A01_12_PWS_CalSimLogic_2026_2.pdf
PDF 185 KB Posted
- Attached to
- Model Development and Support CalSim Model Logic Federal contract opportunity
- Solicitation number
- 140R2026Q0024
About this file
This Performance Work Statement (PWS) outlines a contract for CalSim Model Development and Operations Analysis for the Bureau of Reclamation. The objective is to support improvements to the California Simulation (CalSim) model, which simulates monthly operations for the Central Valley Project (CVP) and State Water Project (SWP). Key tasks include project management, ongoing CalSim model development, supporting operations and modeling staff, and data management. The contract is a Time and Materials (T&M) service contract with a base year and 4 option years, running from March 1, 2026 to February 28, 2031.
Specific development requirements include exploring CVP allocation procedures, implementing flexibility in water project accounting, improving model efficiency, redesigning Millerton Lake operations, and creating databases and post-processing tools. The contractor will provide weekly progress meetings, quarterly reports, and develop WRESL code with documentation. Deliverables must be submitted digitally via secure online platforms, with interim code and materials required to be made available within 2 business days of Reclamation's request. The performance standards emphasize accuracy, logical data interpretation, and accessibility of models and documentation to Reclamation staff.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A01_12_PWS_CalSimLogic_2026_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
CalSim Model Development and Operations Analysis
1.0 SCOPE
1.1 Objective
The objective of this contract is to acquire contractor services to support improvements to operational assumptions within the CalSim model and support the Bureau of Reclamation (Reclamation) in related operations analysis; focusing on allocation, export, rescheduling, model efficiency, Cooperating Operations Agreement (COA) considerations, and Millerton operations logic.
1.2 Background
Reclamation and the California Department of Water Resources (DWR) have a collaboratively developed version of the California Simulation (CalSim) model of the Central Valley Project (CVP) and the State Water Project (SWP) operations, known as CalSim. CalSim simulates monthly operations for the CVP, SWP, and local agencies within the Sacramento and San Joaquin Valleys, and it is the central model for long-term planning for the Bay-Delta watershed system which is a vital water source for municipal, agricultural, and environmental purposes. By modeling hypothetical operations, CalSim provides information on the impaired hydrology of the system, a necessary component for analyzing proposed changes to operations, regulations, infrastructure or to determine the effects of weather variability. Outputs are used in various secondary modeling which includes models for power generation, temperature, water quality, and the effects on the biological resources reliant on the Bay-Delta system.
CalSim logic has constantly been developing from the first release of benchmark studies in 2002 through the present. New and/or improved capabilities in modeling physical and operational aspects of CVP/SWP management have been developed, as time and budgets have allowed, and as growing the application spectrum has highlighted issues to address. Efforts have included incorporation of an ANN for delta water quality, updates to Colusa Basin demand representation, conveyance facilities, and connectivity to enable implementation of Sites Reservoir, daily disaggregation of Sacramento River flows to better simulate Fremont Weir spills and gated structures, and ongoing work to craft logic as regulatory criteria is tested, implemented, and modified via multiple processes. The modeling needs, available expertise, and technology is continually evolving, and Reclamation is in need of additional support to respond to rapid changes in internal priorities and the regulatory environment in a timely manner while continuing to improve the capabilities and accuracy of CalSim.
2.0 CONTRACT DETAILS
2.1 Type of Contract
Time and Materials (T&M) Service Contract
2.2 Period of Performance
This contract shall be for a Base Year and 4 Option Years. The Option Years will be exercised based on the performance of the Contractor and the existing need for the services by the Government. The period of performance will be as follows:
Base Year: March 1, 2026 – February 28, 2027 Option Year 1: March 1, 2027 – February 28, 2028 Option Year 2: March 1, 2028 – February 28, 2029 Option Year 3: March 1, 2029 – February 28, 2030 Option Year 4: March 1, 2030 – February 28, 2031
2.3 Recognized Holidays:
The Federal Government recognized Holidays are as follows:
New Year’s Day Labor Day Birthday of Martin Luther King Jr. Columbus Day Washington’s Birthday Veterans Day Memorial Day Thanksgiving Day Juneteenth National Independence Day Christmas Day Independence Day
2.4 Place of Performance
The work to be performed under this contract shall be performed at the Contractor’s facility and other places appropriate for meetings.
3.0 TASKS
The contractor shall perform the following tasks:
1. Project Management, Meetings, and Coordination
2. Support Ongoing Needs for CalSim Model Development
3. Support Operations and Modeling Staff on an as needed basis
4. Data Management and Documentation
3.1 Project Management, Meetings, and Coordination
The Contractor’s designated Point of Contact (POC) and the Reclamation Contracting Officer’s Representative (COR) shall, at a minimum, establish and maintain a recurring weekly meeting. The purpose of these meetings is to facilitate regular progress updates from the Contractor and to ensure effective coordination with Reclamation technical personnel. These meetings are particularly important due to the potential for unforeseen technical challenges and shifting project priorities.
Reclamation technical staff reserve the right to cancel or reschedule any meeting based on necessity or logistical considerations. Additional meetings or communications may be initiated by either party on an as-needed basis to address emergent issues or time-sensitive matters.
The Contractor and Reclamation will determine project schedules jointly, and it is the Contractor’s responsibility to manage their resources to meet the schedule after it has been set. The schedule can be adjusted to provide additional time at the Reclamation COR’s discretion.
3.1.1 Deliverables and Due Dates
• Deliverables:
o Summaries of progress meetings as requested.
o Invoices and progress reports on an agreed upon schedule, no less than quarterly.
• Due Date: Performance period of the task order.
3.2 Ongoing Needs for CalSim Model Development
The Contractor shall provide CalSim development support, which may include, but are not limited to:
• Explore perspectives on setting CVP allocation that directly reflect the decision process used by Central Valley Operations Office. The goal is to create an allocation procedure in CalSim which is repeatable and not iterative.
• Implement flexibility in CVP/SWP COA accounting, including debt to project storage or other mechanisms and explore alternative coordinated operations.
• Support staff on the current Cooperating Operations Agreement implementation in CalSim, and analysis of COA balance from CalSim results.
• Examine opportunities to improve model efficiency: cycle structure, San Joaquin groundwater simulation, transfer-type operations, ect.
• Redesign logic of Millerton Lake operations with Friant Kern Project allocations.
• Implement CVP operations of the Delta Mendota Canal and Joint Use Branch of the California
Aqueduct include water user rescheduling of allocated supplies, which has influence on San Luis operations and Jones exports. Furthermore, well-established water user practices for groundwater pumping, sales, and tradeoffs with San Joaquin supplies affect the timing of CVP facility operations. A template should be developed which allows these operations to affect model results, propagating from Jones and intertie use to delta conditions and north of Delta storage operations.
• Create a database of historical water sources, water uses, and data source for individual contractors represented in CalSim.
• Create post-processing tools for QAQC, model diagnostics, and analyzing system efficiency.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Level of effort will be coordinated between Reclamation and the Contractor, but expected to include: WRESL code development, comments in the code to explain logic, quality assurance checks, and Reclamation staff walk-through of implementation.
3.2.1 Deliverables and Due Dates
• Deliverables:
o Interim copies of WRESL code being developed under this contract to be made available within 2 business days of Reclamation request for review.
o Interim and final code shall be made available to Reclamation via secure online platform (like SharePoint).
o Post-processing scripts and spreadsheets created under this contract to be made available within 2 business days of Reclamation request for review.
• Due Date: Performance period of the task order; within 2 business days for interim copies of WRESL code
3.3 Data Management and Documentation
The Contractor shall provide final models and documentation on all code developed under this contract by the end of the contract. Documentation shall include comments within the developed code to explain the logic and requested memorandums.
The Contractor shall provide a secure online platform for Reclamation to access the final models. Final models shall be available on the shared drive through the end of the contract period.
3.3.1 Deliverables and Due Dates
• Deliverables:
o Contractor will provide final copies of the WRESL code developed for the requested refinements on or before the termination of this contract. Final WRESL code shall include comments and output DSS files. Requested memorandums to be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.4 Support Operations and Modeling Staff
The Contractor shall provide modeling and training support to both Central Valley Operations and the Bay-Delta Office Modeling Division on an as needed basis to support unforeseen and time sensitive tasks. These may include but are not limited to: CalSim modeling support that is not covered in Task 2, providing educational sessions and materials, technical analyses of CalSim models, gathering and processing relevant data, and review of draft CalSim models.
3.4.1 Deliverables and Due Dates
• Deliverables:
o Interim copies of WRESL code being developed under this contract to be made available within 2 business days of Reclamation request for review.
o Interim and final code shall be made available to Reclamation via secure online platform (like SharePoint).
o Post-processing scripts and spreadsheets created under this contract to be made available within 2 business days of Reclamation request for review.
o Support educational sessions in coordination with Reclamation.
o Perform technical analysis and relevant documentation
• Due Date: Performance period of the task order; within 2 business days for interim copies of WRESL code
4.0 PERFORMANCE REQUIREMENTS SUMMARY
Task No.
Task Description
Performance
Indicator
Performance
Standard
Minimum Acceptable Quality
Level 01 Project
Management, Meetings, and Coordination
Coordination with Reclamation staff
Meeting weekly or at Reclamation’s discretion.
Regular (no less than quarterly) invoices and progress reports.
95% meeting requested meetings, invoices, and progress reports.
Support Ongoing Needs for CalSim Model Development
CalSim developments completed and
Interim models made available within 2 business days of
Logical interpretation of the data from the resulting product must be possible.
provided to Reclamation
Reclamation request.
Product should be free from technical errors and contain accurate data.
03 Support Operations and Modeling Staff
Technical Analysis, CalSim Models/WRESL code developed, Memorandums, and Educational Materials
Provide technical analyses and memorandums
Product should be free from technical errors and contain accurate data.
Plan and conduct training sessions and provide training materials
All documents have been reviewed by Reclamation staff and any requested edits have been addressed
Logical interpretation of the data from the resulting product must be possible.
Models and Documentation accessible to Reclamation.
Data Management and Documentation
Models and documentation made available to Reclamation
Product should be free from technical errors and contain accurate data.
Model and documentation accessible to Reclamation.
Logical interpretation of the data from the resulting product must be possible.
Models and Documentation accessible to Reclamation.
5.0 DATA AND REPORTS - The contractor shall provide the following data and reports as follows:
Item No.
Description
Content
Format
Medium
Delivery
01 Summaries of progress meetings
See Task 1 Digital Email, MS Word, or
Email or upload to secure online platform
02 Invoices and Progress Reports
See Task 1 Digital Email, MS Word, or
Email or upload to secure online platform
03 CalSim Models/WRESL code developed
See Task 2, 3, and 4
Digital WRESL code, DSS output
Upload to secure online platform
04 Memorandums See Task 3 and 4
Digital MS Word or
Email or upload to secure online platform
05 Educational Materials
See Task 3 Digital MS Word, Excel, or PDF, ppt
Email or upload to secure online platform
06 Technical Analyses
See Task 3 Digital MS Word, Excel, or PDF, ppt
Email or upload to secure online platform
07 Post-Processing Tools
See Task 3 Digital MS Excel, Wresl Code, script in other scripting language
Email or upload to secure online platform