DRAFT_140R4025R0006_Attachment_7_-_Experience_Form_3.docx
DOCX document 13 KB Posted
- Attached to
- NGWSP REACH 1 PIPELINE REPAIRS
- Solicitation number
- 140R4025R0006
About this file
This is an experience worksheet template limited to 2 pages per project that contractors must complete to document their relevant past performance. The form captures key project details including project name, location, contract number, customer information, contract type (with options for Design-Build, Progressive Design-Build, Construction Manager at Risk, Design-Bid-Build, or Design Only), and the contractor's role (Principal Designer, Constructor, or Designer & Constructor).
The worksheet requires contractors to provide project descriptions covering scope, complexity and magnitude, along with schedule and cost performance metrics including original/actual completion dates and original/final contract amounts. Contractors must explain any schedule or cost variances and describe any performance issues encountered and corrective actions taken. This template appears to be Attachment 7 to solicitation 140R4025R0006 for NGWSP Reach 1 Pipeline Repairs being conducted by the Bureau of Reclamation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE WORKSHEET
(MAXIMUM 2 PAGES PER PROJECT)
Project Name:
Project Location:
Contract Number:
Customer Name:
Customer Address:
Customer Contact:
Contact Phone:
| Type of Contract: |
| Traditional Design-Build Progressive Design-Build Construction Manager at Risk |
Design-Bid-Build Design Only
| Role: |
| Principal Designer Principal Constructor Designer & Constructor |
| Point of Involvement: |
| Conceptual Planning Design Construction |
Description of Project:
(Include scope, complexity, magnitude, and any other relevant information)
Original Completion Date (Mo/Yr):
Actual Completion Date (Mo/Yr)
Explain Early/Late Completion:
Original Contract Amount:
Final Contract Amount:
Explain Under/Over Budget Costs:
Describe any problems encountered in performance of the work and corrective action(s) taken: