Performance_Work_Statement_1.pdf

PDF 116 KB Posted

Attached to
Folsom Grove TMS 500-2 Crane Repair
Solicitation number
140R2026Q0047
Issued by

About this file

Performance Work Statement – Grove TMS 500-2 Crane Repair

This Performance Work Statement (PWS) defines the non-personal services contract requirements for repairing the Grove TMS 500-2 crane (Serial No. 237896) operated by the Central California Area Office (CCAO), Bureau of Reclamation. The contractor must return the crane to operational status in full compliance with manufacturer specifications and applicable safety standards. The crane is currently out of service and is critical to CCAO operations, specifically for lifting and lowering shutter panels and reconfiguring FOD shutters to achieve downstream temperature targets as requested by the Central Valley Office (CVO). All repair work must be performed at the contractor's facility, though the crane is located in Folsom, CA. The contractor is responsible for furnishing all labor, parts, tools, equipment, materials, supervision, transportation, and management necessary to diagnose, repair, test, and return the crane to service. The period of performance is 60 days after receipt of order (ARO).

The contractor must deliver four key deliverables: a Repair Plan within 5 business days ARO or after initial diagnostics; a Final Repair Report detailing work performed, parts installed with part numbers, applicable photos, and recommendations; Test Documentation including functional test checklists, load test certificates if performed, and calibration records; and a Warranty Certificate specifying coverage terms for parts and labor. Performance standards require meeting approved schedule milestones, ensuring repairs conform to OEM specifications and applicable standards with complete and accurate documentation, and achieving operational readiness with no safety-critical discrepancies. Acceptance requires receipt and approval of all deliverables and confirmation that the crane operates safely per OEM and applicable standards with no outstanding safety-critical issues.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Folsom Grove TMS 500-2 Crane Repair

Central California Area Office (CCAO), Bureau of Reclamation

1.0 Scope

This is a non-personal services contract to repair the CCAO Grove TMS 500-2 crane (Serial No. 237896) to operational status in accordance with manufacturer specifications and applicable safety standards. The Contractor shall furnish all labor, parts, tools, equipment, materials, supervision, transportation, and management necessary to diagnose, repair, test, and return the crane to service.

2.0 Background

The CCAO Grove TMS 500-2 crane is currently out of service. The crane and crew are required to support lifting and lowering shutter panels and to reconfigure FOD shutters to achieve downstream temperature targets requested by the Central Valley Office (CVO), as well as other critical CCAO tasks.

Timely restoration to service is essential to mission execution and operations scheduling.

3.0 Period of Performance

60 days after receipt of order (ARO)

4.0 Place of Performance

The crane is located in Folsom, CA. However, all repair work should be performed at the Contractor’s facility.

5.0 Contractor-Furnished Items and Services

The Contractor shall provide all personnel, parts, materials, equipment, tooling, test equipment, management, supervision, and transportation required to complete the effort; and shall ensure compliance with applicable laws, regulations, and manufacturer guidance.

6.0 Deliverables

1. Repair Plan (within 5 business days ARO or after initial diagnostic).

2. Final Repair Report: detailed work performed, parts installed (with part numbers), photos (as applicable), and any recommendations.

3. Test Documentation: functional test checklist; load test certificate(s) if performed; calibration records.

4. Warranty Certificate: coverage terms for parts and labor.

7.0 Performance Standards

Schedule: Contractor meets approved schedule milestones and completes repairs within the period of performance.

Technical Quality: Repairs conform to OEM specs and applicable standards; documentation complete and accurate.

Operational Readiness: Crane operates safely with no deficiency preventing mission use; no open safety-critical discrepancies at acceptance.

8.0 Acceptance Criteria

Receipt and approval of all deliverables.

Confirmation that the crane is safe and operational per OEM and applicable standards, with no safety-critical discrepancies outstanding.

9.0 Changes

Only the Contracting Officer (CO) may modify the contract. Additional services require a written modification prior to performance.

File details come from the government source that posted it. Updated .