ATTACHMENT_10_Subcontracting_Percentage_Worksheet_for_Non-Commercial_Neg_Procurement_-_Cost_Proposal_final.pdf
PDF 115 KB Posted
- Attached to
- Top of Hoover Dam Pedestrian Safety
- Solicitation number
- 140R3019R0018
About this file
Attachment 10 - Subcontracting Percentage Worksheet
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 10 Subcontracting Percentage
Worksheet for Non-Commerical Negotiated Procurement
This page intentionally left blank
Solicitation: 140R3019R0018 Top of Hoover Dam Pedestrian Safety
N:\SPECS\$FY 2019\140R3019R0018 - Hoover Dam Pedestrian Crosswalk\12 Sol - Amend\Attachments\ATTACHMENT 10 Subcontracting Percentage Worksheet for Non-Commercial Neg Procurement - Cost Proposal final.docx DIAPR 2011-06 3/17/2011
U.S. Department of the Interior
FAR Clauses 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet for
Non-Commercial Negotiated Acquisitions Requiring Cost Proposals
Note to Offeror: Complete one form for each subcontractor which is included in your Technical and Cost Proposal. This form is for small businesses only who are required to meet the goals setforth under FAR Clause 52.219-14, Limitations of Subcontracting.
PRIME CONTRACTOR: ____________________ SOURCE: ________________
SUBCONTRACTOR: _______________________ SOURCE: ________________
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUB TOTAL (A) $ (B) $
LABOR G&A**@______% $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL in figure (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = __________________%
Solicitation: 140R3019R0018 Top of Hoover Dam Pedestrian Safety
N:\SPECS\$FY 2019\140R3019R0018 - Hoover Dam Pedestrian Crosswalk\12 Sol - Amend\Attachments\ATTACHMENT 10 Subcontracting Percentage Worksheet for Non-Commercial Neg Procurement - Cost Proposal final.docx DIAPR 2011-06 3/17/2011
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.
File details come from the government source that posted it.