About this file

This document outlines the requirements of the Cyber Security Supply Chain Risk Management Standard CIP-013-1. It identifies the functional entities subject to the standard including Balancing Authorities, Distribution Providers, Generator Operators, Generator Owners, Reliability Coordinators, Transmission Operators, and Transmission Owners. It also defines the applicable bulk electric system facilities.

The standard requires entities to develop one or more supply chain cybersecurity risk management plans covering procurement processes for high and medium impact bulk electric system cyber systems. The plans must address software integrity and authenticity verification, vendor remote access coordination, procurement risk assessments, and vendor notification for incidents and vulnerabilities. Entities must implement their plans, and review and update them at least every 15 months with senior manager approval. The standard aims to mitigate cybersecurity risks in vendor products and services procured for reliable bulk electric system operation.

View the file

Other files for this federal contract opportunity

Other files attached to 7G--Purchase 9 multiplexers and support, newest first.
File Type Posted
Salient_characteristics_-_multiplexers_0001.pdf PDF
Sol_140R2024Q0050_Amd_0001.pdf PDF
Sol_140R2024Q0050.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior 11/17/2021

Supply Chain Risk Management Plan for Bulk Electric System Cyber Systems (BCSs)

CIP-013-1

Revision Block

Rev. No. Description Date Change Official, Organization

1.0 Initial Release 09/09/2020 Wendy S. Center, PRO

2.0 2021 Annual Review and Approval

11/17/2021 Wendy S. Kalidass, PRO

Contents Overview

Requirement R1

Part 1.1

Part 1.2

Requirement R2

Requirement R3

References

Overview This document describes Reclamation’s controls and processes to meet the CIP-013-1 requirements for supply chain cyber security risk management. CIP-013-1 applies to high and medium impact Bulk Electric System (BES) Cyber Systems (BCSs). It does not apply to associated systems such as Physical Access Control Systems (PACS), Electronic Access Control or Monitoring Systems (EACMS), or Protected Cyber Assets (PCA). It also does not apply to low impact BCS, non-NERC Facilities, or other Industrial Control Systems (ICS) that are not related to BES operation.

Requirement R1 CIP-013-1 Requirement R1 requires Reclamation to develop one or more documented supply chain cyber security risk management plan(s) for high and medium impact BCSs. This document satisfies that requirement.

Part 1.1 The Federal Acquisition Regulations, Department of the Interior (DOI) Acquisition Regulations, and Reclamation Acquisition Regulations (RAR) identify the cyber and physical security controls required for all purchases. These controls were determined through risk assessments conducted at the federal, department, and bureau levels.

In accordance with the RAR, Reclamation documents contractors’ past performance in the Past Performance Information Retrieval System (PPIRS), which is used to determine whether vendors may be selected. Past performance is based in part on whether the vendor adhered to contract clauses (including those associated with information technology (IT)). Additional details for this process can be found in WBR subpart 1442.1503 of the RAR.

When changing vendors, Reclamation must follow the processes in the RAR for a new contract.

WBR Part 1439 of the RAR describes controls for procuring IT hardware, including BCS components in accordance with the DOI Enterprise Information Technology Hardware Mandatory Acquisition Strategy. To secure facilities and IT resources during the performance of service and construction contracts, Reclamation implements the security risk mitigation controls described in WBR subpart 1437.81 of the RAR.

The Denver Power Resource Office (PRO), Reliability Compliance Team reviews purchase requests for ICS equipment and services as part of the ICS Purchase Request Process. This process is initiated using an online preliminary purchase request application for both ICS purchases and ICS micro-purchases. Emergency purchase requests, i.e., those where not purchasing immediately would result in a serious impact to the agency or mission, must be submitted as soon as practical after the purchase occurs through the micro-purchase process.

Part 1.2 Reclamation requires the following when procuring BCSs:

1.2.1 Notification by the vendor of vendor-identified incidents related to the products or services provided to Reclamation that pose cyber security risk to Reclamation.

1.2.2. Coordination of responses to vendor-identified incidents related to the products or services provided to Reclamation that pose cyber security risk to Reclamation.

1.2.4. Disclosure by vendors of known vulnerabilities related to the products or services provided to Reclamation.

To address contractor responsibilities with respect to incident and vulnerability notification in accordance with subparts 1.2.1, 1.2.2, and 1.2.4, Reclamation uses WBR 1452.237-80, paragraph (f)(3) of the RAR, which states, “the Contractor shall immediately notify the [Contracting Officer’s Representative (COR)], of all cyber-related incidents (including the compromise of Contractor- or Government-owned systems for which the Contractor bears operational or management responsibility), regardless of location.”

In addition to the RAR contract language, Reclamation coordinates with the Cybersecurity & Infrastructure Security Agency (CISA) and Department of the Interior to remediate identified vulnerabilities prior to public disclosure by vendors or through CISA’s advisories or bulletins.

1.2.3. Notification by vendors when remote or onsite access should no longer be granted to vendor representatives.

Reclamation does not allow vendor remote access to its BCSs. To address contractor responsibilities for onsite access in accordance with subpart 1.2.3, Reclamation uses WBR 1452.237-80, paragraph (a)(5) of the RAR, which states:

Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.

Additionally, issuance of government-issued identification cards requires a background check for Contractor employees. Temporary identification cards and visitor badges do not allow unescorted physical access to BES Cyber Systems.

1.2.5. Verification of software integrity and authenticity of all software and patches provided by the vendor for use in the BES Cyber System.

To address contractor IT security responsibilities in accordance with subpart 1.2.5, Reclamation uses WBR 1452.237-80 paragraph (f)(5), of the RAR, which states:

Contractor shall be responsible for the IT security of all contractor-owned systems connected to a Bureau of Reclamation network or Reclamation-owned systems operated or maintained by the Contractor for Reclamation, regardless of location. This clause is applicable to all or any part of the contract that includes IT resources or services to which the Contractor must have physical or electronic access, and which may contain Reclamation's sensitive information on unclassified systems directly supporting the mission of Reclamation. This includes IT, hardware, software, databases, and the management, operation, maintenance, programming, and system administration of computer systems, networks, and telecommunications systems.

Examples of tasks that require these security provisions include:

(i) The acquisition, transmission or analysis of data owned by Reclamation; and

(ii) Access to Reclamation networks or computers at a level beyond that granted to the general public, such as access to control rooms, computer rooms, or controlled access through a firewall or other security control measure.

Each Reclamation region implements procedural controls to verify the identity of software source(s) and the integrity of the software obtained from the software source(s) in accordance with CIP-010-3 R1 Part 1.6. The contract language ensures that contractors are required to meet obligations with respect to software security.

1.2.6. Coordination of controls for (i) vendor-initiated Interactive Remote Access, and (ii) system-to-system remote access with a vendor(s).

Reclamation does not allow vendor remote access to its BCSs. For more information, see Reclamation Power Reliability Compliance Bulletin for CIP-005-6.

Requirement R2 CIP-013-1 Requirement R2 requires Reclamation to implement the supply chain cyber security risk management controls described within this document. Reclamation retains evidence of implementing each control with each applicable purchase request and/or contract. Evidence of implementation includes emails transmitting completed Information Management Team (IMT) ICS Purchase Checklists as part of the ICS purchase approval process and equipment or service contracts containing language for purchases made for CIP-013 applicable systems. Reclamation is not required to renegotiate or abrogate existing contracts (including amendments to master agreements and purchase orders) to implement these controls. Additionally, these controls do not govern (1) the actual terms and conditions of a procurement contract or (2) vendor performance and adherence to a contract.

Requirement R3 PRO Reliability Compliance staff annually reviews this plan for changes prior to briefing the CIP Senior Manager. The CIP Senior Manager reviews and approves this plan annually, not to exceed 15 calendar months.

References CIP-013-1 – Cyber Security - Supply Chain Risk Management

Department of the Interior Acquisition Regulation

Federal Acquisition Regulation

Reclamation Acquisition Regulation, WBR 1452.237-80 Security Requirements

Reclamation Acquisition Regulation

A. Introduction

1. Title: Cyber Security - Supply Chain Risk Management

2. Number: CIP-013-1

3. Purpose: To mitigate cyber security risks to the reliable operation of the Bulk Electric System (BES) by implementing security controls for supply chain risk management of BES Cyber Systems.

4. Applicability:

4.1. Functional Entities: For the purpose of the requirements contained herein, the following list of functional entities will be collectively referred to as “Responsible Entities.” For requirements in this standard where a specific functional entity or subset of functional entities are the applicable entity or entities, the functional entity or entities are specified explicitly.

4.1.1. Balancing Authority

4.1.2. Distribution Provider that owns one or more of the following Facilities, systems, and equipment for the protection or restoration of the BES:

4.1.2.1. Each underfrequency Load shedding (UFLS) or undervoltage Load shedding (UVLS) system that:

4.1.2.1.1. Is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and

4.1.2.1.2. Performs automatic Load shedding under a common

control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.

4.1.2.2. Each Remedial Action Scheme (RAS) where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.

4.1.2.3. Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.

4.1.3. Generator Operator

4.1.4. Generator Owner

4.1.5. Reliability Coordinator

4.1.6. Transmission Operator

4.1.7. Transmission Owner

4.2. Facilities: For the purpose of the requirements contained herein, the following Facilities, systems, and equipment owned by each Responsible Entity in 4.1 above are those to which these requirements are applicable. For requirements in this standard where a specific type of Facilities, system, or equipment or subset of Facilities, systems, and equipment are applicable, these are specified explicitly.

4.2.1. Distribution Provider: One or more of the following Facilities, systems and equipment owned by the Distribution Provider for the protection or restoration of the BES:

4.2.1.1. Each UFLS or UVLS System that:

4.2.1.1.1. Is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and

4.2.1.1.2. Performs automatic Load shedding under a common

control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.

4.2.1.2. Each RAS where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.

4.2.1.3. Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.

4.2.1.4. Each Cranking Path and group of Elements meeting the initial switching requirements from a Blackstart Resource up to and including the first interconnection point of the starting station service of the next generation unit(s) to be started.

4.2.2. Responsible Entities listed in 4.1 other than Distribution Providers

4.2.2.1. All BES Facilities.

4.2.3. Exemptions: The following are exempt from Standard CIP-013-1:

4.2.3.1. Cyber Assets at Facilities regulated by the Canadian Nuclear Safety Commission.

4.2.3.2. Cyber Assets associated with communication networks and data communication links between discrete Electronic Security Perimeters (ESPs).

4.2.3.3. The systems, structures, and components that are regulated by the Nuclear Regulatory Commission under a cyber security plan pursuant to 10 C.F.R. Section 73.54.

4.2.3.4. For Distribution Providers, the systems and equipment that are not included in section 4.2.1 above.

4.2.3.5. Responsible Entities that identify that they have no BES Cyber Systems categorized as high impact or medium impact according to the identification and categorization process required by CIP- 002-5, or any subsequent version of that Reliability Standard.

5. Effective Date: See Implementation Plan for Project 2016-03.

B. Requirements and Measures

R1. Each Responsible Entity shall develop one or more documented supply chain cyber security risk management plan(s) for high and medium impact BES Cyber Systems. The plan(s) shall include: [Violation Risk Factor: Medium] [Time Horizon: Operations Planning]

1.1. One or more process(es) used in planning for the procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the Bulk Electric System from vendor products or services resulting from: (i) procuring and installing vendor equipment and software; and (ii) transitions from one vendor(s) to another vendor(s).

1.2. One or more process(es) used in procuring BES Cyber Systems that address the following, as applicable:

1.2.1. Notification by the vendor of vendor-identified incidents related to the products or services provided to the Responsible Entity that pose cyber security risk to the Responsible Entity;

1.2.2. Coordination of responses to vendor-identified incidents related to the products or services provided to the Responsible Entity that pose cyber security risk to the Responsible Entity;

1.2.3. Notification by vendors when remote or onsite access should no longer be granted to vendor representatives;

1.2.4. Disclosure by vendors of known vulnerabilities related to the products or services provided to the Responsible Entity;

1.2.5. Verification of software integrity and authenticity of all software and patches provided by the vendor for use in the BES Cyber System; and

1.2.6. Coordination of controls for (i) vendor-initiated Interactive Remote Access, and (ii) system-to-system remote access with a vendor(s).

M1. Evidence shall include one or more documented supply chain cyber security risk management plan(s) as specified in the Requirement.

R2. Each Responsible Entity shall implement its supply chain cyber security risk management plan(s) specified in Requirement R1. [Violation Risk Factor: Medium] [Time Horizon: Operations Planning]

Note: Implementation of the plan does not require the Responsible Entity to renegotiate or abrogate existing contracts (including amendments to master agreements and purchase orders). Additionally, the following issues are beyond the scope of Requirement R2: (1) the actual terms and conditions of a procurement contract; and (2) vendor performance and adherence to a contract.

M2. Evidence shall include documentation to demonstrate implementation of the supply chain cyber security risk management plan(s), which could include, but is not limited to, correspondence, policy documents, or working documents that demonstrate use of the supply chain cyber security risk management plan.

R3. Each Responsible Entity shall review and obtain CIP Senior Manager or delegate approval of its supply chain cyber security risk management plan(s) specified in Requirement R1 at least once every 15 calendar months. [Violation Risk Factor:

Medium] [Time Horizon: Operations Planning]

M3. Evidence shall include the dated supply chain cyber security risk management plan(s) approved by the CIP Senior Manager or delegate(s) and additional evidence to demonstrate review of the supply chain cyber security risk management plan(s).

Evidence may include, but is not limited to, policy documents, revision history, records of review, or workflow evidence from a document management system that indicate review of supply chain risk management plan(s) at least once every 15 calendar months; and documented approval by the CIP Senior Manager or delegate.

C. Compliance

1. Compliance Monitoring Process

1.1. Compliance Enforcement Authority:

“Compliance Enforcement Authority” means NERC or the Regional Entity, or any entity as otherwise designated by an Applicable Governmental Authority, in their respective roles of monitoring and/or enforcing compliance with mandatory and enforceable Reliability Standards in their respective jurisdictions.

1.2. Evidence Retention:

The following evidence retention period(s) identify the period of time an entity is required to retain specific evidence to demonstrate compliance. For instances where the evidence retention period specified below is shorter than the time since the last audit, the Compliance Enforcement Authority may ask an entity to provide other evidence to show that it was compliant for the full time period since the last audit.

The Responsible Entity shall keep data or evidence to show compliance as identified below unless directed by its Compliance Enforcement Authority to retain specific evidence for a longer period of time as part of an investigation.

• Each Responsible Entity shall retain evidence of each requirement in this standard for three calendar years.

• If a Responsible Entity is found non-compliant, it shall keep information related to the non-compliance until mitigation is complete and approved or for the time specified above, whichever is longer.

• The CEA shall keep the last audit records and all requested and submitted subsequent audit records.

1.3. Compliance Monitoring and Enforcement Program

As defined in the NERC Rules of Procedure, “Compliance Monitoring and Enforcement Program” refers to the identification of the processes that will be used to evaluate data or information for the purpose of assessing performance or outcomes with the associated Reliability Standard.

Violation Severity Levels

R # Violation Severity Levels

Lower VSL Moderate VSL High VSL Severe VSL

R1. The Responsible Entity developed one or more documented supply chain cyber security risk management plan(s) which include the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Part 1.1, and include the use of process(es) for procuring BES Cyber systems as specified in Part 1.2, but the plans do not include one of the parts in Part 1.2.1 through Part 1.2.6.

The Responsible Entity developed one or more documented supply chain cyber security risk management plan(s) which include the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Part 1.1, and include the use of process(es) for procuring BES Cyber systems as specified in Part 1.2, but the plans do not include two or more of the parts in Part

1.2.1 through Part 1.2.6.

The Responsible Entity developed one or more documented supply chain cyber security risk management plan(s), but the plan(s) did not include the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Part 1.1, or the plan(s) did not include the use of process(es) for procuring BES Cyber systems as specified in Part 1.2.

The Responsible Entity developed one or more documented supply chain cyber security risk management plan(s), but the plan(s) did not include the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Part 1.1, and the plan(s) did not include the use of process(es) for procuring BES Cyber systems as specified in Part 1.2.

OR

The Responsible Entity did not develop one or more documented supply chain cyber security risk management plan(s) as specified in the Requirement.

R2. The Responsible Entity implemented its supply chain cyber security risk management plan(s) including the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Requirement R1 Part 1.1, and including the use of process(es) for procuring BES Cyber systems as specified in Requirement R1 Part 1.2, but did not implement one of the parts in Requirement R1 Part 1.2.1 through Part 1.2.6.

The Responsible Entity implemented its supply chain cyber security risk management plan(s) including the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Requirement R1 Part 1.1, and including the use of process(es) for procuring BES Cyber systems as specified in Requirement R1 Part 1.2, but did not implement two or more of the parts in Requirement R1 Part 1.2.1 through Part 1.2.6.

The Responsible Entity implemented its supply chain cyber security risk management plan(s), but did not implement the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Requirement R1 Part 1.1, or did not implement the use of process(es) for procuring BES Cyber systems as specified in Requirement R1 Part 1.2.

The Responsible Entity implemented its supply chain cyber security risk management plan(s), but did not implement the use of process(es) in planning for procurement of BES Cyber Systems to identify and assess cyber security risk(s) to the BES as specified in Requirement R1 Part 1.1, and did not implement the use of process(es) for procuring BES Cyber systems as specified in Requirement R1 Part 1.2;

OR

The Responsible Entity did not implement its supply chain cyber security risk management plan(s) specified in the requirement.

R3. The Responsible Entity reviewed and obtained CIP Senior Manager or delegate approval of its supply chain cyber security risk management plan(s) but did

The Responsible Entity reviewed and obtained CIP Senior Manager or delegate approval of its supply chain cyber security risk management plan(s) but did

The Responsible Entity reviewed and obtained CIP Senior Manager or delegate approval of its supply chain cyber security risk management plan(s) but did

The Responsible Entity did not review and obtain CIP Senior Manager or delegate approval of its supply chain cyber security risk management plan(s) within so more than 15 calendar months but less than or equal to 16 calendar months since the previous review as specified in the Requirement.

so more than 16 calendar months but less than or equal to 17 calendar months since the previous review as specified in the Requirement.

so more than 17 calendar months but less than or equal to 18 calendar months since the previous review as specified in the Requirement.

18 calendar months of the previous review as specified in the Requirement.

D. Regional Variances

None.

E. Associated Documents Link to the Implementation Plan and other important associated documents.

Version History

Version Date Action Change Tracking

1 07/20/17 Respond to FERC Order No. 829.

1 08/10/17 Approved by the NERC Board of Trustees.

1 10/18/18 FERC Order approving CIP-013-1. Docket No.

RM17-13-000.

Supplemental Material

Rationale

Requirement R1:

The proposed Requirement addresses Order No. 829 directives for entities to implement a plan(s) that includes processes for mitigating cyber security risks in the supply chain. The plan(s) is required to address the following four objectives (Order No. 829 at P. 45):

(1) Software integrity and authenticity;

(2) Vendor remote access;

(3) Information system planning; and

(4) Vendor risk management and procurement controls.

The cyber security risk management plan(s) specified in Requirement R1 apply to high and medium impact BES Cyber Systems.

Implementation of the cyber security risk management plan(s) does not require the Responsible Entity to renegotiate or abrogate existing contracts (including amendments to master agreements and purchase orders), consistent with Order No. 829 (P. 36).

Requirement R1 Part 1.1 addresses the directive in Order No. 829 for identification and documentation of cyber security risks in the planning and development processes related to the procurement of BES Cyber Systems (P. 56). The security objective is to ensure entities consider cyber security risks to the BES from vendor products or services resulting from: (i) procuring and installing vendor equipment and software; and (ii) transitions from one vendor(s) to another vendor(s); and options for mitigating these risks when planning for BES Cyber Systems.

Requirement R1 Part 1.2 addresses the directive in Order No. 829 for procurement controls to address the provision and verification of security concepts in future contracts for BES Cyber Systems (P. 59). The objective of Part 1.2 is for entities to include these topics in their plans so that procurement and contract negotiation processes address the applicable risks.

Implementation of the entity's plan related to Part 1.2 may be accomplished through the entity's procurement and contract negotiation processes. For example, entities can implement the plan by including applicable procurement items from their plan in Requests for Proposals (RFPs), negotiations with vendors, or requests submitted to entities negotiating on behalf of the Responsible Entity such as in cooperative purchasing agreements. Obtaining specific controls in the negotiated contract may not be feasible and is not considered failure to implement an entity's plan. Although the expectation is that Responsible Entities would enforce the security-related provisions in the contract based on the terms and conditions of that contract, such contract enforcement and vendor performance or adherence to the negotiated contract is not subject to this Reliability Standard.

The objective of verifying software integrity and authenticity (Part 1.2.5) is to help ensure that software installed on BES Cyber Systems is not modified prior to installation without the awareness of the software supplier and is not counterfeit. Part 1.2.5 is not an operational requirement for entities to perform such verification; instead, it requires entities to address the software integrity and authenticity issue in its contracting process to provide the entity the means by which to perform such verification under CIP-010-3.

The term vendor(s) as used in the standard is limited to those persons, companies, or other organizations with whom the Responsible Entity, or its affiliates, contract with to supply BES Cyber Systems and related services. It does not include other NERC registered entities providing reliability services (e.g., Balancing Authority or Reliability Coordinator services pursuant to NERC Reliability Standards). A vendor, as used in the standard, may include: (i) developers or manufacturers of information systems, system components, or information system services; (ii) product resellers; or (iii) system integrators.

Collectively, the provisions of CIP-013-1 address an entity's controls for managing cyber security risks to BES Cyber Systems during the planning, acquisition, and deployment phases of the system life cycle, as shown below.

Notional BES Cyber System Life Cycle

Requirement R2:

The proposed requirement addresses Order No. 829 directives for entities to periodically reassess selected supply chain cyber security risk management controls (P. 46).

Entities perform periodic assessment to keep plans up-to-date and address current and emerging supply chain-related concerns and vulnerabilities. Examples of sources of information that the entity could consider include guidance or information issued by:

• NERC or the E-ISAC

• ICS-CERT

• Canadian Cyber Incident Response Centre (CCIRC)

Responsible Entities are not required to renegotiate or abrogate existing contracts (including amendments to master agreements and purchase orders) when implementing an updated plan (i.e., the note in Requirement R2 applies to implementation of new plans and updated plans).

BCS document
CIP-013
4.1. Functional Entities: For the purpose of the requirements contained herein, the following list of functional entities will be collectively referred to as “Responsible Entities.” For requirements in this standard where a specific functional entity...
4.1.1. Balancing Authority
4.1.2. Distribution Provider that owns one or more of the following Facilities, systems, and equipment for the protection or restoration of the BES:
4.1.2.1. Each underfrequency Load shedding (UFLS) or undervoltage Load shedding (UVLS) system that:
4.1.2.1.1. Is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and
4.1.2.1.2. Performs automatic Load shedding under a common control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.
4.1.2.2. Each Remedial Action Scheme (RAS) where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.
4.1.2.3. Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.
4.1.3. Generator Operator
4.1.4. Generator Owner
4.1.5. Reliability Coordinator
4.1.6. Transmission Operator
4.1.7. Transmission Owner
4.2. Facilities: For the purpose of the requirements contained herein, the following Facilities, systems, and equipment owned by each Responsible Entity in 4.1 above are those to which these requirements are applicable. For requirements in this standa...
4.2.1. Distribution Provider: One or more of the following Facilities, systems and equipment owned by the Distribution Provider for the protection or restoration of the BES:
4.2.1.1. Each UFLS or UVLS System that:
4.2.1.1.1. Is part of a Load shedding program that is subject to one or more requirements in a NERC or Regional Reliability Standard; and
4.2.1.1.2. Performs automatic Load shedding under a common control system owned by the Responsible Entity, without human operator initiation, of 300 MW or more.
4.2.1.2. Each RAS where the RAS is subject to one or more requirements in a NERC or Regional Reliability Standard.
4.2.1.3. Each Protection System (excluding UFLS and UVLS) that applies to Transmission where the Protection System is subject to one or more requirements in a NERC or Regional Reliability Standard.
4.2.1.4. Each Cranking Path and group of Elements meeting the initial switching requirements from a Blackstart Resource up to and including the first interconnection point of the starting station service of the next generation unit(s) to be started.
4.2.2. Responsible Entities listed in 4.1 other than Distribution Providers
4.2.2.1. All BES Facilities.
4.2.3. Exemptions: The following are exempt from Standard CIP-013-1:
4.2.3.1. Cyber Assets at Facilities regulated by the Canadian Nuclear Safety Commission.
4.2.3.2. Cyber Assets associated with communication networks and data communication links between discrete Electronic Security Perimeters (ESPs).
4.2.3.3. The systems, structures, and components that are regulated by the Nuclear Regulatory Commission under a cyber security plan pursuant to 10 C.F.R. Section 73.54.
4.2.3.4. For Distribution Providers, the systems and equipment that are not included in section 4.2.1 above.

File details come from the government source that posted it. Updated .