Attachment_1_-_Statement_of_Work___Specs__Amd__1_0001.pdf

PDF 213 KB Posted

Attached to
BIL-LSARI TRACK MOUNTED DRILL RIG Federal contract opportunity
Solicitation number
140R4024Q0014
Issued by
Department of the Interior Bureau of Reclamation

About this file

This statement of work specifies requirements for a track mounted drill rig to be acquired by the Bureau of Reclamation. The drill rig must be capable of installing shallow groundwater monitoring wells and conducting direct push and hollow stem auger tests. Required specifications and components for the track mounted drill rig include a minimum 40 foot hollow stem auger and 40 foot direct push auger, 1756 square inch track surface area, 78 inch head travel, 36,000 pound head crowd force, and a 65/56 horsepower engine. Additional requirements comprise delivery and training between February 1, 2024 and June 30, 2024 at the Bureau of Reclamation's Socorro Field Office, as well as a standard commercial warranty on all equipment. Payment will be lump sum upon delivery.

View the file

Other files for this federal contract opportunity

Other files attached to BIL-LSARI TRACK MOUNTED DRILL RIG, newest first.
File Type Posted
Sol_140R4024Q0014_Amd_0001.pdf PDF
Combined_Synopsis_Solicitation_Amd__1_0001.pdf PDF
Attachment_2_-_Price_Schedule.pdf PDF
Sol_140R4024Q0014.pdf PDF
Attachment_1_-_Statement_of_Work___Specs_.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: 140R4024Q0014

Attachment 1 Statement of Work

Bureau of Reclamation

FOR OFFICIAL USE ONLY

Attachment 1

BIL-LSARI Track Mounted Drill Rig

Statement of Work

PART 1 GENERAL

1.01 DESCRIPTION

The Bureau of Reclamation (Reclamation) is acquiring a track mounted drill rig which will provide the capability to install shallow groundwater wells as needed throughout the Middle Rio

Grande (MRG). Groundwater data is very limited within the MRG and Reclamation plans on improving the shallow groundwater network by installing shallow groundwater wells. The focus will be at priority sites along the Rio and then branch out from these sites to continually improve our knowledge and data. The track mounted drill will make shallow groundwater well instillation more efficient and allow Reclamation to install shallow monitoring wells as needed.

The track mounted drill rig must meet all the specifications, including additional parts, training, and warranty, listed in this document.

The vendor shall set up the equipment and provide adequate training on its usage, as required by

Reclamation. Training shall include a breakdown of the machine and all the parts included in the acquisition and training on how to safely use the drill, including a demonstration of well installation.

Delivery and training must take place between February 1, 2024, and June 30, 2024, to the

Bureau of Reclamation, Socorro Field Office. All required equipment must be included in the same delivery.

1.02 MEASUREMENT AND PAYMENT

A. The cost measurement for each piece of equipment includes the following:

1. Track mounted drill rig with rotary and direct push monitoring well installation capabilities.

2. A minimum of 40 ft hollow stem augers plus all equipment needed.

3. A minimum of 40 ft direct push augers plus all equipment needed.

4. Delivery to the Socorro office, Socorro Field Office: 2401 State Road One, Socorro NM 87801

B. Payment: Lump-sum, firm fixed price upon delivery.

tspencer Highlight

Bureau of Reclamation

FOR OFFICIAL USE ONLY

1.03 SUBMITTALS

A. Provide all Submittals to Bureau of Reclamation, Attn: Bryan Lawlis, 555 Broadway

Blvd SE, Albuquerque, NM, 87102.

B. Submit illustrations of track mounted drill rig layout (5 copies, within 30 days of delivery).

C. Submit manufacturer’s catalog literature and product data sheets. Show dimensions, materials, and specification for track mounted drill equipment (5 copies, upon delivery).

D. Warranty information (1 copy upon delivery)

PART 2 PRODUCT

2.01 Drill rig Equipment DESIGN

A. The track mounted drill rig and equipment, within the accuracy specified below. Each rover and data collector shall comprise the following components:

1. Track mounted drill rig.

2. Hollow stem auger (HSA).

3. Standard penetrating test (SPT)

B. Components and configuration of the track mounted drill rig shall conform to a minimum of the following specifications:

Track mounted drill rig accessories

Tethered and wireless remote system

Rotating Mast top

48 in toolbox

Drop rack system with Rod Rack

Yoke vise and mounting Brackets

Field service kit

Nitrogen Charge kit

2 speed rotary head

Geoprobe Model GH 63 Hammer or equivalent

Winch/Mast assembly

Dimensions width 70 in

Length 133 in

Height (normal transportation) 100 in

Bureau of Reclamation

FOR OFFICIAL USE ONLY

Height (deployed; winch mast up)

187 in

Weight (w/ typical options) 9,560 lbs

Ground speed 5 mph

Track surface area 1656 in2

Drill Mast positioning

Extension 15 in

Lateral (side-to-side) 10 degrees

Oscillation 10 degrees

Drill mast dump 20 in

Rear Stabilizer width 60 in

Rear Stabilizer lift 2,000 lbs

Drill Mast specifications

Head Travel 78 in

Head Crowd Force 36,000 lbs

Head Pull force 48,000 lbs

Prime Mover & Hydraulic

Specs

Engine power (rated) 65/56 hp

Fuel Capacity (diesel) 17 gal

Max pressure 4,000 psi

Max Flow 40 gpm

Direct Push Hammer

Percussion Rate 32 Hz

Hammer Rotation Torque 560 ft-lb

Hammer Rotation Speed 200 rpm

Rotary Drive Options for 2 -speed Rotary Head

Rotation Torque (Range 1) 4,000 ft-lb

Rotation Speed 150 rpm

Hex Adapter 1.625 in

Primary Winch

Line Pull 2,500 lbf

Line Speed 125 fpm

Cable length 75 ft

C. HSA specifications:

General

Description Quantity

4.25 HSA Drive Cap 1-5/8 hex drive 1

Drive pin 2” HEX (2.875 TUBE) 3

4.25 HSA 60” (7-5/8 OD) 8

Bureau of Reclamation

FOR OFFICIAL USE ONLY

4.25 HSA Cutter Head 8.75 OD spade/bullet 1

HSA replacement lock bolt 6

4.25 HSA Wooden plug 10

4.25 HSA Auger fork 1

4.25 HSA Hoisting Cap asm 1

4.25 HSA side grip puller 1

D. SPT tooling specifications:

General

Description Quantity

3.75 Probe ROD 60” 8

3.75 exp pt holder 1

3.75 Exp pt asm 5

3.75 SPT shoe 2.85 ID 1

3.75 SPT Drive PT asm 1.50 PIN 2.8 OD 1

SPT Centering drive cap 1.5 1

Drive cap 3.75 THDLS GH60 series 1

3.75 Pull Cap 1

3.75 ROD wiper Donut 1

ROD Wiper Weldment 1

3.75 RHML Box Spring Assist lift Cap asm 1

PART 3 CONTRACTOR SERVICES

3.01 DELIVERY and WARRANTY

A. The drill rig and all equipment shall be delivered to BOR Socorro Field Office, 2401

State Road One, Socorro NM 87801, between February 1, 2024, and June 30, 2024.

The contractor shall coordinate the exact dates of delivery with Reclamation at least 1 week in advance.

B. The contractor shall protect all parts from corrosion, deformation, and other types of damage during storage, handling, and delivery. Damage to the systems during transit shall be repaired at the contractor’s expense.

C. The contractor shall provide adequate training on usage of all equipment purchased.

D. The contractor shall provide a standard commercial warranty on all parts and pieces of equipment.

File details come from the government source that posted it. Updated .