About this file

This amendment to a federal solicitation modifies line items to require two rotary screw air compressors rated at 500 cubic feet per minute at 110 pounds per square inch gauge with a maximum working pressure of 150 pounds per square inch gauge. Each compressor must include a water cooler, refrigerated air dryer, variable speed drive, oil separator, air cooler, oil cooler, and graphic controller or human-machine interface. The amendment also modifies line items to require two air receiver tanks rated at 125 pounds per square inch gauge with a minimum capacity of 1,000 gallons and specific dimensional and connection requirements. The solicitation number is 140R1723Q0060 from the Department of the Interior Bureau of Reclamation for air compressors and associated equipment to support station service air needs at the Hungry Horse Field Office. The amendment extends the response due date to 5:00pm Pacific Daylight Time on August 9, 2023.

View the file

Other files for this federal contract opportunity

Other files attached to HH-AIR COMPRESSORS, newest first.
File Type Posted
Sol_140R1723Q0060_Amd_0001.pdf PDF
Sol_140R1723Q0060.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1723Q0060 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Grand Coulee WA 99133

R17

Hwy 155, PO Box 620 Grand Coulee Acquisition Group Pacific Northwest Region Bureau of Reclamation

08/02/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/25/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE PURPOSE OF THIS AMENDMENT IS TO POST THE SPECIFICATIONS.

A. THE SOLICITATION IS EXTENDED TO 1700 PDT, AUGUST 9, 2023.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

Station service air, at 110 PSIG, is needed to provide various station service air connections throughout the powerplant and dam. Normal station service air for the powerplant and dam is currently supplied by two, oil injected, rotary screw, air

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Paula Gross

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1723Q0060/0002 compressors. The current compressors:

- Each have an individual receiver tank.

- Are water cooled by the plant service water system. NOTE: Chlorinated water is used to prevent the build-up of algae in the cooling system.

- Are equipped with a refrigerated air dryer on the discharge air supply.

The station service air compressors currently in use at Hungry Horse Field Office normally run with one compressor operating on the LEAD

Pressure Setting and the other compressor operating on the LAG Pressure Setting.

- The compressor operating in the LEAD Pressure

Setting is set to automatically maintain station service air pressure at 98 PSIG.

- The compressor operating in the LAG Pressure

Setting is set to start if the station service air pressure drops to 88 PSIG.

Normal compressed air for the generator brakes of the current system is supplied by utilizing a

3/4-inch tie line between Station Service Air

Receiver No. 2 and the Brake Air Receiver. This supply is provided with two manually operated isolation valves and a check valve to prevent backflow of brake air into the station service air system. The current compressors:

- Are nominally rated at 500 cfm (at 110 PSI), with a maximum working pressure of 150 PSI.

- Are located in a controlled indoor atmosphere.

- Are Atlas Copco Rotary screw compressor

GA-90VSD-AFF.

FOLOWING ARE THE REQUIRED MINIMUM SALIENT

FEATURES OF THE NEW AIR COMPRESSORS AND RECEIVER

TANKS.

Change Item 00010 to read as follows(amount shown is the obligated amount):

00010 2-STAGE ROTARY SCREW AIR COMPRESSOR 2 EA

500 cfm (at 110 PSI), with a maximum working pressure of 150 PSI.

Water cooled

Refrigerated air dryer

Able to perform lead and lag duties when tied to

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1723Q0060/0002 sister air compressor

Air intake filter

Variable speed drive

Oil separator

Air cooler

Oil cooler

Graphic controller / HMI interface

460 / 3 phase VAC rated at no more than 175 full load amps

Service part availability

Size not to exceed 7 feet high, 12 feet length, 6 feet width

Minimum life span of 40,000 hours

Change Item 00020 to read as follows(amount shown is the obligated amount):

00020 AIR RECEIVER TANKS FOR AIR COMPRESSORS 2 EA

Rated at 125 PSI

Minimum capacity of 1,000 gallons

Maximum Height: 147.6"

Maximum Circumference: 120"

Center of Top Flange (intake): 95.25"

Pipe size (for both flanges): 8"

Maximum flange bolts: 8

Bottom flange 90 degrees right of intake flange at height of 36.6"

Top sided inspection port

2 each - 2" female NPT receptacles for pop off valves (orient to bottom flange front)

1 each - 1/4" female NPT for pressure gauge

(orient to bottom flange front)

1 each - 1/2" female NPT for brake air tie

(orient to bottom flange front)

Pop off valves rated at 125 psi (orient to bottom flange front)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)