1__NoaNet_Private_Network_-CPN_SOO_f73a5_0001.pdf

PDF 102 KB Posted

Attached to
CPN-GCPO REDUNDANT INTERNET SERVICE
Solicitation number
140R1724Q0056
Issued by

About this file

This document is a Statement of Objectives (SOO) for the Bureau of Reclamation, Pacific Northwest Region to procure 1 Gb of internet services to provide network redundancy for their Grand Coulee Dam location. The service would be connected through DOI-approved Fortigate routers and would link the GCPO GSS network with the rest of the BOR GSS network. The contract is for a 60-month term with an installation fee. The vendor will provide the internet termination equipment and ethernet handoff to the GCPO network. The service level agreement will be based on the provider's SLA for business customers using their 24x7 Network Operations Center. The related federal contract opportunity is Solicitation Number 140R1724Q0056, "CPN-GCPO REDUNDANT INTERNET SERVICE" issued by the Department of the Interior Bureau of Reclamation.

View the file

Other files

File Type Posted
Sol_140R1724Q0056_Amd_0001.pdf PDF
Sol_140R1724Q0056.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Narrative The Bureau of Reclamation, Pacific Northwest Region needs to procure internet services outside the current scope of the Lumens Networks contract for a solution that will provide connectivity for our

Grand Coulee Dam location to ensure dissimilar paths for network redundancy on aa NCI facility. This action will allow for dissimilar paths and provide network redundancy to help prevent the multiple network outages that have occurred under the current single source contract. This service would be connected through DOI approved Fortigate routers and would connect the GCPO GSS network with the rest of the BOR GSS network.

Technical and service details about this service associated with this request:

• 1 Gb of Internet access 60 month contract

• Installation fee

The vendor will provide internet termination equipment and provide ethernet handoff to the GCPO network equipment.

Software requirements None required.

Services The following items are needed to support the equipment throughout service.

Line Number

Part Number Description Service

Duration Qty

001 Activation Fee

002 Service Plan 1 Gb Synchronous Internet Connection 60 months 1

Requirements Subscription services must be delivered by contract.

Delivery Vendor will provide the CPE hardware that is necessary to provide connectivity to the site. All other hardware beyond CPE termination is being purchased by the BOR or using existing hardware.

Warranty No hardware is part of this contract.

Service Level Agreements Service level will be based on providers SLA for business customers utilizing provider’s 24x7 Network

Operations Center.

File details come from the government source that posted it. Updated .