) which allows any of the three TP10 Piping Manifolds to deliver CW water to any of the three Evaporation Ponds (Point M, Point N, or Point O) or the Halophyte Research Area (Point P).

i. TP7 Valve Vault Installation and Valve Replacement including removal of three existing valve covers and replacement with the below grade TP7 Valve Vault and replacement of the three existing valves and accessories.

j. TP8 Valve Vault Installation and Valve Replacement including removal of three existing valve covers and replacement with the below grade TP8 Valve Vault and replacement of the three existing valves and accessories.

k. TP9 Valve Vault Installation and Valve Replacement including removal of three existing valve covers and replacement with the below grade TP9 Valve Vault and replacement of the three existing valves and accessories.

2. Four (4) magnetic flow meters in the CW Vault which measure instantaneous and total CW flow to the three Evaporation Ponds (Point M, Point N, or Point O) and the Halophyte Research Area (Point P). The flow meters shall provide local readout and remote readout to the existing plant SCADA system. Electrical power to flow meters and heat trace, including duct bank and conduit.

3. The contractor will install new conduit from all new flow meter locations to the existing plant SCADA system. Controls cabling from flow meters to interface with existing SCADA system. The Contractor will be responsible for installing and terminating controls cabling through new terminal blocks to the existing SCADA PLC within the existing Research Facility building. The contractor will also be responsible for providing surge/transient suppression on these new cables.

The Owner will be responsible for programming the new signals into the existing SCADA system.

4. Temperature controlled heat trace and insulation for all pressure piping above frostline and as required for below grade or vaulted infrastructure.

5. Testing, training, and commissioning.

Reclamation’s objectives for delivery of the project are described as follow:

Successful Implementation: In proceeding with a design-build procurement, Reclamation is committed to working in close collaboration with the Designer-Builder during the design phase to develop the project design to best achieve project objectives within available project budget.

Quality: The project shall provide upgrades to the site SW, PW, and CW piping and flow measurement infrastructure that meets the specified design criteria and physical criteria for the BGNDRF performance and capabilities.

Life-Cycle Cost: The total estimated budget for design and construction activities covered under this contract is expected to range between $500,000.00 and $1.0 million.

Reclamation’s objectives include minimizing life-cycle costs.

Schedule: Achieve the scheduled completion date of June 2026 for substantial completion of construction.

Risk: Achieve an optimal balance of risk allocation between Reclamation and the Designer-Builder.

Safety: Implement an effective safety program incorporating best industry practices that meets or exceeds all relevant Occupational Safety and Health Administration (OSHA) and Reclamation health and safety standards.

All responsible Small Business Sources are encouraged to respond with their capabilities statement to include experiences and expertise, examples of similar projects that reflect the requirement, type of work complexity and value which shall be reviewed by the agency and demonstrates the firm's experience and capability to perform the principal components of the project listed above.

Interested Small Business Sources should include the following information in their capabilities statement response:

(a) Business name, address, cage code, and point of contact information.

(b) Unique Entity ID for sam.gov

(c) Business Size and Type: 8(a), HUBZone, Women-owned, Service-Disabled Veteran-

Owned, Small Business, etc.

(d) Evidence of your experience performing similar and relevant to the type and scope of work in this announcement within the last three years. The evidence should include the following: contract numbers, project titles, dollar amounts and points of contacts with email and telephone numbers. Please do not include more than three past projects.

(e) Include attachments cataloging the company’s equipment assets (as necessary), resources that demonstrate company responsibility and capability to perform required work.

The purpose of this notice is to gain knowledge of interest, capabilities, and qualifications of potential contractors for solicitation planning purposes only. This is NOT a request for proposals and is NOT to be construed as a commitment by the Government. Responses to the sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to the sources sought notice. No reimbursement will be made for any costs associated with providing information in response to this notice.

Submit an electronic Capabilities Statement to vjiron@usbr.gov by April 6, 2025, at 5:00 PM MDT. Prospective Contractors must be registered and must maintain an active registration in the System for Award Management, (SAM), as required by FAR 4.1102. Prospective contractors must be registered prior to any prospective award. Lack of registration in the SAM database will make an offeror ineligible for prospective award. Information on SAM registration can be obtained via the internet at http://www.sam.gov.

When it is determined that a formal solicitation will be issued, a Pre-Solicitation Notice will be posted on to SAM.gov Federal Contract Opportunities.