Sol_140R2020Q0014.pdf
PDF 400 KB Posted
- Attached to
- Steelhead Spawning and Stranding Surveys Federal contract opportunity
- Solicitation number
- 140R2020Q0014
About this file
This is a combined synopsis/solicitation for commercial items seeking quotes to provide field support, data analysis, and equipment to conduct spawning and stranding surveys on the Lower American River. The solicitation is set aside for small businesses with a NAICS code of 541690 and size standard of $16.5 million. The Bureau of Reclamation within the Department of the Interior is the contracting agency. Quotes are due by January 17, 2020 and should be emailed to the point of contact. The period of performance is from January 24, 2020 to January 23, 2024. Pricing terms will be evaluated separately for each quote submitted. Applicable FAR clauses and provisions are included in the attached solicitation package.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3_DOI-AAAP-OO50 CPARS.pdf | ||
| Attachment 1_Price Schedule_Steelhead Spawning and Stranding Surveys.xlsx | XLSX spreadsheet | |
| Attachment 2 - Wage Determination.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R20
Sacramento CA 95825-1898
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
0009909968 CODE 16. ADMINISTERED BYCODE
X
X
X
541690
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR20
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
01/17/2020 1400 ET
01/13/2020
916-978-5140Sarah Anaya (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R2020Q0014
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 58 0040469087OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
2800 Cottage Way, Room E-1815
TELEPHONE NO.
17a. CONTRACTOR/
Folsom CA 95630-1799 7794 Folsom Dam Road-Receiving Central California Area Office Bureau of Reclamation-MP-CCAO
15. DELIVER TO
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815 Division of Acquisition Services Regional Office Mid-Pacific Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$16.50
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Period of Performance: 01/24/2020 to 01/23/2024
00010 BASE - LOWER AMERICAN RIVER SPAWNING AND
STRANDING SURVEYS - Project Management - Work plan and schedule (updated Monthly), Invoice Progress Reports(Monthly, Meeting Minutes, Agendas and Materials, Communication Plan, Results of Pre-work Orientation Meeting, Mid-Project Review, Annual Close-Out Meeting, Lessons Learned Meetings.
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Denard Fobbs
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2020 to 01/23/2021
00020 BASE - LOWER AMERICAN RIVER SPAWNING AND
STRANDING SURVEYS - Annual Planning and
Mobilization - Safety Plan, Data Quality Control
Plan, Documentation showing coordination and review for adequacy of the plans from Reclamation.
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2020 to 01/23/2021
00030 BASE - LOWER AMERICAN RIVER SPAWNING AND
STRANDING SURVEYS - Data Collection - Bi-Weekly
CVSH Spawning Surveys (to map red locations), CVSH Stranding and Isolation Pool Surveys (no more than two (2) monthly, Populated Databases.
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
58 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014
Period of Performance: 01/24/2020 to 01/23/2021
00040 BASE - LOWER AMERICAN RIVER SPAWNING AND
STRANDING SURVEYS - Data Compilation - Bi-Weekly
Spawning Surveys Reports, Stranding/Isolation
Survey Reports, Data Compilation and Draft
Report, Annual Closeout Meeting, Final Report.
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2020 to 01/23/2021
00050 Option Year One - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Project Management - Work plan and schedule (updated Monthly), Invoice
Progress Reports(Monthly, Meeting Minutes, Agendas and Materials, Communication Plan, Results of Pre-work Orientation Meeting, Mid-Project Review, Annual Close-Out Meeting, Lessons Learned Meetings.
(Option Line Item)
01/24/2021
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2021 to 01/23/2022
00060 Option Year One - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Annual Planning and
Mobilization - Safety Plan, Data Quality Control
Plan, Documentation showing coordination and review for adequacy of the plans from Reclamation.
(Option Line Item)
01/24/2021
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2021 to 01/23/2022
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
4 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014
00070 Option Year One - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Collection -
Bi-Weekly CVSH Spawning Surveys (to map red locations), CVSH Stranding and Isolation Pool
Surveys (no more than two (2) monthly, Populated
Databases.
(Option Line Item)
01/24/2021
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2021 to 01/23/2022
00080 Option Year One - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Compilation -
Bi-Weekly Spawning Surveys Reports, Stranding/Isolation Survey Reports, Data
Compilation and Draft Report, Annual Closeout
Meeting, Final Report.
(Option Line Item)
01/24/2021
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2021 to 01/23/2022
00090 Option Year Two - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Project Management - Work plan and schedule (updated Monthly), Invoice
Progress Reports(Monthly, Meeting Minutes, Agendas and Materials, Communication Plan, Results of Pre-work Orientation Meeting, Mid-Project Review, Annual Close-Out Meeting, Lessons Learned Meetings.
(Option Line Item)
01/24/2022
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2022 to 01/23/2023
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014
00100 Option Year Two - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Annual Planning and
Mobilization - Safety Plan, Data Quality Control
Plan, Documentation showing coordination and review for adequacy of the plans from Reclamation.
(Option Line Item)
01/24/2022
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2022 to 01/23/2023
00110 Option Year Two - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Collection -
Bi-Weekly CVSH Spawning Surveys (to map red locations), CVSH Stranding and Isolation Pool
Surveys (no more than two (2) monthly, Populated
Databases.
(Option Line Item)
01/24/2022
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2022 to 01/23/2023
00120 Option Year Two - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Compilation -
Bi-Weekly Spawning Surveys Reports, Stranding/Isolation Survey Reports, Data
Compilation and Draft Report, Annual Closeout
Meeting, Final Report.
(Option Line Item)
01/24/2022
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2022 to 01/23/2023
00130 Option Year Three - LOWER AMERICAN RIVER SPAWNING
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014
AND STRANDING SURVEYS - Project Management - Work plan and schedule (updated Monthly), Invoice
Progress Reports(Monthly, Meeting Minutes, Agendas and Materials, Communication Plan, Results of Pre-work Orientation Meeting, Mid-Project Review, Annual Close-Out Meeting, Lessons Learned Meetings.
(Option Line Item)
01/24/2023
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2023 to 01/23/2024
00140 Option Year Three - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Annual Planning and
Mobilization - Safety Plan, Data Quality Control
Plan, Documentation showing coordination and review for adequacy of the plans from Reclamation.
(Option Line Item)
01/24/2023
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2023 to 01/23/2024
00150 Option Year Three - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Collection -
Bi-Weekly CVSH Spawning Surveys (to map red locations), CVSH Stranding and Isolation Pool
Surveys (no more than two (2) monthly, Populated
Databases.
(Option Line Item)
01/24/2023
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2023 to 01/23/2024
00160 Option Year Three - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Compilation -
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
7 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014
Bi-Weekly Spawning Surveys Reports, Stranding/Isolation Survey Reports, Data
Compilation and Draft Report, Annual Closeout
Meeting, Final Report.
(Option Line Item)
01/24/2023
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2023 to 01/23/2024
00170 Option Year Four - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Project Management - Work plan and schedule (updated Monthly), Invoice
Progress Reports(Monthly, Meeting Minutes, Agendas and Materials, Communication Plan, Results of Pre-work Orientation Meeting, Mid-Project Review, Annual Close-Out Meeting, Lessons Learned Meetings.
(Option Line Item)
01/24/2024
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2024 to 01/23/2025
00180 Option Year Four - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Annual Planning and
Mobilization - Safety Plan, Data Quality Control
Plan, Documentation showing coordination and review for adequacy of the plans from Reclamation.
(Option Line Item)
01/24/2024
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2024 to 01/23/2025
00190 Option Year Four - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Collection -
Bi-Weekly CVSH Spawning Surveys (to map red
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
8 58
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020Q0014 locations), CVSH Stranding and Isolation Pool
Surveys (no more than two (2) monthly, Populated
Databases.
(Option Line Item)
01/24/2024
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2024 to 01/23/2025
00200 Option Year Four - LOWER AMERICAN RIVER SPAWNING
AND STRANDING SURVEYS - Data Compilation -
Bi-Weekly Spawning Surveys Reports, Stranding/Isolation Survey Reports, Data
Compilation and Draft Report, Annual Closeout
Meeting, Final Report.
(Option Line Item)
01/24/2024
Product/Service Code: F999
Product/Service Description: OTHER ENVIRONMENTAL
SERVICES
Period of Performance: 01/24/2024 to 01/23/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Combined Synopsis/Solicitation 140R2020Q0014
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
Lower American River Monitoring Spawning and Stranding Surveys
Contracting Office:
Bureau of Reclamation
MP-3800
Acquisitions & Services Division
Supply and Services Branch Sacramento, CA 95825
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with FAR part 13.5 and additional information included in this notice. The Bureau of Reclamation intends to award a Firm Fixed Price Purchase Order with a Base and Four (4) Option Years in response to this solicitation. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This requirement is being set aside 100% for Small Business. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-01.
GENERAL INFORMATION
RFQ Number: 140R2020Q0014
Request for Quotation (RFQ) Request for Proposal (RFP) Invitation for Bid (IFB)
North American Industry Classification Code (NAICS): 541690 Size Standard: $16.5 Million
Quote Due Date:
Quote Submission:
Contact Information:
January 17, 2020 2:00 PM Pacific Standard Time
By email to sanaya@usbr.gov
Sarah Anaya Email: sanaya@usbr.gov
Service Destination 7794 Folsom Dam Road Folsom, CA 95630 mailto:sanaya@usbr.gov mailto:sanaya@usbr.gov
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
SOLICITATION ATTACHMENTS
1. Pricing Schedule
2. Wage Determination
3. DOI-AAAP-0050 – CPARS
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
Performance Work Statement (PWS) Lower American River
1.0 INTRODUCTION
1.1 Requiring Agency
Bureau of Reclamation (Reclamation) 7794 Folsom Dam Road Folsom, CA 95630
The mission of the Bureau of Reclamation (Reclamation) is to manage, develop and protect water and related resources in an environmentally and economically sound manner in the interest of the American people. Reclamation was issued a Biological Opinion (BiOp) and Reasonable Prudent Alternatives (RPAs) as per a formal consultation on the Coordinated Operations of the Central Valley Project and State Water Project with National Marine Fisheries Service (NMFS, June 4, 2009) in accordance with Section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.).
The following PWS outlines work to support efforts by Reclamation to maintain compliance with the NMFS BiOp and RPAs as it relates to the fisheries monitoring requirements for the Lower American Division, which includes spawning surveys and surveys for monitoring flows; i.e., Section 11.2.1.3 (8)(a) Monitoring and Reporting and RPA Action II.4, respectively.
The Contractor shall obtain the field data required by Reclamation to remain in compliance with NMFS’ 2009 BiOp, specifically Section 11.2.1.3 and the RPAs related to lower American River flows (Actions II.1 and II.4). These data will support operational decision making. The term of this firm-fixed contract shall be a base with four option years for a potential five years with annual renewals at the discretion of Reclamation.
2.0 BACKGROUND, SCOPE and OBJECTIVES
2.1 Background
The American River Basin Development Act of October 14, 1949 (63 Stat. 852) authorized the construction of Folsom and Nimbus Dams as part of the Central Valley Project (CVP). The Nimbus Hatchery was included as part of the mitigation developed in consultation with the U.S.
Fish and Wildlife Service (USFWS) and the California Department of Fish and Wildlife (CDFW) for construction of Nimbus Dam pursuant to the Fish and Wildlife Coordination Act of August 14, 1946 (60 Stat. 1080) that directs “Federal Agencies authorized to construct or operate water-control projects….to add to the structures and operations of such projects….in order to accommodate the means and measures for such conservation of wildlife resources as an integral part of such projects.”
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
NMFS found in its most recent BiOp (NMFS 2009) that the most influential baseline stressor to steelhead within the American River Division is the presence of Nimbus and Folsom Dams, which block steelhead from much of their historic spawning and rearing habitat.
The American River Division facilities (Folsom and Nimbus Dams and associated facilities) provide for the conservation and management of water on the American River for flood control, fish and wildlife protection, recreation, protection of the Delta from intrusion of saline ocean water, irrigation and M&I water supplies, and hydroelectric power generation.
2.2 Objective
The objective of this project is to provide field support, data analysis and equipment to conduct spawning and stranding surveys as addressed in this PWS in order to support technical evaluations of progress towards the lower American River monitoring requirements.
Included in this objective is a need to:
- Plan and organize for the safe conduct of field studies;
- Collect and perform quality assurance of the appropriate field data;
- Prepare interim updates and report on project progress; and,
- Compile and create electronic databases necessary to analyze data collected for inclusion to reports (end of survey and end-of-season).
2.3 Project Scope
The Contractor shall furnish a seasonal work crew, on an annual basis, comprised of one fisheries biologist, one fisheries technician (GIS competency), and the necessary field support staff to survey for redds (January until approximately mid-April) within a 12.9 mile reach of the lower American River between Nimbus Dam and the Watt Avenue Bridge.
Crews must possess the following skills related to conducting spawning and stranding/isolation pool surveys:
Planning Organizing (logistics) Conducting studies Collection of data Compilation of data at conclusion of each survey Analyzing field studies (map compilation, etc.)
Final report
It is important to note that late-fall Chinook salmon have been increasingly using the Lower American River. Therefore, monitoring redds during these months will require extra attention by survey crews to distinguish between late-fall run Chinook salmon and steelhead trout. In addition, potential overlap in the spawning times of steelhead, lamprey, suckers and pikeminnow also require attention when identifying fish species.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
The Contractor shall also designate a Project Coordinator who shall be the primary point of contact with Reclamation’s Contracting Officers Representative (COR) on all matters related to scheduling, invoicing, and technical matters. The Contractor shall participate in project coordination activities.
The scope of work for the base year and each successive option year is identical and includes a Planning Phase, Data Collection Phase, and Data Compilation Phase. The term of the contract shall be for five years. The Contractor shall work along with Reclamation personnel who may participate in the survey activities. Any necessary regulatory permits for handling of listed species in conjunction with this survey work will be the responsibility of the Contractor.
The Contractor shall furnish the work crew with the equipment necessary to conduct the surveys including safety equipment for use during the data collection phase. A list of equipment historically used, for reference only, is provided in Appendix One of this document.
3.0 REQUIREMENTS
3.1 Project Management
The Contractor shall designate a Project Coordinator who shall be the primary point of contact with Reclamation’s Contracting Officers Representative (COR) on all matters related to scheduling, invoicing, and technical matters. The Contractor’s Project Coordinator shall participate annually in a pre-work orientation meeting with Reclamation to review anticipated work schedules, develop/confirm communication protocols, and discuss any other matters of potential importance to contract performance.
The Contractor’s Project Coordinator shall participate annually in a mid-project review (Mid- February) with the COR for the primary purpose of evaluating the actual and projected resource requirements needed to obtain acceptable field data quality and to communicate any adjustments to resource use due to antecedent biological and physical conditions. The Contractor’s Project Coordinator shall also participate in an annual close-out meeting to conduct a review and demonstrate that all project requirements have been met and to make recommendations for the conduct of future surveys and process based on lessons learned during that years’ data collection phase.
The Contractor shall provide a seasonal work crew, on an annual basis, comprised of one fisheries biologist and one fisheries technician at a minimum, to assist in planning, organizing, conducting, and analyzing field studies necessary to conduct monitoring in the Lower American River.
The Contractor shall provide all necessary equipment for the support of the spawning and stranding/isolation pool surveys on the Lower American River.
The Contractor shall meet with the Reclamation, as needed, on a monthly basis throughout the duration of the project to report on project progress and review task milestones. The Contractor shall facilitate these meetings, provide meeting agendas, develop presentation materials describing project progress, and prepare meeting summary notes.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
The Contractor shall provide an initial Communication Plan within 1 week after the pre- work orientation meeting. The content of the Communications Plan shall define specific communication expectations, outcomes, personnel involved, methods, and timing of communication. The Contractor shall review and update the plan annually based on prior experience or lessons learned from prior or other similar efforts.
Task 3.1 Deliverables
1. Work plan and schedule, updated monthly
2. Monthly invoice and progress reports
3. Meeting minutes, agendas, materials
4. Communication Plan
5. Results of Pre-Work Orientation Meeting, Mid-Project Review, Annual Close Out Meeting, Lessons Learned meetings
3.2 Annual Planning and Mobilization Phase
During the Planning and Mobilization Phase, the Contractor shall ensure that the Fisheries Biologist understands the field methods, data collection needs, analytical approach, and Safety Plan. The Contractor shall prepare the Safety Plan, organize and obtain equipment, prepare field data sheets, and update the Data Quality Control Plan. The Contractor shall ensure project objectives are met. The content of the Safety Plan shall identify potential safety hazards, define hazard prevention and minimization methods, and include safety contact information.
The Contractor shall prepare a Data Quality Control Plan based on prior experience and/or lessons learned from prior or other similar efforts. The content of the Data Quality Control Plan shall include data collection, management and reporting protocol; as well as data quality assurance and quality control protocol. The Safety and Data Quality Control Plan will be completed and reviewed by the COR prior to Data Collection phase.
For Option Year One through Option Year Four, the Annual Planning and Mobilization Phase will typically begin in mid-November. During the base year, this phase will begin on task order award date.
Task 3.2 Deliverables
1. Safety Plan
2. Data Quality Control Plan
3. Documentation showing coordination and review for adequacy of the plans from
Reclamation
3.3 Data Collection Phase
During the Data Collection Phase, the Contractor shall ensure that the Fisheries Biologist and work crew safely conduct field surveys based on the Safety Plan, organize and schedule needed
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
contractor resources, collect and record data based on the Data Quality Control Plan, and prepare monthly reports as described below. The Data Collection Phase activities will typically begin in early January.
The Contractor shall ensure that the Fisheries Technician and work crew can begin work in January and work through May. The work crew shall work seasonally as part of a team to accurately collect the field data required to estimate the number of Central Valley steelhead (CVSH) spawning in the Lower American River. The Contractor shall compile and enter data into the appropriate databases needed to complete the analysis.
The Contractor shall submit bi-weekly reports during the data collection phase (January through April-likely, possibly through May) containing information on the use of project resources, general biological status of the CVSH population in the river, any noteworthy events related to the field studies and a forecast of project activities for the next monthly reporting period to the COR. The Contractor will also attend monthly American River Group (ARG) meetings via phone to provide a summary of monthly survey results to Reclamation and American River stakeholders.
Task 3.3 Deliverables
1. Bi-weekly CVSH Spawning surveys (to map redd locations)
2. CVSH stranding and isolation pool surveys (no more than two times per month)
3. Populated Databases
3.4 Data Compilation Phase
During the Data Compilation Phase, the Contractor shall compile field data, conduct final quality assurance of data, populate electronic databases with all data collected, and prepare the annual report. Individual CVSH redds will be surveyed with data logging GPS units (waypoint averaging will be used to attain sub-meter accuracy). GPS waypoints and associated data-dictionaries (containing the physical redd characteristic data) will be imported to ArcGIS to create spatial data layers and attribute tables to overlay with substrate layers for analysis.
Every two weeks, the Contractor (or work crew) will record, via GPS, the location of redds, including species identification, estimated fish length, redd nose velocity, depth in pocket, width, length and length of tailspill.
No more than twice a month (once a month on average), the Contractor shall determine how flows affect steelhead spawning locations, timing, and egg to fry survival through stranding and isolation pool surveys that are dictated by release changes of more than 1,000 cfs at flows between 8,000 and 25,000 cfs; and release changes of 250 cfs when flows are below 1,000 cfs.
The Contractor will be notified by Reclamation when flows are scheduled to decrease. Based on the flow data, the Contractor shall schedule the stranding/isolation surveys in coordination with Reclamation and CDFW staff. CDFW staff will have necessary permits required to handle endangered fish species. Stranded redd location, and/or isolation pool locations should be reported with GPS and mapped according. Redd depths and flows (based on stage elevation changes) are to be compiled and reported at the completion of the survey.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
The Contractor prepares the annual report by including tables, graphs, and databases with the results of the data compilation effort. The annual report will provide yearly estimates of in-river spawning steelhead abundance or an index of abundance that will be comparable from year to year.
Task 3.4 Deliverables
1. Bi-weekly Spawning Survey Reports
2. Stranding/Isolation Survey Reports
3. Data Compilation and Draft Report
4. Annual Close Out Meeting
5. Final Report
4.0 SCHEDULE OF DELIVERABLES and PERFORMANCE PERIOD
Task 3.1 Deliverables DUE DATE
1. Work plan and Schedule Updated monthly
2. Monthly invoice and progress reports Updated monthly
3. Meeting minutes, agendas, materials 5 work days after meeting
4. Communication Plan 2 weeks after award
5. Results of Pre-Work Orientation Meeting, Mid-Project Review, Annual Close Out Meeting, Lessons Learned meetings 5 work days after meeting Task 3.2 Deliverables DUE DATE
1. Safety Plan 2 weeks after review
2. Data Quality Control Plan 4 weeks after review
3. Documentation showing coordination and acceptance of plans from Reclamation Submit with Final Plans Task 3.3 Deliverables DUE DATE
1. Bi-weekly spawning surveys Bi-Weekly
2. Stranding/isolation surveys No more than 2/month
3. Populated Databases Monthly Task 3.4 Deliverables DUE DATE
1. Bi-weekly Reports Updated Bi-Weekly
2. Stranding/isolation Reports Updated no more than 2/month
3. Data Compilation and Draft Report May 1
4. Annual Close Out Meeting After draft report submitted
5. Final Report Final May 31
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
Period of Performance This requirement will be for a base year and four (4) option years.
5.0 PERFORMANCE ASSESSMENT PLAN
5.1 Monitoring Performance
During the course of the evaluation period, the Contracting Officer Representative (COR) shall track Contractor performance. Interim (mid-term) evaluations may be provided to identify strengths and weaknesses in the Contractor's performance during the period being evaluated. At the end of the period, the COR shall assess the Contractor's performance in accordance with the Quality Assurance Surveillance Plan (QASP) and report to the Contracting Officer (CO).
5.2 Contractor Self-Assessment
Following each evaluation period, the Contractor may provide a written self-assessment of its performance to the COR to be considered in its report to the CO. The self-assessment shall be submitted not later than 5 working days after the end of each evaluation period. The self-evaluation shall not exceed 1 page per Performance Requirements Summary (PRS) element. The self-assessment shall address both the strengths and weaknesses of the Contractor's performance during the evaluation period. Where deficiencies in performance are noted, the Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The self-assessment itself shall NOT be the basis for the payment determination.
5.3 COR Recommendation
The COR shall consider all evaluations and any other pertinent information, including Contractor self-assessment, and shall prepare a report to the CO with findings and recommendations. The Contractor shall be provided a copy of the draft findings and recommendations of the COR and shall be afforded the opportunity to identify factual errors. The COR's draft recommendation is not subject to negotiation and the COR shall not engage in discussions with the Contractor. Any errors identified by the Contractor shall be addressed by the COR in their final report. The Contractor shall be provided a copy of the final COR report at the same time the report is submitted to the CO.
5.4 Quality Assurance Surveillance Plan
The Quality Assurance Surveillance Plan is one evaluation method the government uses to surveil performance to determine whether the Contractor meets the standards of performance as defined in the PWS. The absence of a QASP for any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract in determining the quality of the Contractor performance.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
QUALITY ASSURANCE SURVEILLANCE PLAN
Performance Requirement Summary (PRS)
Acceptable Quality Level
Means of Measurement
Timeliness:
Contractor shall comply with the Performance Work Statement deadlines.
Receipt of:
Communication Plan Safety Plan Data Quality Control Plan Bi-Weekly Reports Update Plans as needed Draft Report Final Report
Meet Due Dates:
2 Weeks After Award 2 Weeks After Award 4 Weeks After Award As prepared Monthly Status May 1 May 31
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
Performance Requirements Summary
Performance Standard Acceptable Quality Level Method of Surveillance
Task 3.1. Deliverables
1. Work Plan and schedule Develop Work Plan, work sequence diagram and schedules for completion of all tasks
Detailed Plan meets BOR goals.
Comprehensive schedule ensure deadlines are met
Document review and coordination
2. Monthly invoice and progress reports
Progress reports show action taken, actions planned and concerns and/or issues
Accuracy – 95% of document error free
Document review and acceptance of invoice
3. Meeting minutes, agendas, materials
Facilitate meetings, provide minutes, track action items, records
Adequately facilitate productive meetings and communications
Documentation review, completion of action items, productive meetings
4. Communication Plan Develop effective communication plan
Effective implementation means all parties understand goals and progress
Observation of implementation;
document number of communication failures
5. Results of pre-work orientation meeting, mid-project review, annual close out meeting, lessons learned meetings
Facilitate, schedule and participate in interagency meetings
Facilitate effective and productive meetings, incorporate lessons learned
Documentation review, completion of action items, productive meetings
Task 3.2 Deliverables
1. Safety plan Develop robust safety plan Robust plan will reduce or eliminate safety problems Observation of implementation, document number of safety problems
2. Data quality control plan
Develop thorough data quality control plan on time
Thorough plan will protect data integrity
Observation of implementation, document number of data errors
3. Documentation showing coordination and acceptance of plans from Reclamation
Develop coordination process Accuracy – 95% of document error free
Documentation review
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
Performance Requirements Summary
Performance Standard Acceptable Quality Level Method of Surveillance
Task 3.3 deliverables
1. Biweekly Central Valley steelhead spawning surveys
Surveys shall be thorough, accurate and timely
Survey shall follow protocols – 95% of the time
Database/biweekly report review
2. Central Valley steelhead stranding and isolation pool surveys
Survey shall be thorough, accurate and timely
Survey shall follow protocols – 95% of the time
Database/survey report review
3. Populated databases Database reflects latest collected information
Accuracy – data collection shall be 95% error-free
Database review
Task 3.4 deliverables
1. Bi-weekly spawning survey reports
Reports shall be thorough, accurate and timely
Accuracy – 95% of document error-free
Documentation review
2. Stranding/isolation survey report
Reports shall be thorough, accurate and timely
Accuracy – 95% of document error-free
Documentation review
3. Data compilation and draft report
Prepare draft report for review Accuracy – 95% of document error-free
Results are clearly understood and documented
4. Annual close out meeting Discuss any edits to draft report Accuracy – 90% of document error-free
5. Final report Submit all electronic and paper documentation to government in usable form
Accuracy – 90% of document error-free
Final report required prior to final payment each year
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
6.0 GENERAL CONSIDERATIONS - GOVERNMENT FURNISHED
FACILITIES, SUPPLIES and SERVICES
6.1 Facilities, Supplies and Services
The physical work will be performed at the lower American River. Database and administrative work will be performed at the Contractor’s office.
6.2 Materials
This requirement is for labor support and no materials are expected to be procured by the Government under this order as part of order fulfillment. The Government will provide initial documentation and access to historical data and existing databases.
6.3 Reports
6.3.1 Safety Plan
The Safety Plan is maintained by the COR and updated by the Contractor. The Safety Plan addresses the conduct of the field studies. The plan shall include replacement of field equipment and annual preventative maintenance measures, as needed, to ensure a safe working environment. An updated plan shall be submitted by the Contractor two weeks after the pre-work orientation meeting. The Contractor shall return the updated Safety Plan to the Government annually during the Close Out Meeting.
6.3.2 Data Quality Control Plan
The COR maintains an existing Data Quality Control Plan addressing the collection, review, and confirmation of field data. An updated plan shall be submitted by the Contractor three weeks after the pre-work orientation meeting.
7.0 Contractor Furnished Items and Services
7.1 Supplies and Services
The Contractor shall furnish all supplies and services to meet performance requirements, except that specified in Section 6.0. See Appendix One for list of items historically used to perform this work.
7.2 Contractor Identification
The contractor is required to identify themselves as a contractor when attending meetings, answering government telephones or where their contractor status is not obvious to third parties (i.e., e-mail). The contractor personnel are also required to mark any documents as being contractor-prepared or ensure that their participation as contractors is appropriately disclosed.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
8.0 POINTS OF CONTACT
8.1 Contracting Officer’s Representative (COR)
Contracting Officer’s Representative (COR):
Sarah Perrin, Natural Resource Specialist Bureau of Reclamation Central California Area Office 7794 Folsom Dam Road Folsom, CA 95630 Voice (916) 537-7063; email: sperrin@usbr.gov
9.0 Payment Schedule
The Government intends to make delivery payments based on the Contractor’s timely submission of deliverables that meet or exceed the Government’s requirements. The Government will review these deliverables and either accept them, notify the Contractor of the need for corrections or changes, or provide a notice of rejection. The Contractor shall propose a payment schedule based on the deliverables table.
10.0 Intellectual Property
The United States Government funds this order. All intellectual property generated and/or delivered pursuant to this PWS shall be subject to appropriate federal acquisition regulations which entitle the Government to unlimited license rights in technical data and computer software developed exclusively with Government funds, a nonexclusive “paid- up” license to practice any patentable invention or discovery made during the performance of this contract, and a “paid-up” nonexclusive and irrevocable worldwide license to reproduce all works (including technical and scientific articles) produced during this contract.
11.0 Applicable Guidance – The Contractor shall complete appropriate environmental documentation to ensure compliance with applicable regulations, policy, and laws.
11.1 Equipment
The Government will not pay for this equipment. As a business professional, the Contractor will be expected to secure and provide all equipment necessary to perform the work described in the PWS.
The Contractor shall furnish the crew with the equipment necessary to conduct the surveys including one each of safety equipment at the beginning of each option year to the Fisheries Biologist and Fisheries Technician for use during the data collection phase.
mailto:mail:%20sperrin@usbr.gov
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
SOLICITATION CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
CLAUSE TITLE DATE
52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-
O0003) Jan 2019
52.219-14 Limitations on Subcontracting (DEVIATION 2019-O0003) Jan 2019 52.228-5 Insurance -- Work on a Government Installation Jan 1997 52.237-2 Protection of Government Buildings, Equipment, and Vegetation Apr 1984 52.242-13 Bankruptcy Jul 1995 52.212-4 Contract Terms and Conditions – Commercial Items Oct 2018 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors Dec 2013
52.242-15 Stop-Work Order Aug 1989 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content
Paper May 2011
52.204-7 System for Award Management Oct 2018 52.204-13 Service Contract Reporting Requirements Oct 2016 52.204-16 Commercial and Government Entity Code Reporting Jul 2016 52.204-18 Commercial and Government Entity Code Maintenance Jul 2016 52.223-5 Pollution Prevention and Right-to-know Information May 2011
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES
OR EXECUTIVE ORDERS-COMMERCIAL ITEMS
OCT 2019
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
http://farsite.hill.af.mil/
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.]
_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C.
4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved]
__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
__ (10) [Reserved]
__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
__ (ii) Alternate I (NOV 2011) of 52.219-3.
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (JAN 2011) of 52.219-4.
__ (13) [Reserved]
_X_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
__ (ii) Alternate I (NOV 2011).
__ (iii) Alternate II (NOV 2011).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
__ (ii) Alternate I (OCT 1995) of 52.219-7.
__ (iii) Alternate II (MAR 2004) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
__ (17)(i) 52.219-9, Small Business Subcontracting Plan (AUG 2018) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (NOV 2016) of 52.219-9.
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
__ (iii) Alternate II (NOV 2016) of 52.219-9.
__ (iv) Alternate III (NOV 2016) of 52.219-9.
__ (v) Alternate IV (AUG 2018) of 52.219-9.
__ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
_X_ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
_X_ (20) 52.219-16, Liquidated Damages - Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2019) (15 U.S.C. 657f).
_X_ (22) 52.219-28, Post Award Small Business Program Re-representation (JUL 2013) (15 U.S.C. 632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_X_ (25) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
_X_ (26) 52.222-19, Child Labor - Cooperation with Authorities and Remedies (OCT 2019) (E.O. 13126).
_X_ (27) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
_X_ (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
_X_ (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).
__ (ii) Alternate I (July 2014) of 52.222-35.
_X_ (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
__ (ii) Alternate I (July 2014) of 52.222-36.
_X_ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
_X_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
_X_ (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
_X_ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C.
6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
BUREAU OF RECLAMATION, MID-PACIFIC REGION
SACRAMENTO, CALIFORNIA
__ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O.
13693).
__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
__ (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (OCT 2015) of 52.223-13.
__ (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
(ii) Alternate I (Jun 2014) of 52.223-14.
__ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
__ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
_X_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
__ (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
__ (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).
__ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
__ (ii) Alternate I (JAN 2017) of 52.224-3.
__ (46) 52.225-1, Buy American - Supplies (MAY 2014) (41 U.S.C. chapter 83).
__ (47)(i) 52.225-3, Buy American - Free Trade Agreements - Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108- 302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (MAY 2014) of 52.225-3.
__ (iii) Alternate II (MAY 2014) of 52.225-3.
__ (iv) Alternate III (MAY 2014) of 52.225-3.
__ (48) 52.225-5,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .