Bureau of Reclamation, 805 Bureau St, Page, AZ. 86040
Attachment A Specifications for Piping and Supplies for UV Strainers Scope The Bureau of Reclamation, Glen Canyon Field Division (GCFD) Glen Canyon has undertaken an effort to install UV Strainers to help prevent quagga muscles from going through the dam. To facilitate this, Glen Canyon is seeking to procure supply steel pipe, fittings, hardware and supplies for UV Light Strainers.
Requirements The contractor shall provide all the items in the quantities listed for use in the installation of the steel piping and steel fittings as applicable for the UV strainers.
Listed products must be compatible with associated products listed within.
Quantities shown are minimum amounts of each item. Items sold in packs, bags, pairs, or bulk quantities may be provided given the total amount is greater than the minimum amounts shown listed below.
Standards and Code Requirements All offered products shall comply with any applicable, American Society for Testing and Materials (ASTM), American National Standards Institute (ANSI) and be suitable for industrial use.
Delivery Delivery 30 days after award or best possible shipping date that can be provided.
Delivery shall be freight on board destination (GCFD) and shall be included in the total cost.
Delivery of material will be between the hours of 7:00 AM to 4:00 PM Monday through Thursday. The Contractor shall give notice of at least 48 hours prior to delivery GCFD.
Delivery address is as follows: Bureau of Reclamation, Glen Canyon Field Division, 805 Bureau St, Page, AZ 86040 Submittals for Quotations Vendor quotations shall include the following to be deemed acceptable:
1. Description of the items being quoted in sufficient detail to evaluate compliance with the stated specifications. Including any brochures and/or cut sheets to confirm the items meet the needs of the requirement.
2. The Contractor must provide a quote from their own letterhead and pricing breakdown.
3. The Contractor shall state the estimated delivery after receipt of award.
4. The contractor must list any exceptions when submitting quote.
If vendor fails to submit the above information the quote can be found to be non-responsive.
Parts Requirements
| Item |
| Description |
| Quantity |
| 1 |
| 21’ – 6” Schedule 80 pipe |
| 6 Ea |
| 4 |
| 8” 300# Blind Flange |
| 6 Ea |
| 5 |
| 8”x 6” Reducer Schedule 80 |
| 6 Ea |
| 6 |
| 6” – 90s Schedule 80 |
| 18 Ea |
| 7 |
| 6” – 45s Schedule 80 |
| 18 Ea |
| 8 |
| 6” – ‘T’s Schedule 80 |
| 12 Ea |
| 9 |
| ¾ x 2 ½” Cap Screws |
| 500 Ea |
| 10 |
| ¾ x 4” Cap screws |
| 150 Ea |
| 12 |
| 7/8”x 4 ½” Cap Screws |
| 150 Ea |
| 18 |
| 6” Hi Pro Butterfly Valves |
| 18 Ea |
| 19 |
| 7/8 x 2 ½” Cap Screws |
| 300 Ea |
| 20 |
| 7/8 x 3 ½” Cap Screws |
| 250 Ea |
| 22 |
| 21’ – 10” Schedule 40 pipe |
| 1 Ea |
| 24 |
| ½ x 2 ½” Nipples |
| 12 Ea |
| 25 |
| 10” Hi Pro Butterfly Valves |
| 12 Ea |
| 26 |
| 10” 150# Flanges |
| 24 Ea |