Sol_140R2021Q0072_Amd_0002.pdf

PDF 86 KB Posted

Attached to
Shasta Temperature Control Device Water Barrier Cu Federal contract opportunity
Solicitation number
140R2021Q0072
Issued by
Department of the Interior Bureau of Reclamation

About this file

This combined synopsis and solicitation requests quotes for diving services to deploy and stow water barrier curtains at the Shasta Temperature Control Device. The Bureau of Reclamation seeks these services for a base year and four option years, with a period of performance from June 2021 to May 2026. Quotes are due by May 11, 2021 and shall include pricing information. This is a total small business set-aside with a NAICS code of 561990 and size standard of $12 million. The solicitation identifies the required services in the attached performance work statement and price schedule. Divers will perform deployment and stowage tasks over approximately 10 and 6 day durations respectively, using manual and electric equipment as conditions require.

View the file

Other files for this federal contract opportunity

Other files attached to Shasta Temperature Control Device Water Barrier Cu, newest first.
File Type Posted
Sol_140R2021Q0072_Amd_0001.pdf PDF
140R2021Q0072 Combo SS_Shasta TCD Curtain Deployment_Attchs.pdf PDF
Sol_140R2021Q0072.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R2021Q0072 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815

R20

Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation

05/05/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/21/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Do not fill out this form. It is not required for quote submission. Follow the directions in a combined synopsis/solicitation as to what documents are required to submit.

A. TITLE: Shasta Temperature Control Device Water Barrier Curtains Deployment and Stowage

B. PURPOSE: The purpose of this amendment is to incorporate questions and answers as follows:

1. What has been the typical deployment duration from past years?

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Nandini Johnson

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R2021Q0072/0002

The typical deployment duration is approximately

10 days.

2. What has been the typical demobilization duration from past years?

The typical demobilization duration is approximately six (6) days.

3. What equipment has been utilized to raise and lower the curtains?

Divers perform these tasks with appropriate diving support equipment from a vessel near the temperature control device. Equipment used included manual chain falls, electric hoists, and ratchet straps to cinch the material. Methods may change due to conditions on site at the time the contractor is directed to perform the deployment or storage.

The date and time for receipt of quotes remain the same, May 11, 2021 at 17:00 p.m. Eastern

Standard Time.

The contractors must acknowledge this amendment by submitting a signed copy of this SF30 along with their quote.

Period of Performance: 06/01/2021 to 05/31/2026

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .