Rewire Three Circuit Breaker Panels
Solicitation number
140R2024Q0015
Issued by

About this file

This performance work statement outlines requirements for rewiring three circuit breakers at a federal power plant. The contractor will rewire circuit breakers supplied by the Central California Area Office to match the customer's existing units. Work will include pinning out each breaker individually, creating wiring diagrams, removing ultraviolet coating, performing preventative maintenance, cleaning, testing, and providing a condition report. All work must be completed within three months of receiving the purchase order. The contractor's facility will perform the work and return the breakers to the Reclamation office once completed. The government will review 100% of the work stated in each invoice prior to approval. This work relates to solicitation number 140R2024Q0015 issued by the Department of the Interior Bureau of Reclamation to obtain these circuit breaker rewiring services at its Folsom Power Plant in California.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Folsom Power Plant D2A Circuit Breakers Rewire

1.0 Scope

Folsom Power Plant D2A electrical panel has three circuit breakers. Central California Area Office (CCAO) already purchased three new replacements and those need to be rewired to match the existing ones.

• Services to rewire CCAO supplied units from WD 18-738-602-445 to Customers existing Breaker WD 18-738-602-445 and Trip

• Wiring Diagram 18-738-600-401

• Pinning out each breaker individually

• Creating wiring diagrams without UV circuit

• Removing UV

• PM, Clean and Test

• Provide a written report on the condition.

2.0 Period of Performance

Rewire services completed within 3 months (90 days) after the receipt of the Purchase Order.

3.0 Place of Performance

Contractor’s shop/ work site. Reclamation will send the breakers to the contractor’s facility. Contractor to return to Reclamation once work is completed.

4.0 Quality Assurance Surveillance Plan

The Quality Assurance Surveillance Plan is one evaluation method the government uses to perform surveillance to determine whether the Contractor meets the standards of performance as defined in the PWS. The absence of a QASP for any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract in determining the quality of the Contractor performance.

5.0 Performance Requirements Summary Table

Performance Requirement Acceptable Quality Level

Means of Measurement

Contractor shall comply with the Performance Work Statement

All agreed upon work is performed to an acceptable level as stated in the performance work statement and in conjunction with applicable federal, state, or local regulations.

Government representative review of 100% of the work completed as stated in the invoice prior to approving invoice.