FedConnect File
41 KB Posted
- Attached to
- Chama SCADA ReplacementSan Juan-Chama Project, C
- Solicitation number
- 140R4019Q0065
About this file
This solicitation seeks proposals for a service contract to replace the existing Supervisory Control and Data Acquisition system for the San Juan-Chama Project. The Bureau of Reclamation's Chama Field Division requires a new SCADA system to provide control and monitoring capabilities at six sites, including the Chama Field Office as the master station location, Heron Dam, El Vado Dam, Blanco Diversion Dam, Oso Diversion Dam, and Little Oso Diversion Dam. The contractor must provide all necessary equipment, software, installation, testing and commissioning, training, and maintenance services. Proposals are due by September 27, 2019. The work will take place within a 40-mile radius of the Chama Field Division in Rio Arriba County, New Mexico and Archuleta County, Colorado. The North American Industry Classification System code is 541512 for computer system design services. A mandatory site visit is scheduled for August 21, 2019.
Click here to see more information about this opportunity on FedConnect
Text of this file
Opportunity: Chama SCADA ReplacementSan Juan-Chama Project, C
Description
Chama SCADA Replacement San Juan-Chama Project, Colorado -New Mexico
Overview
Reference number:
140R4019Q0065
Issue date:
07/29/2019
Response due:
09/27/2019 06:00 PM US/Eastern
Set Aside:
Total Small Business
NAICS:
541512-Computer Systems Design Services
PSC / FSC:
N060-INSTALLATION OF EQUIPMENT- FIBER OPTICS MATERIALS,
Agency:
DOI
Contracting office:
Bureau of Reclamation
Upper Colorado Region
Regional Office
125 South State Street, Room 8100
Salt Lake City, UT 84138
Place of Performance:
Chama Field Division
193 North Pinon Drive
Chama , NM 87520.0426
Contact:
Shannon Mortensen
Phone:
Fax:
Email:
SMortensen@usbr.gov
Vendors conference:
08/21/2019
09:00 AM
Location:
193 N. Pinon Dr Chama NM
Details:
The site visit will be held August 21st, 2019 at 9:00 am at the Chama Field Office 193 North Pinon Drive, Chama NM 87520-0426. The site visit is expected to last all day and the sites will include Heron Dam (similar to El Vado) and the Oso Diversion Dam (similar to Little Oso and Blanco Division Dam). There will be an option on August 22, 2019 at 9:00 to see Little Oso & Blanco Division Dam and El Vado Dam. Questions will be limited and will be expected to be emailed to smortensen@usbr.gov. All questions will be due by August 30, 2019 by 16:00 MD.
What do I do now?
This is the opportunity summary page. To the left you will see a description and an overview of this opportunity.
To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.
Registered Users
To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.
Non Registered Users
You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.
Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.
Documentation
140R4019Q0065
Pre-solicitation Notice
Overview
Announcement
Solicitation
Overview
140R4019Q0065
Specifications
© 2019 Compusearch Software Systems, Inc. All rights reserved.
Terms of Service and Use
About FedConnect
Videos
Help
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .