This document is Standard Form 30 Amendment 0001 to Solicitation No. 140R3026Q0013, issued by the Bureau of Reclamation's Lower Colorado Region in Boulder City, Nevada. The amendment extends the deadline for receipt of quotes to March 18, 2026, by 3:00 P.M. Pacific Time and provides clarifications on pipe and flange specifications for the quoted products.
The questions and answers address technical specifications for an integrated steel and HDPE piping system. Key specifications clarified include: HDPE pipe will be DR32.5 for all sizes (12-inch, 18-inch, and 24-inch); steel pipe will be 12-inch NPS Standard/Schedule 40 for weld joints and fittings; flanges will be butt fused flanges with backing plates and ANSI Class 150 bolt pattern for all pipe types, with one hardware kit and gaskets required per flange pair; and the maximum operating pressure for the integrated system is 35 psi. The amendment notes that no new questions will be accepted and that acknowledgement of the amendment must be received by the specified deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 140R3026Q0013-Combined_Synopsis_Solicitation.pdf | ||
| Sol_140R3026Q0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Maribel Ruble
See continuation page
Bureau of Reclamation Lower Colorado Region Regional Office 500 Fir Street Boulder City NV 89005
R30
140R3026Q0013
03/06/2026
02/23/2026
1 2
Solicitation No. 140R3026Q0013 Page 2 of 2 Amendment 0001 Questions & Answers
PURPOSE OF AMENDMENT: The purpose of this amendment is to provide responses to questions from potential quoters.
RECEIPT OF QUOTES: The date and time for receipt of quotes is extended to March 18, 2026, by 3:00P.M. Pacific Time.
ACKNOWLEDGEMENT: See Block 11 above regarding how to acknowledge this amendment.
The acknowledgement must be received at the place designated for the receipt of offers prior to the hour and date specified in the solicitation.
Questions and Responses:
Question-1:
"Confirm what DR/Pressure rating is needed for the HDPE?
Answer-1: HDPE Pipe will be DR32.5.
Question-2:
"What DR or wall thickness is the HDPE?
Asnwer-2: DR 32.5 Question-3:
"The HDPE flange adapters are called out as "slip on flange". Do you need butt fusion flanges? Also, do you need 1 hardware kit or 2?
Answer-3: Flanges will be butt fussed flange with backing plate and one hardware kit per flange pair.
Question-4:
"Can you please confirm the specs of the 12" steel pipe?
Answer-4: Steel pipe will be 12-inch NPS Standard/Schedule 40 for weld joints and fittings.
Question-5:
"What is the required Pressure Class or SDR (Standard Dimension Ratio) for the 12-inch, 18-inch, and 24-inch HDPE pipe segments?
Answer-5: All HDPE Pipe will be DR32.5.
Question-6:
"What is the maximum operating pressure (psi) for the integrated steel and HDPE system?
Answer-6: Maximum operating pressure is expected to be 35 psi.
Question-7:
"Confirmation of the flange bolt pattern (e.g., ANSI Class 150) for the slip-on and weld-on flanges.
Answer-7: Flanges will be ANSI Class 150 bolt pattern for all pipe types. Flanges will be required to include hardware kit and gaskets.
Question-8:
"Could you please advise what DR/Pressure rating is needed for the HDPE?
Answer-8: The HDPE Pipe will be DR 32.5 for all sizes.
No new questions will be accepted.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
File details come from the government source that posted it. Updated .