140R3019Q0070 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boulder City NV 89005
R30
500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation
08/28/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/16/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT TITLE: 140R3019Q0070 Mule Wash A-110.1 Upland Sediment Control Structure
Installation -- Yuma Area Office
PURPOSE OF AMENDMENT: The purpose of this amendment is to: extend the quote due date, clarify the period of performance on Standard Form 18, add clause FAR 52.245-1 (Alt I), add provision FAR 52.228-1, list Attachment 4 in Section J, provide answers to vendor's questions, and transmit the site visit sign-in sheet.
RECEIPT OF QUOTES: The date and time for receipt of quotes is extended; the date and time for receipt of quotes is extended to 1400 (hour) local time 09/04/2019 (date).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maribel Ruble
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R3019Q0070/0001
ACKNOWLEDGEMENT: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for the receipt of quotes prior to the hour and date specified in the solicitation.
DESCRIPTION OF CHANGES: The Request for Quote
(RFQ) is revised to incorporate the following changes. All changes were marked with a vertical line on the left side border.
CHANGES:
1. The date and time for receipt of quotes is extended; the date and time for receipt of quotes is extended to 1400 (hour) local time 09/04/2019
(date).
2. RFQ Standard Form18 is revised to clarify the period of performance. The period of performance is 120 calendar days after receipt of Notice to
Proceed.
3. RFQ Section I is revised to incorporate by reference FAR clause 52.245-1, Government
Property (Jan 2017), Alternate I (Apr 2012).
4. RFQ Section L is revised to add the requirement for a bid guarantee when the resultant contract is expected to exceed
$150,000. FAR 52.228-1, Bid Guarantee (Sept
1996), is incorporated in the solicitation in full text at Section L, L.13.
5. RFQ Section J is revised to list Attachment 4, Subcontracting Percentage Worksheet. The worksheet must be completed by all small businesses submitting a quote. If the small business will self-perform, the form must be submitted with a statement that subcontractors are not applicable.
6. The answers to the vendors' questions are attached.
7. The 8/23/2019 site visit sign-in sheet is transmitted.
ATTACHMENTS:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R3019Q0070/0001
140R3019Q0070 RFQ PAGE I-2
140R3019Q0070 RFQ PAGE J-1
140R3019Q0070 RFQ PAGE L-6
QUESTIONS AND ANSWERS
8/23/2019 SITE VISIT SIGN-IN SHEET
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section I - Contract Clauses
RFQ No.
140R3019Q0070
Project Title: Mule Wash A-110.1 Upland Sediment Control Structure Installation – Yuma Area Office
I-2
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984 52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991 52.236-14 Availability and Use of Utility Services April 1984 52.236-15 Schedules for Construction Contracts April 1984 52.236-21 Specifications and Drawings for Construction February 1997 52.243-5 Changes and Changed Conditions April 1984 52.245-1 Alt 1 Government Property, Alternate I (Apr 2012) January 2017 52.247-21 Contractor Liability for Personal Injury and/or Property Damage April 1984 52.249-2 Alt 1 Termination for Convenience of the Government (Fixed-Price) April 2012 52.249-10 Default (Fixed-Price Construction) April 1984
I.2 52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS
(OTHER THAN COMMERCIAL ITEMS)
AUGUST 2019
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C.3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub.L.108-77, 108-78
(19 U.S.C. 3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (Apr 1984).
(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).
(iii) 52.232-11, Extras (Apr 1984).
(iv) 52.232-25, Prompt Payment (Jan 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec2013)
(vii) 52.233-1, Disputes (May2014).
(viii) 52.244-6, Subcontracts for Commercial Items (Aug 2019).
(ix) 52.253-1, Computer Generated Forms (Jan 1991).
I
Section J - List of Documents, Exhibits and Other Attachments
RFQ No.
140R3019Q0070
Project Title: Mule Wash A-110.1 Upland Sediment Control Structure Installation – Yuma Area Office
J-1
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
J.1 APPLICABILITY OF DOCUMENTS
(a) The documents, exhibits, and other attachments which are identified in this Section J, apply to and are a part of this contract. In the event that any document is missing in whole or in part from this document when received, the Contracting Officer shall be notified immediately.
J.2 LIST OF CONTRACT DOCUMENTS
Attachment No. Title No. of Pages 1 Specifications 8 2 Drawings 4 3 Wage Determination: AZ20190037 07/19/2019 6 4 Subcontracting Percentage Worksheet 1 I
Section L - Instructions, Conditions and Notices to Bidders
RFQ No.
140R3019Q0070
Project Title: Mule Wash A-110.1 Upland Sediment Control Structure Installation – Yuma Area Office
L-6
(a) General contents. Each quote shall:
(1) Be specific and complete in every detail;
(2) Conform to all RFQ provisions, clauses, or other requirements;
(3) Be logically assembled, practical, legible, clear, concise, coherent; and indexed (cross-indexed, where appropriate); and
(b) Arrangement of Quote. The quote may consist of one complete document. Quote shall contain the following: The Representations, Certifications and Other Statements of Offerors (Section K) or evidence of SAM.gov registration (preferred); and completed Request for Quotations, SF-18 form and Price Schedule, Page B-1.
(c) Other:
(1) A summary of any exemptions from, or deviations to, any other RFQ requirements.
(d) Submission of Quote. Electronic quotes are authorized and shall be submitted via e-mail to Luis Gallardo at lgallardo@usbr.gov.
L.12 1452.236-85 INSTRUCTION FOR MOBILIZATION AND
PREPARATORY WORK SCHEDULE LINE ITEMS
-- BUREAU OF RECLAMATION
MAY 2000
The Contracting Officer estimates that the Section B Mobilization and Preparatory Work schedule line item should not exceed 5 percent (except when a different percentage is included in future task order(s)) of the total bid price. Your attention is directed to contract clause WBR 1452.232-81 Payment for Mobilization and Preparatory Work, which reflects how the Government will pay for this line item, including how payment will be made when the price bid for this schedule line item is higher than the percentage stated herein.
(End of provision)
L.13 52.228-1 BID GUARANTEE SEPT 1996
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g.,bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20% percent of the bid price.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
I I I I mailto:lgallardo@usbr.gov
140R3019Q0070 Mule Wash A-110.1 Upland Sediment Control Structure Installation – Yuma Area Office
Questions and Answers
Question 01: Can the original bond documents be electronically scanned and submitted with the electronic submittal package, and then have the original bond documents in the mail? This would show the bonds being issued by the stated time, and the original documents are forthcoming.
Answer 01: In accordance with RFQ Section L, L.13 FAR 52.228-1, the original/hardcopy bid bond must be received by the quote due date.
Question 02: When the clearing and grubbing activities occur and there are native materials that have been cleared, do these materials need to be hauled away, or can they be spread or stockpiled elsewhere so that the native material can go through a natural decomposition process? Will all the protected species of plants be identified before construction begins?
Answer 02: Disposal of nonhazardous organic waste materials shall be hauled to stockpile A-
105.3 indicated in drawing 423-303-3285. A list of endangered and threatened species can be obtained HERE1 (http://ecos.fws.gov/tess). All grubbing and clearing of endangered species are approved along the fence alignment. This includes the excavated trench during fence installation and where riprap is indicated, all other areas are prohibited from endangered species removal.
Question 03: Will there be a requirement for traffic control on the public roadway near the project work site? Or can this be an activity where construction signs are setup and the construction workers will be mindful to keep the public out of the project work areas?
Answer 03: Traffic control must meet MUTCD Part 6 requirements (2009 MUTCD Rev. 1&2)2
(https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm). The contractor will provide signs, safety barriers, barricades, danger signals, flasher lights, and other temporary traffic control devices as required to protect work and public safety. The contractor will provide one unobstructed, smooth, and dustless passageway for traffic through construction operations.
Question 04: What kind of compaction is expected/required for the backfill of the excavation to install the fencing?
Answer 04: Compaction with crawler-type tractors, vibrating drum rollers, surface plate vibrator, or similar equipment shall compact in horizontal layers to compacted thickness of 12 inches or less. Compaction with hand held impact tampers, vibrating plate tampers, or small tamping equipment shall compact in horizontal layers to compacted thickness of 6 inches. As http://ecos.fws.gov/tess http://ecos.fws.gov/tess https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm indicated in drawing number 423-303-3288, backfill along the fence alignment shall be native material. Also indicated in drawing number 423-303-3286, construction of O&M access road shall use existing wash fan material as shown on the drawing.
Question 05: I see mixed information about surveying. Will there be survey markers for the fencing locations? Also, will the O&M access roads be surveyed? Will there be elevation information on any surveying?
Answer 05: The contractor shall be responsible for surveying and the proper alignment of the fencing. Drawing number 423-303-3286 provides approximate elevations, coordinates, road/ford dimensions and fencing alignments. Fence alignment and top of fence, shall be within a 0.25 foot degree of accuracy. Subgrades and gravel surfaced roads shall be within 0.1 foot accuracy.
Question 06: How accessible are the stock piles for the rip rap and the road base materials? We did not go visit those locations, so I am not sure how much room there is for equipment to load, turnaround, or if there is enough access to begin with, or if access needs to be created in order to load the material and haul to the job location. Are there any pictures available that displays the accessibility?
Answer 06: There are two stockpile sites that can efficiently be used, the southern stockpile located at river mile 105.3(4.8 miles from construction site) has a minimum 25’ wide road section into a 300’x 900’ pad of which 42,750 sqft is unused space. The stockpile site to the north located at river mile 110.8 (.7 miles from construction site) is located directly on the levee road with 18,500 sqft of unused space. The quantities of material are located on drawing number 423-303-3285. Both locations have adequate access, loading, and turnaround space.
Question 07: Weight restrictions on bridges.
Answer 07: As for bridge access, River Road Bridge which is on River Mile 104.3 (almost 6 miles south of the site) has an Operating Rating of 67 tons. The bridge on river mile 100 near the Ox Bow BLM land has an Operating Rating of 47 tons. You also have Route 10 about 11 miles north of the site. This should not affect the project as any trucks used for hauling won't be crossing the bridges while being loaded.
1 http://ecos.fws.gov/tess
2 https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm
C (
U S Department of the Interior Bureau of Reclamation
Managing Water in the West
Sign In Sheet Site Visit
Solicitation No. 140R301900070 Mule Wash A-i 70.7 Upland Sediment Control Structure Installation Date: Friday, August 23, 2019, 9:30 a.m.
Represents Representative’s I Firm’s Name & Address I Tel/Fax Numbers Name & Job Title Email Address ü PRIME Luis Gallardo Bureau of Reclamation TEL: (928) 343-8129
Yuma Area Office U SUB Contract Specialist 7301 CaIle Agua Salada Email: Igallardo@usbr.gov
Yuma, AZ 85364
U SUPPLIER
X GOVT.
XPRIME /tiiv LL- TEL.:
SUB
U SUPPLIER
&;lic (U&AAg5 k V
X GOVT.
PRIME TEL.: ‘t.L f?t n’t U SUB Email:iL1
5 fr
U SUPPLIER /14
: GOVT.
( PRIME %t1 TEL.: 59213
U SUB 3Qf/. Email:
U SUPPLIER
I I GOVT. Y” p17. L5 U PRIME 3 M1kr TEL.:
U SUB Email:
U SUPPLIER
_4A.jl
VGOVT.
U PRIME M- ,1ctc1-41i TEL.:
U SUB Email:
U SUPPLIER (.1!
GOVT.
fr
Solicitation No. 140R3019Q0070 Mule Wash A-11O.1 Upland Sediment Control Structure Installation
Represents Representative’s Firm’s Name & Address Tel/Fax Numbers Name & Job Title Email Address
U PRIME J?4’1fI/ 7,rg TEL.:
U SUB E’’6. 1,4( Email: PtoaS&”$8- .&
U SUPPLIER
)( GOVT.
U PRIME TEL.:
C SUB Email:
U SUPPLIER
U GOVT.
U PRIME TEL.:
U SUB Email:
U SUPPLIER
U GOVT.
PRIME TEL.:
1 SUB Email:
SUPPLIER
U GOVT.
U PRIME TEL.:
U SUB Email:
U SUPPLIER
U GOVT.
U PRIME TEL.:
SUB Email:
U SUPPLIER
L GOVT.
U PRIME TEL.:
U SUB Email:
U SUPPLIER
U GOVT.
U PRIME TEL.:
SUB Email:
U SUPPLIER
GOVT.
0 2 0