This is a Performance Work Statement (PWS) for pest control services at two Bureau of Reclamation facilities—Minidoka Dam in Minidoka County, Idaho, and Palisades Dam in Bonneville County, Idaho—over a five-year period from August 22, 2026, to August 21, 2031, consisting of a base year plus four option periods.
The contractor shall perform monthly pest control treatments to control spiders, flying/stinging insects (excluding honeybees), ants, venomous snakes, ground squirrels, rock chucks (yellow-bellied marmots), pack rats, and mice at both dam facilities, their power plants, administrative buildings, maintenance shops, storage structures, embankments, and associated infrastructure. The contractor must provide all personnel, equipment including personal protective equipment, tools, materials, transportation, and supervision necessary to perform treatments. Work is restricted to normal business hours between 6:30 A.M. and 4:00 P.M., Monday through Thursday, excluding federal holidays. The contractor is responsible for furnishing all materials and equipment but is not responsible for manual retrieval and off-site disposal of deceased rodents across large acreages; maintenance of bait stations and fumigation is sufficient. Treatment areas at Minidoka Dam include 24 structures and embankments ranging from 140 to 77,625 square feet, while Palisades Dam includes 42 structures, residential housing units, and 44 acres of upstream and downstream dam faces. The contractor must obtain applicable permits, certifications, and licenses; develop a pest control plan and site safety plan during a post-award conference; provide monthly treatment logs in accordance with Professional Applicator Pesticide Application Records; and maintain a Quality Control Plan ensuring no visible evidence of pests during random inspections. All work must comply with Reclamation Safety and Health Standards, 29 CFR 1910, and Washington Administrative Code; only approved pesticides may be used, and pesticides must not be sprayed directly on electrical lines or equipment in switchyards. The contractor must notify the Contracting Officer (COR) at least one week in advance for residential housing treatments and 48 hours in advance of general facility arrival, and must report any accidents or injuries within 24 hours.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R1026Q0009_Amd_0001.pdf | ||
| Solicitation_QA_Pal_Min_Pest_Control_0001.pdf | ||
| Sol_140R1026Q0009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Pest Control Services for
Minidoka Dam and Palisades Dam
08/22/2026-08/21/2031
C.1 Introduction
C.2 Mission
C.3 Scope
C.4 Non-Personal Services
C.5 Business Relations
C.6 Contract Administration and Management
C.6.1 Contract Management
C.6.2 Contract Administration
C.7 Personnel Administration
C.8 Contractor Qualifications, Personnel, Disciplines, and Specialties
C.9 Location and Hours of Work
C.10 Performance Requirements
C.11 Special Requirements
C.12 Safety/Regulations/Policies…...……..……………………………………….………….7
C.13 Quality Control………………………………………………………………………………..7
C.14 Related Documents…
C.15 Reports or Data Deliverables
C.16 Exhibits
Performance Work Statement (PWS) Pest Control Services for
Minidoka Dam and Palisades Dam C.1 Introduction
Bureau of Reclamation (Reclamation) has a requirement for Pest Control Services at Minidoka Dam and Palisades Dam. The Minidoka Dam and Power Plant, Palisades Dam and Power Plant, facilities, camp housing, and surrounding structures at both locations shall be treated for control of spiders, flying/stinging insects (excluding honeybees), ants, venomous snakes, ground squirrels, rock chucks (yellow‑bellied marmots), pack rats, and mice. The Contractor shall develop a treatment program (Ideally monthly) that will have the greatest effect on pest control.
C.2 Mission Protect project facilities, facility personnel and provide public safety through pest control.
C.3 Scope The contractor shall provide all personnel, equipment (including personal protective equipment), tools, materials, transportation, supervision, and other items and incidental services necessary to satisfactorily identify and treat for pest control on Reclamation lands surrounding both Minidoka Dam, in Minidoka County, Idaho and Palisades Dam, in Bonneville County, Idaho.
C.4 Non-Personal Services The Government shall neither supervise contractor employees, nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (CO) immediately.
C.5 Business Relations The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
C.6 Contract Management and Administration The following subsections specify requirements for contract, management, and personnel administration.
C.6.1 Contract Management The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between their support operations.
C.6.2 Contract Administration The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on this requirement.
C.7 Personnel Administration The contractor shall provide the following management and support as required. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks.
C.8 Contractor Qualifications, Personnel, Disciplines, and Specialties
Deliverable: A01
8.1. The contractor shall possess applicable permits, certifications and licenses to complete services in accordance with this PWS as required by Federal, State and Local regulations. The contractor will ensure all documents are kept current. The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract as shown in the Performance Requirements.
Deliverable: A02
8.2. Upon award and prior to beginning work, the contractor shall be required to supply Reclamation with the legal names and other personal information of employees who will be working under this contract.
Deliverable: A03
8.3 During the Post-award Conference, the contractor shall provide a pest control plan on how pest control will be accomplished.
8.4 The Contractor shall attend a post-award conference with the CS and COR prior to the start of the performance period at a time agreed upon by the Contractor, COR, and CS. The purpose of the meeting will be to review and clarify any unclear requirements specified within the contract and for the Contractor to submit deliverables identified to be submitted during the post-award conference.
Deliverable: A04
8.5 During the Post-award Conference, the Contractor shall provide a Site Safety Plan that includes, a job hazard analysis, and a copy of the Label or Material Safety Data Sheet.
C.9 Location and Hours of Work
Accomplishment of the results contained in this PWS requires work at Reclamation lands surrounding both Minidoka Dam and Palisades Dam. The address of each facility is:
Minidoka Dam 951 E. Minidoka Dam Road Rupert, Idaho 83350
Palisades Dam 3933 Swan Valley Hwy 26 Irwin, Idaho 83428
The contractor will only be allowed access to areas for treatment during normal business hours, from 6:30 A.M. and must be completed by 4:00 P.M. Monday through Thursday, excluding federal holidays.
C.10 Performance Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.
Treatments should occur for:
Base Period: 08/22/26 – 08/21/27 Option Period 1: 08/22/27 – 08/21/28 Option Period 2: 08/22/28 – 08/21/29 Option Period 1: 08/22/29 – 08/21/30 Option Period 2: 08/22/30 – 08/21/31
Specific Tasks Task 1 – The contractor shall perform monthly “pest control services” to maintain effective control of spiders, flying/stinging insects (excluding honeybees, which will require the COR be notified for removal through governmentally approved process), ants, venomous snakes, ground squirrels, rock chucks (aka yellow-bellied marmot), pack rats, and mice on the interior and exterior for each area listed below *unless area is notated with detailed treatment. The contractor will not be responsible for the manual location, retrieval, and off-site disposal of deceased rodents across these large acreages. Maintenance of bait stations/fumigation is sufficient. There will be no need for live traps as they are already provided and maintained by the Bureau of Reclamation. Smaller animals will be disposed of by the facility on a needed basis or during regularly scheduled monthly visits.
The Contractor shall furnish all materials including but not limited to equipment necessary to perform the work required under these specifications. Materials (e.g., glue pads for traps, traps, chemical pesticides, bait) and equipment shall be suitable to perform services required. Bureau of Reclamation will not be held responsible for wear and tear or damage to Contractors’ equipment.
The contractor should inspect all listed areas with each visit. The contractor is not responsible for repairing burrows or damaged embankments.
(All square footages are approximates) (Buildings correlate with numbers on maps.)
Minidoka Dam Pest Control:
1. Sewage Treatment Lagoon Embankments (1,400 linear feet)
2. Used Oil Storage Building (870 sq. ft.)
3. Gas Cylinder Storage lean-to (180 sq. ft.)
4. Maintenance Shop Building (8,500 sq. ft.)
5. Lube and Oil Bay (3,000 sq. ft.)
6. Museum (2,400 sq. ft.)
7. Administration Building (4,600 sq. ft.)
8. Weir #1 (500 sq. ft.)
9. Minidoka Powerplant (10,000 sq. ft.)
10. Earth Embankment portion of dam near Minidoka Powerplant (.8 acres)
11. Inman Power Plant (8,600 sq. ft.)
12. Inman Headworks Building (140 sq. ft.)
13. Intake Structure deck platform (2,400 sq.ft)
14. – 16. Switch Yards (77,625 sq. ft. combined)
17. Walcott Park Lift Station Room (323 sq. ft.)
18. Walcott Park Wellhouse (800 sq. ft.)
19. – 21. Concrete Vault Restrooms (504 sq. ft. each)
22. North Gated Spillway Deck and Gate Operators (1,250 sq. ft.)
23. South Gated Spillway Deck and Gate Operators (6,500 sq. ft.)
24. Earth Embankment portion of dam South of the Burley Irrigation District Canal
Headworks (.65 acres)
Palisades Dam Pest Control: (* notates detailed treatment for area)
1. & 2. Vacuum Breaker Buildings (144 sq. ft. each)
3. Palisades Outlet Works (6,400 sq. ft.)
4. Palisades Powerplant (34,245 sq. ft.)
5. Palisades Machine Shop (3,927 sq. ft.)
6. Stilling basin pumphouse (196 sq. ft.)
7. Switch Yard (89,100 sq. ft.)
8. Switch Yard Building (144 sq. ft.)
9. Entrance Gate Building (200 sq. ft.)
10. & 11. Piezometer & Well house No. 9 buildings (485 sq. ft.)
25. Upstream and Downstream faces of the dam (44 acres)
12. Dam Intake Spillway Building (70 sq. ft.)
13. & 15. Dam Intake Power and Outlet Intake Buildings (200 sq. ft. each)
16. Training and Recreation Building (1,800 sq. ft.)
17. 20-stall garage (4,800 sq. ft.)
18. Core Shed (4,800 sq. ft.)
19. Lean-to (3,900 sq. ft.)
20. * Hazardous Materials Shed (250 sq. ft. exterior only)
21. * Heavy Equipment Garage Building (3,200 sq. ft. exterior only)
22. Electrical Storage Building (3,648 sq. ft.)
23. Maintenance Shop Building (2,700 sq. ft.)
24. Facility Office and Warehouse (3,648 sq. ft.)
25. Irrigation Well House (144 sq. ft.)
26. – 33. Government Camp Residential Housing (1,044 sq. ft. each)
34. – 41. 12x12’s storage buildings (144 sq. ft. each)
42. – 44. (3) residential garages (1,200 sq. ft. each)
Applicable Publications and Forms
• Professional Applicator Pesticide Application Records https://agri.idaho.gov/main/56-2/pesticides/pesticide-licensing/profession-applicator-record-keeping-requirements/
• http://www.usbr.gov/ssle/safety/RSHS/rshs.html
C.11 Special Requirements
a. The contractor must contact the COR at least 1 week in advance of treatment of the Palisades Dam Government Camp Residential housing. This will ensure the residents will be available to provide access to residents living quarters.
b. The contractor must contact the COR at least 48 hours in advance of arrival, this will ensure facility personnel available to provide access to for treatment of required areas.
c. Escorts will be available if the advanced notice is given as the contract requires. In the event no escort is available, we will work to coordinate with the contractor to identify another day and should pose a minimal schedule delay. This has not been an issue in past contracts.
d. The contractor shall contact the COR when rescheduling is needed.
e. The contractor must sign in and out of the visitor sign in book each time they treat the facility.
Deliverable: A05
e. The contractor will provide a monthly detailed treatment log report in accordance with the Professional Applicator Pesticide Application Records.
f. If the prime contractor employs a subcontractor to perform pest control services, the prime contractor shall conduct one site visit per quarter, occurring 15 to 30 days after each application, to evaluate (QA/QC) the effectiveness of the most recent treatment. These four annual visits must be evenly distributed—no more than one visit may occur within the same quarter.
g. Acceptable Quality Level (AQL)
• The COR will perform random inspections to determine quality acceptableness.
• Acceptable quality is no visible evidence (live pests, droppings, nests, webs, burrowing activity) at the time of inspection.
• If minor signs of evidence are observed, the COR will notify the pest control contractor so those items can be addressed during the contractor’s next scheduled monthly inspection/treatment.
https://agri.idaho.gov/main/56-2/pesticides/pesticide-licensing/profession-applicator-record-keeping-requirements/ https://agri.idaho.gov/main/56-2/pesticides/pesticide-licensing/profession-applicator-record-keeping-requirements/ http://www.usbr.gov/ssle/safety/RSHS/rshs.html
C.12 Safety/Regulations/Policies
12.1 All equipment and operations shall adhere to Reclamation Safety and Health Standards (RSHS), 2009 Edition, 29 CFR 1910 Safety and Health Regulations for General Industry, 2009 Edition and Washington Administrative Code (WAC), 2009 Edition.
12.2 The Contactor will only use approved pesticide products in the execution of work. The Contractor must dispose of all used and unused pesticides in accordance with current laws and regulations. No reinstate or excess pesticide or pesticide containers will be disposed of on Reclamation property. The applicator shall follow all manufacturers’ instructions and comply with all OSHA and Bureau of Reclamation Safety and Health Standards (RSHS).
12.3 The Contractor shall comply with all Federal, State and Local operational requirements, and licensing requirements as may be pertinent to the required commercial application of chemicals, pesticides and, herbicides.
12.4 The Contractor shall notify the COR within 24 hours of any accident or injury involving contractor employees in the performance of duties under this contract. Any injury or accident which occurs during work at the government facilities shall be documented using the approved form which may be obtained from the COR.
12.5 If a treatment will restrict access to any part of the facility, treatment must be arranged with the COR to prevent exposure to employees.
12.6 Traps will be maintained to control/prevent odor and possible contamination or infection.
12.7 Pesticides used by the Contractor for the control of spiders and flying/stinging insects must be nonflammable/nonexplosive.
12.8 Contractor shall not spray any pesticide materials directly onto any lines or equipment (transformers and transmissions lines) while working in the switchyards.
Deliverable: A06
C.13 Quality Control During the Post-award Conference, the Contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
The Contractor’s QCP is the means which they assure themselves that their work complies with the requirements of the contract.
The finalized QCP will be accepted by the Government at the time of the award of the Contract.
The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance.
The Contractor shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to the effective date of the change. The QCP shall be subject to the Governments review and approval.
The Government may find the QCP “unacceptable” whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 5 working days from receipt of notice that QCP is found “unacceptable.”
C.14 Related Documents The following Documents are related to this project:
- Quality Assurance Surveillance Plan (QASP)
- Maps with structure and building labels.
- Minidoka Dam Checklist
- Palisades Dam Checklist
C.15 Reports or Data Deliverables
Deliverables The Contractor shall provide deliverables as described in this PWS to the TR/COR.
Number Name Frequency Quantity
A01 Business Certificates
All applicable permits, certifications and licenses required by Federal, State and Local regulations. Documents.
Prior to commencing work and within one (1) week after receiving updated or renewed documents.
1 electronic copy
A02 Employee names Prior to commencing work and for each new employee.
1 electronic copy
A03 Pest Control Plan During the Post-award Conference
1 electronic copy
A04 Site Safety Plan During the Post-award Conference
1 electronic copy
A05 Treatment Log – Typed Monthly with invoice.
1 electronic copy
A06 Quality Control Plan During the Post-award Conference
1 electronic copy
C.16 Exhibits
Minidoka Dam
a. Map A – Minidoka Dam North - Building and structure identification at the Bureau of
Reclamation, Minidoka Dam Federal Land Located within Minidoka County, Idaho to be treated for pest control.
b. Map B – Lake Walcott State Park - Building and structure identification at the Bureau of Reclamation, Minidoka Dam Federal Land Located within Minidoka County, Idaho to be treated for pest control.
c. Map C – Minidoka Dam Downstream - Building and structure identification at the Bureau of Reclamation, Minidoka Dam Federal Land Located within Minidoka County, Idaho to be treated for pest control.
d. Map D – Minidoka Dam South - Building and structure identification at the Bureau of Reclamation, Minidoka Dam Federal Land Located within Minidoka County, Idaho to be treated for pest control.
Palisades Dam
e. Map A – Palisades Dam - Building and structure identification at the Bureau of
Reclamation, Palisades Dam Federal Land Located within Bonneville County, Idaho to be treated for pest control.
f. Map B – Palisades Dam Intake Structures - Building and structure identification at the Bureau of Reclamation, Palisades Dam Federal Land Located within Bonneville County, Idaho to be treated for pest control.
g. Map C – Palisades Camp - Building and structure identification at the Bureau of Reclamation, Palisades Dam Federal Land Located within Bonneville County, Idaho to be treated for pest control.
Summary Monthly pest control services at both locations shall include thorough inspections to verify the effectiveness of the contractor’s pest management plan. Because different pests become active at various times of the year, each site visit and treatment provides an opportunity to confirm whether previous applications were successful, identify areas requiring retreatment or adjustment, and detect any new pest activity covered under the contract. These recurring inspections ensure ongoing control, timely response to emerging issues, and consistent protection of both facilities.
| C.2 Mission |
| C.3 Scope |
| C.4 Non-Personal Services |
| C.5 Business Relations |
| C.6 Contract Management and Administration |
| C.6.1 Contract Management |
| C.6.2 Contract Administration |
| C.7 Personnel Administration |
| C.8 Contractor Qualifications, Personnel, Disciplines, and Specialties |
| 8.1. The contractor shall possess applicable permits, certifications and licenses to complete services in accordance with this PWS as required by Federal, State and Local regulations. The contractor will ensure all documents are kept current. The co... |
| C.9 Location and Hours of Work |
| C.10 Performance Requirements |
| Applicable Publications and Forms |
| C.13 Quality Control |
| C.14 Related Documents |
| Deliverables |
C.16 Exhibits
File details come from the government source that posted it. Updated .