FL REMODEL OF 114 GOVERNMENT HOUSING
Solicitation number
140R4021Q0028
Issued by

View the file

Other files

File Type Posted
Sol_140R4021Q0028_Amd_0003.pdf PDF
Sol_140R4021Q0028_Amd_0002.pdf PDF
Amend 0001 questions_0001.pdf PDF
Sol_140R4021Q0028_Amd_0001.pdf PDF
Fontenelle Remodel Spec final.pdf PDF
SF24-(1).pdf PDF
Sol_140R4021Q0028.pdf PDF
Fontenelle Home Drawings photos.pdf PDF
LIncoln county DBA wages.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remodel of Government House #114 Solicitation No.140R4021Q0028

Table of Contents

00 01 10 - 1

SECTION C - DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 33 00 Submittals 01 35 10 Material Safety Data Sheets 01 35 20 Safety and Health 01 42 10 Reference Standards 01 51 00 Temporary Utilities 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 60 00 Product Requirements 01 74 10 Cleaning 01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 - CONCRETE

03 30 00 Cast-In-Place Concrete

DIVISION 04 - MASONRY

04 73 00 Manufactured Stone Masonry

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry 06 20 00 Finish Carpentry 06 41 30 Solid Surface Countertops

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation 07 27 00 House Wrap 07 31 13 Asphalt Shingles 07 46 19 Steel Siding 07 47 10 Metal Soffits

00 01 10 - 2

07 47 20 Metal Fascia 07 92 00 Sealants and Caulking

DIVISION 08 - OPENINGS

08 10 00 Doors and Frames 08 53 00 Vinyl Windows 08 71 00 Door Hardware

DIVISION 09 - FINISHES

09 29 00 Gypsum Wallboard 09 31 00 Interior Ceramic Tile - Thin Set 09 65 00 Resilient Plank Flooring 09 68 00 Carpet 09 90 00 General Painting Requirements 09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 74 46 Window Wells

DIVISION 12 - FURNISHINGS

12 32 00 Wood Casework

DIVISION 22 - PLUMBING

22 10 00 Plumbing Piping 22 41 00 Residential Plumbing Fixtures

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 31 00 Reconditioning Existing Forced Air Heating System 23 83 00 Electric Baseboard Heaters

DIVISION 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding 26 50 00 Lighting

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 10 House 114 Photos

00 01 10 - 3

DIVISION 52 - DRAWINGS

52 00 00 Drawings

END OF CONTENTS

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. The work is situated at Fontenelle, Wyoming about 50 miles northwest of Green River, Wyoming in Lincoln County. The Government house is located at the Reclamation Fontenelle Community located at 114 3rd St. Fontenelle, Wyoming.

1.02 PRINCIPAL COMPONENTS OF WORK

A. The principal components of work include remodeling a single-family residence Rambler Style 1 ½ bath, 3-bedroom 1200 sq. ft. home with an unfinished basement.

Including the following:

1. Demolition and removal of the home’s interior down to the studs, roofing, and siding.

2. Removal of wiring and plumbing including fixtures a.

3. Providing new roof

a. 16-inch overhangs will be added to roof on front and rear of the house and on the gable ends.

4. Providing new siding

a. Contractor will cover existing foam insulation with 7/16 OSB board and then wrap exterior house walls with Tyvek house wrap or approved equal.

All seams will be taped.

5. Providing new flooring

6. Providing new gypsum board, baseboard, casing, interior doors, and paint

7. New main panel board and wiring including bringing the electrical system up to current code.

a. New outlets and switches.

b. Install underground electrical service and meter base

8. Service existing Furnace and cleaning of existing ductwork. New registers.

01 11 00 - 2

9. New windows.

a. Enlarging the window size to 4 foot by 4 foot in the bedrooms and locating the base of the windows at the proper elevation above the floor for egress.

b. Replace window wells for basement windows

10. New doors.

a. Adding a doorway from the dining room into the garage.

11. Replacing kitchen components as indicated on the drawings.

a. Remove, store, and reinstall cabinets

b. New countertops and backsplash

12. Installing new kitchen and bathroom fixtures as indicated on the drawings.

a. Tub shower, toilets, sinks

13. Constructing front and back porch overhangs.

a. Front and rear porch roofs will be added to cover over existing concrete porch landings and steps, front approx. 6’ x 6’ x 6”, rear approx. 10’ x 9’.

Porches will match roof slope. See attached photos.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. Furnish: To supply products to the project site, including delivering ready for unloading and replacing damaged and rejected products.

B. Install: To put products in place in the work ready for the intended use, including unloading, unpacking, handling, storing, assembling, installing, erecting, placing, applying, anchoring, working, finishing, curing, protecting, cleaning, and similar operations.

01 11 00 - 3

C. Provide: To furnish and install products.

D. Indicated: Shown, noted, scheduled, specified, or drawn, somewhere in the contract documents.

E. Demonstrate: To show product performance or compliance in the presence of the Government Inspector.

F. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

G. Quality Assurance: Inspection and tests performed by Government to ensure compliance with the terms of the contract.

H. Quality Control: Activities performed by Contractor to ensure work conforms to contract requirements.

I. Contractor Quality Testing: Specified tests to be performed by the Contractor.

1. The Government may use the test results for Quality Assurance.

2. The Contractor may use the test results as part of Contractor quality control.

a. The Government anticipates that these tests will be part of the Contractor’s quality control program; however, the tests do not relieve the Contractor of providing adequate quality control measures in accordance with the clause at FAR 52.246-12, Inspection of Construction.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

1.06 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 11 00-1, Schedule of Values:

1. For progress payment purposes, submit a detailed schedule of values listing the cost of each item.

PART 2 PRODUCTS

Not Used

01 11 00 - 4

PART 3 EXECUTION

01 11 00 - 4

END OF SECTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 PROJECT CONDITIONS

A. Government land as shown on drawings may be used for required construction facilities.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Two RV lots will be made available on site with 110v 50-amp single phase connections, potable water, and sewer to support trailers supplied by the Contractor for housing construction personnel.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment: Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species. Applies to equipment used to convey roofing materials to the top of the roof and similar equipment.

Use of Site 01 14 10 - 2

3.02 RESTORATION

A. Restore yard and surrounding area to original or better condition after completion of work.

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:

1. A – Approval:

a. Government will approve or disapprove these submittals.

b. Approval submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.

2. I – Informational:

a. The Government will acknowledge receipt of these submittals.

b. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.

c. Informational submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by the Government is not required,

1.03 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

01 33 00 - 2

2. Label with contract number and title, and RSN.

3. Measurement units: US Customary Units.

C. Drawings:

1. Minimum identification in title block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

c. Date.

2. Provide space next to title block for review stamps.

3. Size: D size (22 inches by 34 inches).

4. Draw to scale with neat lettering using drafting equipment or computer drafting equipment.

5. Final drawings:

a. AUTOCAD® format (.dwg) on CD-ROM disc.

b. Original D size (22 inches by 34 inches) plots.

c. Show as-built changes, including revision dates, made during installation.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

E. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

F. Manuals:

1. Copies: Bound and indexed

2. Contents:

01 33 00 - 3

a. Parts identification lists, lists of special tools, and accessories.

b. Schematics and wiring diagrams.

c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.

d. As-built drawings, photographs, and test records or reports if required by the specifications.

G. Photographs:

1. Prints: Professional quality 8-inch by 10-inch color for each listed view.

a. Identify with adhesive labels on back.

1) Include contract number, name of equipment and view title.

2) Do not type directly on back of photograph.

2. Include negatives, or digital files on CD in .jpeg or similar format.

H. Samples and Color Selection Submittals:

1. Label with complete manufacturer's product and color identification.

2. Include type and quantity of materials specified in the referenced section in each “set” of samples.

3. Samples: Representative of product to be installed.

4. Color chips: Sample paint chips. Ink color reproductions are not acceptable.

5. Label each sample, sample kit, set of color chips, or color chart with contract number and title.

6. The Government will select architectural color and pattern after product approval.

1.04 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit number of sets specified in “No. of sets to be sent to:” columns in Table 01 33 00A - List of Submittals.

D. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for each attached submittal.

01 33 00 - 4

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.

1.05 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 14 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.

a. The time extension will be to the extent that excess review time caused delay to the contract completion date.

b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.

2. No time extension will be allowed if the Contractor fails to make complete approval submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to the extent that:

a. Approval was required under the contract, and

b. Requests for approval were properly and timely submitted and were approved.

C. Return of Submittals:

1. One set of submittals required for approval will be returned either approved, approved subject to identified changes, or not approved.

2. Submittals not approved:

a. Revise and resubmit for approval.

b. Show changes and revisions with revision date.

01 33 00 - 5

c. Describe reasons for significant changes in transmittal letter.

d. Resubmit returned submittals within 7 days after receiving the comments, unless otherwise specified.

e. Requirements for initial submittals apply to resubmittals.

3. Do not change designs without approval of the CO after approval drawings, documentation, and technical data have been approved.

4. The Government will acknowledge Informational submittals.

a. Informational submittals will not be returned when they comply with the specifications.

b. Informational submittals that do not comply with the specifications may be returned for resubmittal or additional information may be requested.

1.06 TRANSMITTAL

A. Addresses for codes listed in Table 01 33 00A - List of Submittals:

1. Contracting Officer, Bureau of Reclamation, Attention UC 840, 125 South State Street, Room 6107, Salt Lake City, UT 84138-1147

2. Facility Manager, FG-100, Bureau of Reclamation, Flaming Gorge Field Division, P.O. Box 278, Dutch John, Utah 84023-0278

B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A – List of Submittals.

C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code, but show “No. of sets to be sent to” in Table 01 33 00A – List of Submittals.

D. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.

E. Submittals required by the specifications, but not listed in Table 01 33 00A - List of Submittals:

1. Submit in accordance with this section.

PART 2 PRODUCTS

Not Used

01 33 00 - 6

Table 01 33 00A. - List of Submittals

* Submittal types: A – Approval, I – Information ** CO indicates Contracting Officer and FM indicates Facility Manager.

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Type

Respon-sible code

No. of sets to be sent to: **

CO FM

I-1 Safety and Health (WBR 1452.223-81)

Safety program Submitted and accepted before commencing onsite work. See section 3 of RSHS

A FM 1 0

I-2 Safety and Health (WBR 1452.223-81)

Monthly accident summary report

First day of each month.

See paragraph 3.8 of

RSHS.

I CO 1 0

01 11 00-1 Summary of Work

Schedule of Values At least 7 days before starting work

A AM 1 4

01 35 10-1 Material Safety Data Sheets

Complete LHM and

MSDS

At least 14 days before jobsite delivery of hazardous material

I FM 1 1

01 35 10-2 Material Safety Data Sheets

Updated LHM and

MSDS

At least 14 days before jobsite delivery of hazardous material not previously listed

I FM 1 1

01 35 20-1 Safety and Health

Safety Program Submitted and approved before start of operations

A FM 1 1

01 35 20-2 Safety and Health

Monthly accident summary report

Within 5 days after the end of each month

A FM 1 1

01 74 10-1 Cleaning Waste production and disposal records

Within 7 days of waste disposal

I FM 0 1

01 74 10-2 Cleaning Hazardous waste manifest

Within 7 days of hazardous waste disposal

I FM 0 1

01 78 40-1 Project Record Documents

Final As-built drawings

Within 14 days of completion of work

I FM 0 1

02 41 00-1 Demolition Photographs Before starting work I FM 1 1 03 30 00-1 Cast-in-Place

Concrete Mix Design At least 7 days prior to the use of the concrete mix

A FM 0 1

06 41 30-1 Solid Surface Countertops

Approval Drawings, Data, and Sample Kit

Before purchase A FM 0 1

06 41 30-2 Solid Surface Countertops

Instructions Before installation A FM 0 1

07 27 00-1 House Wrap Product data and sample

Before purchase A FM 0 1

07 46 19-1 Steel Siding Product data and sample

Before purchase A FM 0 1

08 10 00-1 Doors and Frames

Product Data Before purchase A FM 0 1

01 33 00 - 7

Table 01 33 00A. - List of Submittals

* Submittal types: A – Approval, I – Information ** CO indicates Contracting Officer and FM indicates Facility Manager.

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Type

Respon-sible code

No. of sets to be sent to: **

CO FM

08 53 00-1 Vinyl Windows

Shop drawings, product data, handling instructions

Before purchase A FM 0 1

08 71 00-1 Door hardware Hardware schedule, Product data, installation instructions

Before purchase A FM 0 1

09 65 00-1 Plank Flooring Product and Data Sample

Before Purchase A FM 0 1

09 65 00-2 Plank Flooring Quality Assurance/Control

After shipment and before installation

A FM 0 1

09 68 00-1 Carpet Product Data and Samples

Before purchase A FM 0 1

09 68 00-2 Carpet Quality Assurance/Control

After shipment and before installation

A FM 0 1

09 90 00-1 Paint Product Data, Samples

Before purchase A FM 0 1

10 74 46-6 Window Wells Product Data Before purchase A FM 0 1 12 32 00-1 Wood

Casework Product Data 14 days Before purchase

A FM 0 1

22 41 00-1 Residential Plumbing Fixtures

Cut sheets Before purchase A FM 0 1

23 31 00-1 Reconditioning Existing Forced Air Heating System

Ductwork repair materials

Before purchase A FM 0 1

23 83 00-1 Electric baseboard units

Manufacturer’s data Before purchase A FM 0 1

26 05 02-1 General Electrical Requirements

Names of licensed electricians

Prior to starting work A FM 0 1

26 05 02-2 General Electrical Requirements

Product Data Prior to purchase A FM 0 1

01 33 00 - 8

Material Safety Data Sheets

01 35 10 - 1

SECTION 01 35 10

MATERIAL SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials

B. MSDS: Material Safety Data Sheet.

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 10-1, Complete LHM and MSDS.

C. RSN 01 35 10-2, Updated LHM and MSDS:

1.04 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on the original or previously updated LHM and MSDS before receipt of updated LHM and MSDS by Area Manager.

PART 2 PRODUCTS

Not Used

Material Safety Data Sheets

01 35 10 - 2

Safety and Health

01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in the prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rshs.html

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 20-1, Safety Program:

1. Written safety program in accordance with of RSHS.

2. Cover aspects of on site and applicable off-site operations and activities associated with this contract.

3. Follow the outline in Appendix B of RSHS

4. Will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline. For items in the outline that do not apply to this contract write “Not applicable to Contract” next to the number/letter.

5. A generic company safety program is not acceptable. Safety Program must be site specific for this contract.

6. Submitted and accepted prior to commencing onsite work, including mobilization.

C. RSN 01 35 20-2, Monthly Accident Summary Report:

1. In accordance of RSHS.

1.04 DOCUMENTATION AND RECORDS

A. Prepare and retain all safety plans, programs, training content, and training records that are applicable to the scope of the work and make them available to the COR http://www.usbr.gov/ssle/safety/RSHS/rshs.html

01 35 20 - 2 unless they are already included in the written safety program. Some examples include but are not limited to:

1. Forklifts and Other Industrial Trucks Training Records.

2. Electrical Safety Requirement Training Records.

3. Emergency Action Plans Written Program and Training Records.

4. General Safety and Health Provisions, Written Safety Program, and Regular

Safety Inspection Records.

5. Lockout/Tagout: Refer to RSHS Section 15 Hazardous Energy Control

Program (HECP) Training Records.

6. Bloodborne Pathogens Exposure Control Plan, Training Records.

7. Power Operated Hand Tools Training Records.

8. Respiratory Protection Written Program and Training Records.

9. Safety Training and Education Written Program and Training Records.

10. Welding, Cutting, and Brazing Written Program and Training Records.

1.05 SAFETY AND HEALTH

A. Provide and maintain a work environment and procedures that:

1. Safeguard the public and Government's personnel, and Contractor employees exposed to Contractor operations and activities.

2. Avoid interruptions of site operations and delays in project completion dates.

3. Control costs in contract performance.

B. Do not begin on site work, including mobilization, until the COR accepts the Safety Program.

C. Participate in Contractor Safety Program Review meeting prior to mobilization.

D. Minimum work crew shall consist of no less than two (2) people, unless approved by

COR.

E. Develop Job Hazard Analyses for each distinct phase of work under the contract.

1. Do not begin a phase of work until a JHA is acceptable to COR and shared with construction employees.

2. Activities involving hazardous materials shall have the appropriate Safety

Data Sheet(s) attached to the JHA.

F. Comply with RSHS.

1. One copy of RSHS in digital format will be provided at no charge for use in connection with the specifications.

01 35 20 - 3

G. Correct safety and health violations identified by the CO or the COR.

H. When the Contractor fails or refuses to correct a compliance directive, the CO may issue an order to stop all or part of the work.

1. When satisfactory corrective action is taken, an order to resume work will be issued.

2. The Contractor shall not be entitled to extension of time or to claim for damage or to additional compensation by reason of either the directive or stop order.

3. Failure of the CO to order discontinuance of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.

I. Maintain accurate record of and report to the CO the following occurrences during performance of this contract:

1. Death.

2. Occupational disease.

3. Traumatic injury to employees or the public.

4. Property damage in excess of $2,500.

J. Provide appropriate safety barricades, signs, and warnings

K. The Contractor shall be responsible for providing medical and emergency assistance in a timely manner consistent with recognized emergency protocols.

L. In instances where local emergency responders are not readily available, the responsibility to provide emergency services shall default back to the Contractor.

PART 2 PRODUCTS

Not Used

01 35 20 - 4

Reference Standards 01 42 10 - 1

SECTION 01 42 10

REFERENCE STANDARDS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Referenced editions of standard specifications, codes, and manuals form a part of this specification to the extent referenced.

B. These specifications take precedence when conflicting requirements occur between specifications and referenced standard.

1.03 JOBSITE REFERENCE STANDARDS

A. Maintain at fabrication site, access to referenced standard specifications, codes, and manuals required for work in progress at fabrication site. Make available for use by the Government.

B. Maintain onsite, access to referenced standard specifications, codes, and manuals required for onsite work in progress. Make available for use by the Government.

1.04 AVAILABILITY

A. Code of Federal Regulations (CFR):

1. Available online, authorized by the National Archives and Records

Administration (NARA) and the Government Printing Office (GPO), at http://www.gpo.gov/fdsys/search/home.action

B. Federal Specifications, Standards, and Commercial Item Descriptions; and Military Specifications:

1. Copies of Federal Specifications, Standards, and Commercial Item Descriptions may be obtained from GSA Federal Supply Service, see the provision at FAR 52.211-1, Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29.

2. Copies of Military Specifications may be obtained from Department of Defense, see the provision at FAR 52.211-2, Availability of Specifications, Standards, and http://www.gpo.gov/fdsys/search/home.action

01 42 10 - 2

Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST).

C. Bureau of Reclamation Documents:

1. Reclamation Safety and Health Standards (RSHS) may be downloaded at https://www.usbr.gov/safety/rshs/index.html.

a. Hard copies of RSHS, stock number 024-003-00204-6, may be purchased from The Superintendent of Documents at the U.S. Government Printing Office (GPO), phone number 202-512-1800. Hard copies of RSHS are subject to revisions posted on the site shown above.

1) GPO online bookstore:

http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber= 024-003-00204-6.

2. Bureau of Reclamation manuals and other publications including significant scientific, technical, and engineering works are available from the National Technical Information Service (NTIS). Information regarding availability and pricing may be obtained by contacting NTIS at the following address:

United States Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-487-4650 or 1-800-553-6847

D. Industrial and Governmental Documents:

1. When a reference has a joint designation (e.g. ANSI/IEEE) these specifications generally cite the proponent organization (e.g. IEEE).

2. Addresses for obtaining industrial and governmental (other than Federal and

Bureau of Reclamation specifications and standards) specifications, standards, and codes are listed in Table 01 42 10A - Addresses for Specifications, Standards, and Codes.

Table 01 42 10A - Addresses for Specifications, Standards, and Codes

Acronym Name and Address Telephone

ACI American Concrete Institute 38800 Country Club Dr.

Farmington Hills, MI 48331-3439 https://www.concrete.org/home.aspx”

248-848-3700 http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6 http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6 https://www.concrete.org/home.aspx

01 42 10 - 3

Table 01 42 10A - Addresses for Specifications, Standards, and Codes

Acronym Name and Address Telephone

AEIC Association of Edison Illuminating Companies PO Box 2641 Birmingham, AL 35291-0992 http://aeic.org/

205-257-3839

AGC Associated General Contractors of America 333 John Carlyle Street, Suite 200 Alexandria, VA 22314 www.agc.org

703-548-3118

AISC American Institute of Steel Construction One East Wacker Drive, Suite 3100 Chicago, IL 60601-2001 www.aisc.org

312-670-2400

ANSI American National Standards Institute 1819 L. Street, NW.

Washington, DC 20036 www.ansi.org

202-293-8020

APA/EWA APA-The Engineered Wood Association P.O. Box 11700 Tacoma, WA 98411-0700 www.apawood.org

253-565-6600

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers 1791 Tullie Circle, N.E. Atlanta, GA 30329 https://www.ashrae.org/

800-527-4723

ASME American Society of Mechanical Engineers 3 Park Avenue New York, NY 10016-5990 www.asme.org

800-843-2763

ASTM ASTM International P.O. Box C700 100 Barr Harbor Drive West Conshohocken, PA 19428-2959 www.astm.org

610-832-9585

AWS American Welding Society 550 NW LeJeune Road Miami, FL 33126 www.amweld.org

800-443-9353 305-443-9353 http://aeic.org/ http://www.agc.org/ http://www.aisc.org/ http://www.ansi.org/ http://www.apawood.org/ https://www.ashrae.org/ http://www.asme.org/ http://www.astm.org/ http://www.amweld.org/

01 42 10 - 4

Table 01 42 10A - Addresses for Specifications, Standards, and Codes

Acronym Name and Address Telephone

ICC International Code Council 5203 Leesburg Pike, Suite 600 Falls Church, VA 22041 www.intlcode.org

(703) 931-4533

IEEE Institute of Electrical and Electronics Engineers 3 Park Avenue,17th Floor New York, NY 10016-5997 www.ieee.org

212-419-7900

NACE NACE International 1440 South Creek Drive Houston, TX 77084 www.nace.org

281-228-6200

NEMA National Electrical Manufacturers Association 1300 N 17th Street, Suite 1847 Rosslyn, VA 22209 www.nema.org

703-841-3200

NETA International Electrical Testing Association Inc.

3050 Old Centre Ave., Suite 102 Portage, MI 49024 http://www.netaworld.org/

269-488-6382

NFPA National Fire Protection Association One Batterymarch Park P.O. Box 9101 Quincy, MA 02269-9101 www.nfpa.org

800-344-3555 617-770-3000

NIBS National Institute of Building Sciences 1090 Vermont Avenue, NW., Suite 700 Washington, DC 20005-4905 www.nibs.org

202-289-7800

SSPC SSPC: The Society for Protective Coatings 40 24th Street, 6th Floor Pittsburgh, PA 15222-4656 www.sspc.org

800-837-8303 412-281-2331

UL Underwriters Laboratories, Inc.

333 Pfingsten Road Northbrook, IL 60062-2096 www.ul.com

847-272-8800 http://www.ieee.org/ http://www.nace.org/ http://www.nema.org/ http://www.netaworld.org/ http://www.nfpa.org/ http://www.nibs.org/ http://www.sspc.org/ http://www.ul.com/

01 42 10 - 5

PART 2 PRODUCTS

Not Used

01 42 10 - 6

Temporary Utilities

01 51 00 - 1

SECTION 01 51 00

TEMPORARY UTILITIES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE C2-2007 National Electrical Safety Code (NESC)

1.03 TEMPORARY ELECTRICITY

A. The Government has one 110v single phase 20amp circuit duplex receptacle available for Contractors use. Power requirements in excess of this shall be provided by the Contractor. No charge will be made for power obtained from this source.

B. Provide generators, transmission lines, distribution circuits, transformers, and other electrical equipment and facilities required for obtaining power and distributing power to points of use.

C. Comply with IEEE C2 clearances and spacing for temporary communications and supply lines.

D. Remove temporary equipment and facilities upon completion of work under this contract.

1.04 TEMPORARY WATER

A. Water from the service water system within Fontenelle Community will be available for construction purposes.

1. Make arrangements with CO for use of water.

2. The Government will designate locations from which water may be obtained.

3. No charge will be made for water obtained from this source.

B. Use water which meets specified requirements for water used in concrete, soil-cement, masonry, grouting, and other permanent work.

C. Provide means of conveying water to points of use.

Temporary Utilities

01 51 00 - 2

D. Remove temporary equipment and facilities upon completion of work under this contract.

1.05 TELEPHONE

A. Cell phone service is available in the area.

1.06 RESTROOMS

A. Contract with a local vendor to provide portable restrooms.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Protection of Existing Utilities

01 56 15 - 1

SECTION 01 56 15

PROTECTION OF EXISTING UTILITIES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS-2009 Reclamation Safety and Health Standards

B. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE C2-2012 National Electrical Safety Code (NESC)

1.03 PROJECT CONDITIONS

A. Drawings included in these specifications show existing utilities, but may not show all utilities existing at the jobsite.

B. Obtain location of buried conduit, pipe, cable, ground mat, and other buried items before excavating.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 INTERFERENCE WITH OPERATION OR MAINTENANCE

A. Do not interfere with operation or maintenance service on utilities, existing on date offers are received.

1. Provide for access to utilities in a manner satisfactory to owners and operators and the Government.

B. Provide required temporary structures; make necessary repairs, replacements, or similar operations; and furnish indemnity or other bonds.

Protection of Existing Utilities

01 56 15 - 2

Environmental Controls

01 57 20 - 1

SECTION 01 57 20

ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in the prices offered in the schedule for other items of work, except as specified.

2. Costs for damages and work stoppage are the Contractor's responsibility.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS-2009 Reclamation Safety and Health Standards

1.03 REGULATORY REQUIREMENTS

A. Comply with Federal, State, and local laws and regulations.

B. Comply with RSHS.

C. Conform to most stringent requirement in cases of conflict between specifications, regulatory requirements, and RSHS.

D. Contractor shall be responsible for damages resulting from dust originating from Contractor operations in accordance with clause at FAR 52.236-7, Permits and Responsibilities.

E. The CO may stop any construction activity in violation of Federal, State, or local laws and additional expenses resulting from work stoppage will be responsibility of Contractor.

1.04 DUST CONTROL

A. Provide dust control and abatement during performance of work.

B. Prevent, control, and abate dust pollution on rights-of-way provided by Government or elsewhere during performance of work.

C. Provide labor, equipment, and materials, and use efficient methods wherever and whenever required to prevent dust nuisance or damage to persons, property, or activities.

Environmental Controls

01 57 20 - 2

D. Provide means for eliminating atmospheric discharges of dust during mixing, handling, and storing of cement, pozzolan, and concrete aggregate.

1.05 AIR POLLUTION CONTROL

A. Use reasonably available methods and devices to prevent, control, and otherwise minimize atmospheric emissions or discharges of air contaminants.

B. Do not operate equipment and vehicles that show excessive exhaust gas emissions until corrective repairs or adjustments reduce such emissions to acceptable levels.

1.06 NOISE CONTROL

A. Do not exceed noise levels of 40 decibels (nighttime) and 85 decibels (daytime), as measured from noise-sensitive areas such as residences and schools.

B. Only construction activities approved by COR will be allowed during hours of 5:30 p.m. to 7:00 a.m.

1.07 LIGHT CONTROL

A. Direct stationary floodlights to shine downward at an angle less than horizontal.

B. Shield floodlights so that floodlights will not be a nuisance to surrounding areas.

C. Direct lighting so that residences are not in direct beam of light.

D. Correct lighting control problems when they occur as approved by the COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Product Requirements

01 60 00 - 1

SECTION 01 60 00

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. When the Price Schedule includes a separate item for furnishing a material, include cost of furnishing, hauling, storing, and handling in the price offered in the Price Schedule for the item.

2. When the Price Schedule does not include a separate item for furnishing a material, include cost of furnishing, hauling, storing, and handling in the price offered in the Price Schedule for work for which the material is required.

1.02 DEFINITIONS

A. Essential Characteristics: As used in these specifications, the term "essential characteristics" is synonymous with the term "salient characteristics."

B. Salient Characteristics: Those qualities of an item that are essential to ensure that the intended use of the item can be satisfactorily realized.

1.03 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME B1.1-2003(2008) Unified Inch Screw Threads, (UN and

UNR Thread Form)

2. ASME B1.20.1-2013 Pipe Threads, General Purpose, Inch

B. Bureau of Reclamation (USBR)

1. RSHS-09 Reclamation Safety and Health

Standards, including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/r shs.html

1.04 DELIVERY, STORAGE, AND HANDLING

A. Transport and handle manufactured products in accordance with manufacturer's instructions.

01 60 00 - 2

B. Store and protect manufactured products in accordance with manufacturer's instructions and RSHS. Obtain instructions from the manufacturer before delivery of materials to jobsite. Maintain a copy of instructions at jobsite.

C. Protect materials from adverse effects of moisture, sunlight, ultraviolet light, or weather during storage at jobsite.

D. Remove and replace damaged items with new items.

E. Store curing compounds, sealants, adhesives, paints, coatings, sealers, joint compounds, grouts, and similar products at the temperature and environmental conditions recommended by manufacturer.

PART 2 PRODUCTS

2.01 MATERIALS

A. Provide materials required for completion of work.

B. Provide type and quality described in these specifications. Make diligent effort to procure specified materials from all available sources.

C. Furnish new materials conforming to referenced standards unless otherwise specified.

1. References to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use equipment, material, article, or process that, in the judgment of the CO, is equal to that named in the specifications, unless otherwise specified.

D. For materials not covered by these or referenced specifications, furnish materials of standard commercial quality.

E. If materials to be used deviate from or are not covered by recognized specifications and standards, submit, for approval, justification for and exact nature of the deviation, and complete specifications for materials proposed for use.

F. Make parts accurately to standard gauge where possible.

1. Use unified screw threads conforming to ASME B1.1 or B1.20.1 for threads, including but not limited to those of bolts, nuts, screws, taps, pipes, and pipefittings.

2. For internal connections only, the Contractor may deviate from ASME standards, provided a complete set of taps and dies are furnished as required to facilitate repair or replacement.

01 60 00 - 3

G. Permanently mark fasteners with a symbol identifying the manufacturer and with symbol(s) indicating grade, class, type, and other identifying marks in accordance with reference or applicable standard.

2.02 SUBSTITUTIONS

A. If materials required by these specifications become unavailable, because of Government priorities or other causes, substitute materials may be used.

B. Obtain written approval to use substitute materials from the CO. State in the request for approval the amount of the adjustment, if any, to be made in favor of the Government.

C. The Government's determination as to whether substitution will be permitted and as to what substitute materials may be used, shall be final and conclusive.

D. If approved substitute materials are of less value to the Government or involve less cost to the Contractor than specified material, a contract adjustment will be made in favor of the Government. Where the amount involved or the importance of substitution warrants, a deductive modification to the contract will be issued.

E. No payments in excess of prices offered in the Price Schedule will be made because of substitution of one material for another or because of use of one alternate material in place of another.

2.03 WORKMANSHIP

A. Accurately manufacture and fabricate materials in accordance with best modern practice and requirements of these specifications, notwithstanding minor errors or omissions therein.

B. Use liberal factors of safety and adequate shock-absorbing features in designs, especially for parts subjected to variable stress or shock, including alternating or vibrating stress or shock.

C. Include provisions which prevent components from loosening for shock-absorbing features and parts subject to vibration.

2.04 GOVERNMENT CONTRACT SOURCE QUALITY ASSURANCE

A. Materials will be subject to inspection in accordance with clause at FAR 52.246-12 “Inspection of Construction” at following locations, as determined by the CO:

1. At place of production or manufacture.

2. At shipping point.

3. At jobsite.

01 60 00 - 4

B. To allow sufficient time to provide for inspection, submit at time of issuance, copies of purchase orders, including drawings and other pertinent information, covering material on which inspection will be made as advised by the CO, or submit other evidence if such purchase orders are issued verbally or by letter.

C. Inspection of materials at locations specified above or waiving of inspection shall not be construed as being conclusive as to whether materials and equipment conform to contract requirements under the clause at FAR 52.246-12 “Inspection of Construction,” nor shall the Contractor be relieved thereby of the responsibility for furnishing materials meeting the requirements of these specifications.

D. Acceptance of materials will be made only at the jobsite.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install products in accordance with manufacturer’s recommendations unless otherwise specified.

3.02 GOVERNMENT CONTRACT FIELD QUALITY ASSURANCE

A. Final inspection and acceptance of materials will be made only at the jobsite after installation and testing.

Cleaning

01 74 10 - 1

SECTION 01 74 10

CLEANING

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work except as specified.

2. Cost of environmental site assessments are the Contractor’s responsibility.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS-2009 Reclamation Safety and Health Standards

B. Code of Federal Regulations (CFR)

1. 40 CFR 261.3 Definition of Hazardous Waste

2. 49 CFR 171-179 Transportation - Hazardous Waste Regulations

1.03 DEFINITIONS

A. Hazardous waste: Defined as hazardous by 40 CFR 261.3; or by other Federal, State, or local laws or regulations.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 74 10-1, Waste production and disposal records.

1. Include certifications.

C. RSN 01 74 10-2, Hazardous wastes manifest.

1.05 REGULATORY REQUIREMENTS

A. Comply with Federal, State, and local laws and regulations.

B. Comply with RSHS.

C. Conform to most stringent requirement in cases of conflict between specifications, regulatory requirements, and RSHS.

01 74 10 - 2

1.06 PROJECT CONDITIONS

A. Report waste materials discovered at jobsite to COR.

1. Cease work in areas where waste may be hazardous until waste materials are investigated by the Government.

2. If waste is hazardous, the CO may order delays in time of performance or changes in work, or both.

3. If such delays or changes are ordered, an equitable adjustment will be made in the contract in accordance with applicable clauses of the contract.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 PROGRESS CLEANING

A. Keep work and storage areas free from accumulations of waste materials and rubbish.

3.02 FINAL CLEANUP

A. Remove temporary plant facilities, buildings, concrete footings and slabs, rubbish, unused materials, concrete forms, and other similar materials which are not part of permanent work.

B. Leave premises "broom clean."

C. Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains and foreign substances; polish transparent and glossy surfaces; vacuum carpeted and soft surfaces.

D. Clean equipment and fixtures to a sanitary condition.

E. Replace filters of operating equipment.

F. Clean debris from roofs, gutters, downspouts and drainage systems.

G. Sweep paved areas and rake clean landscaped areas.

3.03 DISPOSAL

A. Nonhazardous Waste Disposal:

1. Dispose by removal from jobsite.

01 74 10 - 3

2. Recycle materials whenever possible.

3. Dispose of nonhazardous waste materials that are not recycled at appropriately permitted disposal facilities.

4. Combustible waste materials: Dispose by removal from jobsite

5. Noncombustible waste: Dispose by burying or by removal from jobsite.

6. Disposal by Removal:

a. Dispose of waste materials at a permitted landfill. Make arrangements with owner for use of landfill and pay required fees.

7. Do not burn waste materials.

8. Disposal by burying.

a. Bury only clean fill waste materials approved by the COR.

b. Bury waste materials in disposal areas as directed or approved by the

COR. Cover waste materials with earth to a minimum depth of 2 feet.

B. Hazardous Waste Disposal:

1. Dispose by removal from jobsite.

2. Recycle hazardous waste whenever possible.

3. Dispose of hazardous waste materials at appropriately permitted treatment or disposal facilities.

4. Transport hazardous waste in accordance with 49 CFR 171-179.

C. Certification: Certify that wastes are disposed of in accordance with Federal, State, and local regulations.

3.04 SITE ASSESSMENT

A. Upon completion of work, perform site assessment at following areas for work done under these specifications:

1. Hazardous waste accumulation areas.

2. Petroleum dispensing and storage areas, and hazardous material storage areas where aggregate storage of petroleum or hazardous materials at jobsite was over 110 gallons.

B. Employ qualified environmental consultant to perform assessments.

C. Demonstrate and document by appropriate analytical sampling that site contamination is less than State action cleanup levels.

01 74 10 - 4

3.05 RECORDS

A. Keep records of types and amounts of waste materials produced.

B. Keep records of waste material disposal.

Project Record Documents

01 78 30 - 1

SECTION 01 78 30

PROJECT RECORD DOCUMENTS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 78 30-1, Final As-built Drawings:

1. Marked sets signed by the Contractor.

1.03 RECORD DRAWINGS

A. Maintain 1 set of full-size prints of contract drawings marked to show accurate and complete records of as-built conditions. Keep drawings at the jobsite and mark as work progresses.

1. Mark and dimension to show variations between actual construction and that indicated or specified in contract documents.

a. Include buried or concealed construction and utilities.

b. Include existing items, topographic features, and utility lines revealed during construction which differ from those shown on contract drawings.

2. Mark to define construction actually provided where choice of materials or methods is permitted in specifications, or where variations in scope or character of work from that of the original contract are authorized.

B. Use standard drafting practice to represent changes and include supplementary notes, legends, and details necessary to clearly portray as-built construction.

C. Mark as-built drawings in the following colors:

1. Red - Additions to original drawings.

2. Green - Deletions to original drawings.

3. Blue - Notations necessary for explanation of as-built markings.

D. Allow the Government to review the drawings at all times.

Project Record Documents

01 78 30 - 2

E. Upon completion of work, sign marked prints as certified correct.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Demolition 02 41 00 - 1

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.01 PAYMENT

A. Demolition

1. Payment: Lump sum price offered in the schedule.

a. Includes the cost of preparing and submitting all required submittals, and all other labor, and equipment.

1.02 SUMMARY

A. Section Includes:

1. Demolition and removal of selected site and building elements as follows:

a. Interior demolition of walls to wall studs

b. Floor coverings down to sub floor

c. All roofing material will be removed down to roof sheathing,

d. All basement walls will be removed except for load bearing walls and walls around the mechanical room.

e. Metal siding

f. Windows

g. Exterior and interior doors

h. Shelving

i. All gypsum board, except the gypsum board on the interior ceiling

j. All electrical including main distribution panel and wiring

k. Kitchen sinks, counter tops, bathroom sinks, toilets, tub shower, flooring, and all inside plumbing.

1) The water supply lines shall be removed beginning at the main water supply shut off valve located in the basement.

2) The sanitary drainage and venting shall be removed beginning at the main cast iron drain located in the basement.

l. Electrical Service to house will be moved and upgraded.