Sol_140R4021Q0006_Amd_0001.pdf
PDF 91 KB Posted
- Attached to
- R22 Electrical Installation of tank mixers
- Solicitation number
- 140R4021Q0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R4021Q0006_Amd_0002.pdf | ||
| 140R4021Q0006 Solicitation.pdf | ||
| Sol_140R4021Q0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4021Q0006 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
12/14/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/14/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment One issued to extend the solicitation close date, provide Site Visit update and include Q&A to-date:
Site Visit rescheduled to January 21, 2021 at 9:30 a.m. Meeting place is at at Farmers
Market, Bloomfield NM.
Solicitation date extended from January 22, 2021 to January 29, 2021 at 12 noon MST.
Q&A:
1. For wages, the only electrical wages we saw were under code 23160 - Electrician
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Ashton Jones
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021Q0006/0001
Maintenance. This being a new installation is that the correct wage determination we will be using for this project? I didn't see a wage for apprentices or other classifications. How are wage rates obtained for occupations not listed in the wage determination?
Answer: Any class of service employee not listed in the wage determination must be classified by the contractor to provide a reasonable relationship (i.e. appropriate level of skill comparison) between the unlisted classifications and the classifications listed in the wage determination. How should a conformance be submitted, and if approved, when does the rate become applicable? A class of service employee not listed in the wage determination must be classified by the contractor to provide a reasonable relationship (i.e. appropriate level of skill comparison) between the unlisted classifications and the classifications listed in the wage determination. The conformance procedure for the unlisted class must be submitted by the contractor to the contracting officer no later than 30 days after the unlisted class of employee performs any contract work. The contracting officer then reviews the proposed action and submits the conformance with their concurrence, and/or comments to the Wage and Hour Division, U.S. Department of Labor, for approval. The Wage and Hour Division will approve, modify, or disapprove the action or render a final determination in the event of disagreement within
30 days of receipt or will notify the contracting officer within 30 days of receipt that additional time is necessary. If approved, the wage and fringe benefits must be paid to all employees performing in the classification from the first day the contract work is performed. Regardless of whether the contracting officer agrees or disagrees, they must submit the conformance request to the Department of Labor for determination. However, the contracting officer can annotate that they disagree with the conformance request.
2. For conduit, it states all conduit must be plastic-coated rigid steel conduit, but on the drawings on the general notes it states exposed conduit to be rigid metallic conduit (RMC). For cost savings RMC would be a cheaper above ground
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4021Q0006/0001 installation cost, it is galvanized and designed for outdoor use.
Answer: All conduit shall be plastic-coated rigid steel. Exposed and buried.
3.For the 20-amp GFCI breakers, they are not on the Government-furnished property list so we are assuming we will be providing those so a Brand of the panelboard would be needed to ensure the correct breakers are installed/purchased.
Answer: All materials shall be furnished by contractor except for those listed on the government furnished equipment list in the statement of work.
4. What are the dates of performance for this project? On the SF1449 there is a period of performance of 02/01/2021 to 03/31/2021 just confirming this will need to be completed prior to 03/31/2021 for scheduling purposes.
Answer: All work shall be completed by 3/31/2021.
Legacy Doc #: BOR
Period of Performance: 02/01/2021 to 03/31/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .