DRAFT_Summary_of_Work_1.pdf

PDF 728 KB Posted

Attached to
B. F. Sisk Dam SOD Modifications, Phase II Federal contract opportunity
Solicitation number
140R2024R0015
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a Summary of Work for the B.F. Sisk Dam SOD Modifications, Phase II project located in Merced County, California. The work includes constructing shear keys and berms, developing quarry and borrow areas to provide materials, and providing necessary infrastructure for transporting materials. Key components of the work involve material processing and supply, earthwork such as excavation and placement of fill materials, instrumentation for monitoring, and exterior improvements including restoration and revegetation. The project is part of the San Luis Unit, West San Joaquin Division of the Central Valley Project and is being conducted by the Department of the Interior Bureau of Reclamation. The associated federal contract opportunity is a Pre-Solicitation with Solicitation Number 140R2024R0015.

View the file

Other files for this federal contract opportunity

Other files attached to B. F. Sisk Dam SOD Modifications, Phase II, newest first.
File Type Posted
Sources_Sought_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B. F. Sisk Dam SOD Modifications, Phase II San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No.

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located approximately 12 miles west of Los Banos, California in Merced County.

1.02 SUMMARY OF WORK

A. Construct shear keys at NVS and SW165.

B. Construct berms at each of three separate locations along the dam: SW165, NVS, and

SVS.

C. Develop Basalt Hill Quarry, Borrow Area 14, Borrow Area 12, and Borrow Area 6 to provide materials for use as part of this contract.

D. Provide infrastructure as required for transporting materials.

1.03 PRINCIPAL COMPONENTS OF WORK

A. General:

1. Maintaining Government Field Office and Government Laboratory Facility, each complete with utilities.

2. Obtaining necessary permits.

3. Installation and monitoring of environmental mitigation measures and protection of species.

B. Material Processing and Supply:

1. Blasting.

2. Material processing, washing, and stockpiling.

3. Supplying and transporting materials.

4. Transporting materials from on-site borrow areas or commercial sources.

C. Earthwork:

1. Removal and control of water.

2. Earthwork for structures.

3. Excavation of existing rock blanket materials.

DRAFT

B. F. Sisk Dam SOD Modifications, Phase II San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No.

Summary of Work

01 11 00 - 2

4. Excavation of foundation materials for shear keys.

5. Foundation preparation, cleaning, and support for mapping.

6. Excavation from borrow areas.

7. Excavation from quarry.

8. Placing shear key earthfill materials.

9. Placing berm earthfill materials.

10. Placing rock blanket material.

11. Furnishing and placing controlled low strength material (CLSM).

12. Placing filter and drainage materials.

13. Constructing haul roads.

14. Constructing toe drains.

D. Instrumentation:

1. Abandoning and removing existing instrumentation.

2. Furnishing and installing temporary inclinometers.

3. Slope stability monitoring.

4. Groundwater and seepage instrumentation and monitoring.

5. Protecting existing instrumentation.

E. Exterior Improvements:

1. Furnishing and placing gravel surfacing for new roads.

2. Restoring existing roads damaged by haul activities.

3. Restoration and revegetation of borrow areas and use areas.

4. Work associated with meeting environmental permit requirements.

F. Utilities:

1. Coordination with PG&E for project power needs.

2. Constructing toe drains.

1.04 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.