Sources_Sought_PGP_Ton_Gantry_and_60_Ton_Bridge_Cranes_Spec_1.pdf

PDF 38 MB Posted

Attached to
John W. Keys PGP 70 Ton Gantry and 60 Ton Bridge Crane Replacement
Solicitation number
140R1025B0001
Issued by

About this file

This document is a Sources Sought announcement from the Department of the Interior Bureau of Reclamation regarding the replacement of a 70-ton gantry crane and a 60-ton bridge crane at the John W. Keys III Pump-Generating Plant in Grant County, Washington.

The work will involve the total replacement of each crane, including the crane structure, mechanical and electrical components, and power supply up to the main power disconnect switch. The estimated magnitude for this project is between $10,000,000 and $20,000,000. The Bureau of Reclamation is seeking responses from small businesses with the North American Industry Classification System (NAICS) code 333923, Overhead Traveling Crane, Hoist, and Monorail System Manufacturing, with a size standard of 1,250 employees. Small businesses, 8(a) firms, women-owned small businesses, service-disabled veteran-owned small businesses, HUBZone firms, and Indian small business economic enterprises are encouraged to respond. Responses are requested by the close of business on Monday, November 4, 2024. Draft drawings will be provided upon completion of a non-disclosure agreement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Specifications October 2024

John W. Keys PGP 70T Gantry and 60T Bridge Crane Replacement

John W. Keys, III Pump-Generating Plant Columbia Basin Project, Washington

Solicitation No. 140R1025B0001

This solicitation issued by Contracting Officer

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer

Telephone Number: (208) 378-5364

CRANES REPLACEMENT

John W. Keys, III Pump-Generating Plant

Columbia Basin Project, Washington

FOREWORD

Work is located at near the city of Coulee Dam, in Grant County, Washington.

Principal components of work include removing and disposing of existing cranes and furnishing and installing one new bridge crane and one new gantry crane. Work includes designing and building principal components including the crane structure, mechanical and electrical components, and power supply up to the main power disconnect switch.

SEE SECTION L FOR SITE VISIT INFORMATION. ATTENDEES WILL PROVIDE

THEIR OWN PERSONAL PROTECTION EQUIPMENT (PPE) TO INCLUDE: SAFETY

GLASSES, SAFETY BOOTS, HARD HATS, AND SAFETY VESTS.

FOR DATE AND PLACE OF PROPOSAL DELIVERY, SEE "SOLICITATION, OFFER,

AND AWARD," STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" (LATEST EDITION AS

REVISED, WITH REVISIONS AT https://www.usbr.gov/safety/rshs/index.html. WHICH

IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR

1452.223-81 SAFETY AND HEALTH."

This page intentionally left blank.

John W Keys PGP 70T Gantry and 60T Bridge Crane Replacement Columbia Basin Project Solicitation No. 140R1025B0001

Price Schedule

B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

70T GANTRY AND 60T BRIDGE CRANE REPLACEMENT

John W. Keys Pump-Generating Plant Columbia Basin Project, Washington

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete the Price Schedule A and Optional Price Schedules B through D. Offers for less than the total of Price Schedule A and Optional Price Schedules B through D will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated based on the total of the Price Schedule A and Optional Price Schedules B through D.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) The Government will award the Price Schedule A based on available funds. Optional Price Schedules B through D are optional price schedules that the Government is not required to exercise.

(d) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(e) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(f) Definitions:

(1) CLIN – Contract Line Item Number.

(2) CLIN types are designated in the Price Schedules as follows:

a. C - Construction

b. S – Supply

(g) Clauses and Provisions in this solicitation apply to all or only some of the CLINs.

Clauses and Provisions are listed in the solicitation with a leading character that designates the CLIN type, and the Clause or Provision it applies to as follows:

(1) C - applies to Construction CLINS

B - 2

(2) S – applies to Supply CLINS

(3) A - All CLIN – Contract Line Item Number

PRICE SCHEDULE A

CLIN TYPE Section Supplies or Services Quantity and Unit Unit Price

Amoun t

A-1. C WBR

1452.232-

Mobilization and Preparatory Work

For the lump sum of $

A-2. C 01 31 30 Contract Document Management System

For the lump sum of $

A-3. C 01 78 30 As-Built, Final As-Built Drawings, and Operations & Maintenance (O&M) Manuals for Gantry Crane

Each $ $

A-4. C 01 78 30 As-Built, Final Drawings As-Built, and Operations & Maintenance (O&M) Manuals for Bridge Crane

Each $ $

A-5. C 01 79 20 Training For the lump sum of $

A-6. C 02 82 20 Asbestos Abatement, 60 Ton Bridge Crane

For the lump sum of $

A-7. C 02 82 20 Asbestos Abatement, 70 Ton Gantry Crane

For the lump sum of $

A-8. S 25 00 01 Furnish and Deliver New Crane Automation Control System for Gantry and Bridge Cranes

For the lump sum of $

A-9. C 25 00 01 Install and Test New Crane Automation Control System for Gantry and Bridge Cranes

For the lump sum of $

A-10. C 25 00 01 Provide Automation Control System Support for Gantry and Bridge Cranes

For the lump sum of $

B - 3

CLIN TYPE Section Supplies or Services Quantity and Unit

Unit Price

Amoun t

A-11. S 25 00 01 Spare Parts for Automation Control System for Gantry and Bridge Cranes

For the lump sum of $

A-12. C 26 05 10 Conductors and Cables For the lump sum of $

A-13. C 26 05 33 Raceways and Boxes For the lump sum of $

A-14. C 26 05 60 Identification, Warning, and Safety Signs

For the lump sum of $

A-15. C 26 24 42 Distribution Panelboards For the lump sum of $

A-16. C 26 24 43 Motor Control Center For the lump sum of $

A-17. C 26 43 13 Surge Protection Devices for Electrical Circuits

For the lump sum of $

A-18. S 41 22 13 Fabricate and Deliver 60 Ton Bridge Crane

For the lump sum of $

A-19. C 41 22 13 Install 60 Ton Bridge Crane

For the lump sum of $

A-20. C 41 22 13 Conduct Rail Survey of 60 Ton Bridge Crane Runway Rails

For the lump sum of $

A-21. S 41 22 14 Fabricate and Deliver 70 Ton Gantry Crane

For the lump sum of $

A-22. C 41 22 14 Install 70 Ton Gantry Crane

For the lump sum of $

A-23. C 41 22 14 Conduct Rail Survey of 70 Ton Gantry Crane Runway Rails

For the lump sum of $

A-24. C 41 22 15 Remove Existing 60 Ton Bridge Crane

For the lump sum of $

A-25. C 41 22 15 Remove Existing 70 Ton Gantry Crane

For the lump sum of $

A-26. S 41 22 16 Furnish and Deliver New Crane Electrical System for 60 Ton Bridge Crane

B - 4

CLIN TYPE Section Supplies or Services Quantity and Unit

Unit Price

Amoun t

A-27. C 41 22 16 Install New Crane Electrical System for 60 Ton Bridge Crane

For the lump sum of $

A-28. S 41 22 17 Furnish and Deliver New Crane Electrical System for 70 Ton Gantry Crane

For the lump sum of $

A-29. C 41 22 17 Install New Crane Electrical System for 70 Ton Gantry Crane

TOTAL FOR PRICE SCHEDULE A $_________________

OPTIONAL PRICE SCHEDULE B

and Unit

Unit Price

Amount

B-1 S 41 22 13 Furnish and Deliver 60 Ton Bridge Crane Runway Rails

For the lump sum of $

B-2 C 41 22 13 Install 60 Ton Bridge Crane Runway Rails

For the lump sum of $

B-3 S 41 22 14 Furnish and Deliver 70 Ton Gantry Crane Runway Rails

For the lump sum of $

B-4 C 41 22 14 Install 70 Ton Gantry Crane Runway Rails

For the lump sum of $

B-5 C 41 22 15 Remove and Dispose 60 Ton Bridge Crane Runway Rails

For the lump sum of $

B-6 C 41 22 15 Remove and Dispose 70 Ton Gantry Crane Runway Rails

For the lump sum of

TOTAL FOR OPTIONAL PRICE SCHEDULE B $_________________

B - 5

OPTIONAL PRICE SCHEDULE C

and Unit

Unit Price

Amount

C-1 C 41 22 13 Adjust and Repair 60 Ton Bridge Crane Runway Rails

TOTAL FOR OPTIONAL PRICE SCHEDULE C $_________________

OPTIONAL PRICE SCHEDULE D

and Unit

Unit Price

Amount

D-1 C 41 22 14 Adjust and Repair 70 Ton Gantry Crane Runway Rails

TOTAL FOR OPTIONAL PRICE SCHEDULE D $_________________

TOTAL FOR PRICE SCHEDULES A through D $_________________

END OF SUPPLIES OR SERVICES AND PRICES/COSTS

B - 6

TECHNICAL SERVICE CENTER

WRITTEN SPECIFICATIONS SIGNATURE SHEET

Specifications Title: John W. Keys Pumping Generator Plant - 70-Ton Gantry

Crane and 60-Ton Bridge Crane Replacement

Project Title: Columbia Basin Project - Washington

Region: CPN

Prepared:

Technical Approval:

Certified:

AMD/MOD

No.

Technical Approval Signature:

Prepared By Signature:

Revised Sections:

GERALD HORTON HORTON

Date: 2024.07.30 10:10:10 -06'00' P.E.

Digitally signed by ZACHARY

CEPAK

Date: 2024.07.30 11:33:19 -06'00' P.E.

P.E.

DIVISION 01 - GENERAL REQUIREMENTS

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 SUMMARY OF WORK

A. Design and build two crane replacements at John W. Keys, III Pump-Generating Plant near the city of Coulee Dam, in Grant County, Washington.

B. The 70T Star Iron and Steel Gantry Crane and the 60T Whiting Bridge Crane replacement will involve the total replacement of each crane in entirety. This includes the crane structure, mechanical and electrical components, and power supply up to the main power disconnect switch.

1. Principle Components of work include:

a. Designing, coordinating, furnishing materials and performing work for:

1) Existing cranes removal and disposal.

2) Existing cranes rail adjustment and alignment or replacement.

3) New cranes installation.

4) Asbestos and hazardous materials abatement.

5) Fabrication.

6) Electrical power supply replacement up to the respective main power disconnects.

b. Commissioning. - Perform load tests and provide operation and maintenance training.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Summary of Work

01 11 00 - 2

Other Contracts

01 12 10 - 1

SECTION 01 12 10

OTHER CONTRACTS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 OTHER WORK

A. During work under this contract, other work that may be performed in the vicinity of the work by Reclamation and other contractors includes the following:

1. John W. Keys, III Pump-Generating Plant.

B. Cooperate and coordinate with other contractors on access to and use of work areas and contractor use areas. Comply with the clause at FAR 52.236-8 - Other Contracts.

C. Cooperate and coordinate with other contractors on use of temporary utilities.

D. Cooperate and coordinate with other contractors on maintaining dust-free operations.

E. Cooperate and coordinate with Left and Right Powerhouse operating and maintenance personnel.

1. Laser Light show at Grand Coulee typically starts on Friday prior to Memorial

Day through July 31st and starts at 10 pm. From August 1st through the August 31st , at 9:30 pm, and September 1st through September 30th at 8:30pm.

2. Lights in both the Right and Left Powerhouses must be shut off 30 minutes prior to the start of the Laser Light show and all contractor employees must be off site.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Other Contracts

01 12 10 - 2

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in Price Schedule A for other items of work.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Utilities including air, power, and water lines; fire hydrants; and compressor station.

4) First-aid and medical facilities.

5) Areas for processing, storing, and disposing of waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

Use of Site 01 14 10 - 2

1.03 PROJECT CONDITIONS

A. Parking and laydown areas are limited. Contractor shall minimize space required. Use areas approved by COR.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.

1.04 WORK HOURS AND RESTRICTIONS

A. Due to security, the Contractor will only be allowed on site when an authorized Government representative, (i.e. Government inspector), is available.

B. Restrict material deliveries and removal of materials from jobsite to Monday through Friday unless approved by COR. Material deliveries and removal of materials from jobsite not allowed on weekends and holidays.

C. Material deliveries require inspections by the Government before being allowed onsite.

Coordinate deliveries with COR 48-hours in advance to avoid unanticipated delays during deliveries.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 RESTORATION

A. Restore Contractor use areas to pre-construction condition.

Interruption of Service

01 14 30 - 1

SECTION 01 14 30

INTERRUPTION OF SERVICE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include cost in prices offered in Price Schedule A for items of work for which interruption of services are required.

1.02 SUBMITTALS

A. Submit in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 30-1, Interruption of Service Request:

1. Area where work will be done (by number or other description).

2. Outline procedures for accomplishing work including:

a. Specific safety precautions to be taken.

b. Type and location of barricades.

c. Warning signs.

d. Protective grounds and devices to be used.

3. Commencement time of work.

4. Duration of work.

5. Number of personnel and their classification.

6. Description of equipment to be used.

7. Information indicating that required materials are on site or data indicating shipping dates of materials not on site.

1.03 PROJECT CONDITIONS

A. Coordinate and schedule interruption of services with COR:

1. Coordinate work with Government operations.

2. No specific interruption of service request will be considered unless:

a. COR has reasonable assurance that materials and equipment required for work will be onsite.

b. Contractor will be prepared to perform work on date and during period of time requested for specific interruption of service.

Interruption of Service

01 14 30 - 2

3. Allowable time and available interruption of service periods will govern interruption of service requests, work scheduling, onsite delivery of materials, and required drawings and data submittals.

B. Work cannot be performed during an approved interruption of service period, notify COR that interruption of service is not required.

C. Show construction interruption of services greater than 4 hours in construction schedule.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Project Management and Coordination

01 31 19 - 1

SECTION 01 31 19

PROJECT MANAGEMENT AND COORDINATION

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in Price Schedule A for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards, including revisions posted at:

https://www.usbr.gov/safety/rshs/index.html

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals:

B. RSN 01 31 19-1, Pre-Design Meeting Notification:

1. Provide confirmation to COR regarding requested date and time of meeting and indicate who will be attending and affiliations.

a. Provide copies of preliminary layout drawings.

C. RSN 01 31 19-2, Design and Progress Review Meetings Notification:

1. Provide confirmation to COR regarding requested date and time of meeting and indicate who will be attending and affiliations.

1.04 PROJECT COORDINATION

A. The following meetings are considered significant, but do not relieve the Contractor from the responsibility of attending other meetings required by the specifications. The Preconstruction Conference described in clause at FAR52.236-26 is a separate meeting requirement from the meetings listed in this section.

1. Contractor Safety Program Review: See RSHS Section 1.03 for requirements.

a. This meeting will take place in conjunction with the pre-design meeting.

2. Pre-Design Meeting:

a. Date: No later than sixty (60) days after receipt of Notice to Proceed and prior to performing work on the required RSNs for the equipment.

b. Location: Bureau of Reclamation, Grand Coulee Power Office, Hwy 155 Grand Coulee, Washington, unless otherwise directed by the CO.

01 31 19 - 2

c. Meeting length: Not to exceed 8 hours.

d. Purpose: Review with Government personnel electrical and mechanical drawings, data, and technical requirements of specifications for the project.

e. Attendees: Responsible engineering representatives who fully comprehend the specifications with respect to technical requirements, equipment to be furnished, and coordination necessary to complete electrical design. Representatives shall include:

1) Project manager and project engineer from Contractor.

2) CO, COR, project manager and project engineer from GCPO.

3) One from prime electrical subcontractor.

4) Contractor’s senior safety officer.

f. Within thirty (30) calendar days after conclusion of pre-design meeting, Government will furnish Contractor a letter regarding items discussed at conference with enclosed copies of pertinent drawings and data marked with Government’s comments.

g. Provide following preliminary information at meeting:

1) Scope of work.

2) Proposed schedule.

3) Schedule of future Design and Progress Review Meetings. The

Contractor shall furnish a schedule of design and progress meetings to COR for approval.

4) Shipping, delivery, storage, installation, and on-site assembly procedures. Include and provide:

a) Name and qualifications of manufacturer’s engineer to be onsite, if applicable.

b) Considerations to address prevention of shipping damage.

5) Installation procedures in accordance with applicable specification sections and drawings.

6) Cabinet layouts.

3. Design and Progress Review Meetings:

a. Local location: Bureau of Reclamation, Grand Coulee Power Office, Hwy 155 Grand Coulee, Washington, unless otherwise directed by the CO.

1) Contractor and subcontractor representatives not onsite may participate in meeting via telephone conference.

b. Meeting length: Not to exceed 4 hours.

c. Attendees: Responsible engineering representatives who fully comprehend the specifications with respect to technical requirements, 01 31 19 - 3 equipment to be furnished, and coordination necessary to complete electrical design. Representatives shall include:

1) Project manager and project engineer from Contractor.

2) CO, COR, project manager and project engineer from GCPO.

3) One from prime electrical subcontractor.

4) One from prime mechanical subcontractor.

d. Purpose:

1) Meet with COR to review progress made prior to the end date of the progress payment period.

2) Review with Government personnel electrical and mechanical drawings, data, and technical requirements of specifications.

Schedule, Progress, and Coordination:

a) Review safety, progress made, schedule, project issues, submittals, Request for Information (RFI), and resolution necessary to meet specifications requirements.

b) Review dates that activities were started and completed, remaining duration, and percent complete.

c) Review submittals register, submittals currently in review and approval, and meeting submittals due dates or delivery time frames.

3) Discuss design and schedule.

e. Contractor is responsible for organizing, coordinating, and taking notes for the progress review meetings.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

01 31 19 - 4

Contract Document Management System 01 31 30 - 1

SECTION 01 31 30

CONTRACT DOCUMENT MANAGEMENT SYSTEM

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Contract Document Management System:

1. Payment: Lump-sum price offered in Price Schedule A.

1.02 DEFINITIONS

A. CDMS: Contract Document Management System.

1. Contract Documents include, but are not limited to:

a. Specifications.

b. Contract Drawings.

c. Submittals.

d. RFCs: Request for Change (Contractor generated document).

e. RFIs: Request for Information (Contractor generated document).

f. RFPs: Request for Proposal (Reclamation generated document).

g. CMs: Contract Modifications.

h. Value Engineering Proposals.

i. Bureau of Reclamation (Reclamation) Inspection Reports.

j. Contract Schedules.

k. Meeting Agendas and Meeting Minutes.

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 01 31 30-1, Approval Data:

1. Documentation of system capabilities.

2. Instructions for system use.

01 31 30 - 2

C. RSN 01 31 30-2, Final Data:

1. DVD or CD of documents uploaded to CDMS.

a. Includes, but not limited to the following: RFI’s, Submittals and Correspondence.

1.04 QUALIFICATIONS

A. System provider: At least 5-years successful performance in providing required services.

1.05 CDMS REQUIREMENTS

A. CDMS shall be capable of generating, storing, tracking, categorizing, and managing Contract Documents.

B. Access:

1. Web-based:

a. Contract Documents are stored and accessed by authorized individuals via an internet site.

b. Compatible with web browsers MS Internet Explorer, Apple Safari, Mozilla Firefox, and Google Chrome.

2. Ability to upload Contract Documents and make available for user download in supported file formats, minimum:

a. Portable Document Format (.pdf).

b. MS Word.

c. MS Excel.

d. MS Project.

e. Oracle Primavera P6 Project Manager.

f. Drawing (.dwg).

g. Contract Manager.

3. Allow Contract Documents to be prepared by Contractor or by Government.

a. Preparing organization will control access of documents. See Document

Security and Backup paragraph below.

4. Contractor and Government shall each have a project manager for CDMS:

a. Each project manager shall have capabilities to assign users within their organization and to assign user rights which control access to documents based on user class and document type.

b. Each organization shall be capable of defining its access hierarchy.

c. Inclusion of users will be prerogative of organizational project manager.

01 31 30 - 3

d. Government shall be able to create and modify project properties (i.e., Contractor, project location, description, bid amount, project directory, etc.).

5. Email notifications shall be automatically sent to selectable users when new documents are submitted and available for viewing, or alerts are generated.

Examples:

a. Updates to project information (e.g., entry of a new submittal).

b. Changes to project information (e.g., approval of a submittal).

c. Alerts (e.g., submittal under review for >15 days without action).

6. Ability to link files: examples:

a. RFP linked to a CM.

b. Submittal linked to a Specification or Drawing.

C. Reports:

1. CDMS shall generate reports that list and sort documents by status examples:

a. Submittals that have been approved.

b. Invoices paid to date.

c. RFIs under review.

2. Generate alerts when documents requiring action approach or exceed allowable time.

3. Generate customizable summary reports; examples include:

a. Submittal Turn-around.

b. RFI Turn-Around.

c. CM Processing Turn-Around.

d. Total CM costs.

e. Total CM Request Exposure.

4. Reports shall be printable, exportable as searchable .pdf or printer friendly HTML, and exportable to Excel, XML, or CSV.

5. Ability to link from an item in a report directly to the item by clicking on it:

a. For example: in a submittal report, clicking on a submittal that is 15-days old takes you directly to information on that submittal.

6. Capable of producing a complete and logically organized set of documents within

CDMS in both .pdf and .xml format.

D. Document Security and Backup:

1. SSL encryption for secured data exchange between browser and server (Secure access to documents and information).

01 31 30 - 4

2. Allow document access security until authoring party chooses to share it with others:

a. Show parties that have access to a document.

b. Extent of document sharing shall be determined by authoring party.

c. Once documents are shared, track documents so that changes cannot occur without a record of changes.

3. Backup/Archiving to FTP site of documents to which an organization has access on a regular (minimum monthly) basis.

4. Documents shall be downloadable to FTP sites where Government and other organizations can each access their own data confidentially.

E. General Tracking and Control:

1. Documents shall be grouped into categories (Submittals, RFI, RFP, CM, Payments, Daily Inspection Reports, and Meeting Minutes).

2. CDMS shall track:

a. When documents were received or returned, as well as status of documents (e.g. Under Review; or Returned, Approved or Rejected, etc.).

3. Document changes including who entered or changed document and date change was made.

4. When a reviewer has opened an item.

F. Submittal Tracking and Control:

1. Ability to create master list of submittals (“Schedule of Submittals”.)

2. Customizable standard submittal form for entering information:

a. Required information includes:

1) Required submittal number (RSN), title, description, and specification section.

b. Upload submittal data in electronic format.

3. Track date received, date response due, date returned, and status:

a. Status designations may be modified to fit Government standard designations – Approved, approved subject to identified changes, or not approved.

4. Supply Submittal Tracking form for Government to enter review comments and action taken. Allow customizing of submittal tracking form:

a. Allow for Government to route submittal to third parties (e.g., consultant, internal design or operations and maintenance groups, etc.) by generating design-review transmittals with each submittal package item, to track status of individual sub-items within submittal package, and to route each sub-item to the appropriate reviewers.

5. Ability to generate automatic notification after specified days without response.

01 31 30 - 5

G. RFI Tracking and Control:

1. Supply standard RFI form to enter information.

2. Ability to create or attach documents to the RFI form or links to other documents within CDMS.

3. Ability for Government to route RFI to appropriate reviewers and for reviewers to enter comments into standard response form.

H. Inspection Reports Tracking and Control:

1. Ability to attach Reclamation standard inspection and report forms into CDMS and ability to create customizable inspection forms in CDMS. Typical forms:

a. Daily Inspection Report (DIR).

b. Survey requests.

c. Plant inspection reports.

d. Testing reports.

2. Ability to link or attach photos to forms and link forms to other documents within

CDMS.

I. Contract Modifications:

1. Supply standard Contractor Proposal form with ability to attach documents and link to other documents within CDMS.

2. Supply ability to upload Government’s standard CM form and RFP forms, or create an acceptable alternative, to enter information.

3. Ability to attach documents to these forms, and link to other documents within

CDMS.

4. Ability for Contractor to respond to RFP and CM form with Cost and Time impacts.

5. Ability to track date CM issued and date responded, with automatic notification after specified days without response.

J. Cost Tracking and Payment Request Management:

1. Ability to import payment bid items cost from a MS Excel spreadsheet.

2. Ability to edit percent complete and payment amount each month. Format to be spreadsheet, e.g. items available for editing at once, rather than needing to edit one item at a time, save, open next item and edit that, etc.

K. Correspondence:

1. Ability to generate letters and memos:

a. Ability to attach documents to letters and memos, and to reference other documents within CDMS.

b. Ability to automatically assign sequential numbers to letters and memos.

01 31 30 - 6

2. Ability to generate responses to letters and memos:

a. System automatically generates memo suffixes; e.g., 1st response to Memo

32 to be 32.1, 2nd response to be 32.2, etc.

3. Official correspondence from Reclamation to Contractor shall contain

Reclamation’s official letterhead and corresponding logos.

4. Ability to generate meeting agendas and meeting minutes and to attach documents to the minutes:

a. CDMS shall automatically assign sequential meeting numbers.

L. Miscellaneous Tracking and Controls:

1. Ability to generate logs tracking RFIs, CORs, COs, Submittals, Payments, Memos, DIR’s, survey requests, plant inspection reports and testing reports.

2. Ability to filter logs based on criteria e.g., for Submittals: Specification Section, Days Out, Status (approved, partially approved, approved subject to identified changes and resubmit, or not approved.); for RFI’s: Days out, Status (Open/Closed), Specification Section/Dwg No., and Responsibility/Ball-In-Court.

3. Ability to sort Logs based on a criterion e.g., for Submittal, Specification Section, Days Out, Status, or other criteria determined by COR.

4. Ability to provide forms to match Reclamation’s CM Form and Progress Payment Form or other forms when needed.

5. Ability to track Cost Exposure with links to RFI and CM requests.

6. Ability to measure productivity benchmarks on a project such as computing average review days for RFIs and submittals, categorize CMs, and track total CM percentages by category.

7. Ability for keyword search of documents in database.

8. Ability to allow online Payment Requests (electronic invoicing) by Contractor.

M. Budget and Funding Source Tracking:

1. Ability to enter funding sources and assign contract line items to multiple funding sources.

PART 2 PRODUCTS

A. Commercially available products having the salient characteristics of Parts 1 and 3.

01 31 30 - 7

PART 3 EXECUTION

3.01 IMPLEMENTATION

A. CDMS shall be in place and operating before Contractor transmits any Contract Documents, to Government, except RSN 01 31 30-1, Approval Data:

1. CDMS operation includes COR, or other authorized Government representative, having program control to assign users and user rights to Government personnel to access appropriate areas of the system.

B. Contractor shall input entrees to the Schedule of Submittals before making submittals.

Include:

1. RSNs listed in List of Submittals table found in Section 01 33 00.

2. Scheduled submittal date.

C. Contractor shall provide a report of submittal status monthly or as requested by COR.

Submittal status report shall be in a table format and include:

1. Required Submittal Number (RSN).

2. Section Title.

3. Submittal Title.

4. Date Submitted.

5. Date of Response.

6. Approval Status (approved, partially approved, approved subject to identified changes and resubmit, or not approved.)

7. Days in Review.

8. Due Date.

D. CDMS shall be operational until final project closeout.

01 31 30 - 8

Construction Program

01 32 10 - 1

SECTION 01 32 10

CONSTRUCTION PROGRAM

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Costs:

1. Developing Baseline Schedule: Include in lump-sum price offered in Prices

Schedule A for Mobilization and Preparatory Work.

1.02 DEFINITIONS

A. Schedule: The Critical Path Method (CPM) of planning and scheduling a construction project where activities are arranged based on activity relationships and network calculations determine when activities can be performed and the critical path of the project.

B. Project Calendar(s): Cross reference of numerical workdays with calendar days. Project calendars serve as the basis for day/date conversion and assign workdays and non-workdays.

C. Resources: Equipment, labor or crews, materials, subcontractors, fabricators, manufacturers, and consultants.

D. Out of Sequence Work: An activity that starts before its predecessor activities are completed.

1.03 REFERENCE STANDARDS

A. Associated General Contractors of America (AGC)

1. AGC Manual Construction Planning and Scheduling

Manual, 2004

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

1. Furnish database files in format compatible with Oracle Primavera P6

Professional Project Management.

2. Upon request, provide information and data used to develop and maintain the

Construction Program to the CO.

B. RSN 01 32 10-1, Representative Information:

01 32 10 - 2

1. Designation of authorized representative to develop and maintain Construction Program. Include resume with training and experience.

C. RSN 01 32 10-2, Baseline Schedule:

1. Include:

a. Construction Program/Schedule database.

b. Definition of project calendars.

c. Primavera layout file (.plf).

d. Primavera file extension (.xer)

e. Gantt chart (Bar chart) for project on 11 by 17-inch print(s) and in portable document format (.pdf).

f. Activity report including logic constraints consisting of predecessors, successors, and constraint dates.

g. Tabular listings of resources and resource limitations used to produce baseline schedule. Correlate resources with schedule assumptions and offered price. Resource listings may be independent of schedule database.

h. Narrative explanation of project schedule development. Include impacts of resource limitations and weather conditions on project schedule development. Include planned number of work hours per day and hours per day for subcontractors.

D. RSN 01 32 10-3, Updated Schedule Reports:

1. This submittal is required for a proper invoice for progress payments in accordance with the clauses at FAR 52.232-27 - Prompt Payment for Construction Contracts and WBR 1452.232-82 - Other Invoice Requirements. In accordance with subparagraph (a)(i)(A) of the clause at FAR 52.232-27 - Prompt Payment for Construction Contracts, Government disapproval of this submittal will be considered failure of the Contractor to comply with contract requirements and payment due date may be delayed until 14 days after submittal contents are approved.

2. Include:

a. Construction Program database with updated activity and milestone data.

b. Definition of project calendars if revised from baseline calendars.

c. Primavera layout file (.plf).

d. Primavera file extension (.xer)

e. Gantt chart for project on 11 by 17-inch print(s) and in portable document format (.pdf).

f. Narrative report specifically stating status of project.

01 32 10 - 3

1) When negative float exists, cite specific actions and conditions which caused "behind schedule" condition and provide proposed course of action to complete the project within the specified delivery time. When float changed from previous month’s updated schedule, explain reason for change.

2) List of Contractor-initiated changes to current schedule stating reason for action taken and unresolved issues relating to the Construction Program. Government reserves the right to reject Contractor-initiated changes to current schedule which negatively impact Government action which was initiated on the basis of current schedule.

3) Discuss contract milestones and significant activities that were started, continued, or completed during the update period or scheduled during the next update period.

g. Submittal Register:

1) List submittals as listed in Table 01 33 00A.

2) Update Submittal Register monthly to include submittals and revised submittals. Register fields shall include RSN name and number, date submitted, date of response, status (e.g., approved, not approved, resubmittal required).

3) This register document is separate from scheduling database.

E. RSN 01 32 10-4, Time Impact Analysis:

1. Include:

a. Construction Program database with proposed revised activity and milestone data.

b. Proposed revised schedule due to change or delay. Highlight or list added, changed, or deleted activities.

c. Primavera layout file (.plf).

d. Primavera file extension (.xer)

e. Gantt chart for project on 11 by 17-inch print(s) and in portable document format (.pdf).

f. Narrative report explaining results and conclusions.

1.05 QUALIFICATIONS

A. Representative: Experienced in developing and maintaining construction schedules and knowledgeable of activities and progress on-site to develop and maintain accurate and reliable schedules. Experience shall include scheduling for at least two other projects of comparable complexity and Primavera P6 training offered by certified instructors.

01 32 10 - 4

1.06 GENERAL

A. Develop, maintain, and use Construction Program to plan, monitor, evaluate, and report accomplishment of work.

1.07 SCHEDULES

A. Prepare construction schedules using Critical Path Method outlined in AGC Manual. Use a computer software program to perform mathematical analysis of scheduling data.

1. Prepare schedule based on required sequence and interdependence of activities.

Logically sequence activities.

2. Prepare detailed activity network for accomplishing required work organized by

Work Breakdown Structure (WBS). Utilize WBS in lieu of activity codes for organization of schedule. If activity codes are utilized in addition to WBS, use unique activity code names assigned as project codes rather than global codes.

3. Activities except “Award” shall have predecessor activities and activities except “Contract Complete” shall have successor activities.

4. Meet contract requirements; milestone(s) in accordance with the clause at FAR 52.211-10, Commencement, Prosecution, and Completion of Work; and relevant clauses and specification sections. Include interim milestone dates, Government interface dates, contract completion date, and other time or seasonal constraints specified in contract documents.

5. Include work of subcontractors, Government interfaces, and contract milestones.

6. Schedule activities to occur as early as possible without unwarranted constraints.

7. Adjust Construction Program/schedule for seasonal weather conditions. Provide a narrative explaining the expected weather and plan for incorporation in schedule.

Consider work influenced by high or low ambient temperatures or precipitation.

Utilize Primavera P6 calendars to depict historical weather days that impact work.

Assign weather calendars to work impacted by weather.

8. Reference activities to contract line item number (CLIN) and specification section identified in the Schedule using user-defined fields.

9. Define activities to level of detail resulting in their durations being no greater than 20 workdays.

a. Durations for administrative activities (e.g., submittals and reviews) fabrication, manufacturing, and typical level of effort activities (e.g., dewatering, storm water management) will not be subject to workday duration limitation.

10. Include separate activities for submittal preparation and submittal reviews when submittal addresses work that involves significant quantities, long lead times, is on the critical path or near critical path, or as requested by the COR. Assign Government submittal review activities to a seven-day calendar with durations as

01 32 10 - 5 specified in Section 01 33 00 - Submittals. Include Required Submittal Number (RSN) in activity description.

11. Include separate activities for fabrication or manufacturing when work involves significant quantities, long lead times, is on the critical path or near critical path, or as requested by the COR.

12. Include contract title, contract number, and Contractor’s name on transmittal cover sheet and each sheet of Gantt chart.

13. For each activity on Gantt chart, display activity identification number, activity description, planned or original duration, start date, finish date, total float, and calendar identification. Do not display early start and late start fields.

14. Include table of abbreviations used in the schedule, listed and defined alphabetically.

15. Use finish to start logic relationships between activities. Do not utilize start to start, finish to finish, or start to finish logic relationships. Do not use positive or negative lead or lag times.

16. Use durations in units of whole workdays.

17. Provide best estimate of time required to complete activity considering quantity of work, work conditions, location of work, and planned resources for activity.

18. Equate durations of Government reviews and other identified actions to maximum number of calendar days specified in their respective paragraphs.

19. Establish workday calendar(s) and use these in the schedule to translate activity's workday duration into calendar dates. Use unique calendar names; do not use software default calendar names. Save calendars as project calendars, not global calendars.

B. Baseline Schedule:

1. Represents Contractor’s as-planned approach to accomplishing the work. Do not include actual start dates, percent completes, or actual finish dates.

C. Updated Schedule:

1. Meet monthly with COR at Government’s project office, or at a location approved by the COR, to review progress made to end date of progress payment period.

Establish dates that activities were started and completed and remaining duration for each activity started but not completed during the period.

a. Discuss and mutually agree upon changes to the schedule.

b. Out-of-sequence activities are not allowed. Revise logic to reflect change in work plan.

c. Finalize updated Construction Program database with mutually agreed upon changes.

01 32 10 - 6

2. Following receipt of executed contract modification, incorporate activity data stipulated in modification into current schedule for inclusion in next scheduled progress update. Provide appropriate logic relationships for revised activities.

3. Assign a unique project file name for each schedule update.

1.08 TIME IMPACT ANALYSIS

A. Provide time impact analysis for contract changes (e.g., change order, proposed modification, or value engineering change proposal) to support a claim or request for equitable adjustment to the contract due to delay or accelerated schedule.

B. The CO may use time impact analysis to determine if time extension or reduction to contract milestone dates is justified.

1. Time impact analysis is required for contract changes where the Contractor’s current schedule milestone dates are later than those required under the contract.

2. Changes, additions, or deletions to activities; activity durations; activity time frames; or activity predecessors and successors will not automatically determine that extension or reduction of contract time is warranted or due the Contractor.

3. Time extensions for performance will be considered only to the extent that the Contractor’s current scheduled milestone dates exceed contract milestone dates.

C. Float is not for exclusive use by or benefit of either the Government or the Contractor.

D. Prepare a single time impact analysis for modifications issued after Notice to Proceed (NTP) and prior to approval update.

E. Perform time impact analyses using data in most recent approved schedule update prior to change or delay event.

1. Prepare proposed revised schedule and narrative description describing and highlighting changes or delays.

2. Prepare summary comparing results of two schedule analyses: One using current schedule data from last approved updated schedule prior to event requiring analysis, and one using proposed schedule data incorporating changes or delays.

a. Show contract milestones and activities whose periods of performance have shifted as result of change which affects production and/or manufacture schedules, material orders, construction seasons, and labor and/or equipment utilization.

b. For activities directly affected by change or delay, include the current and proposed items:

1) Activity description.

2) Types and quantities of major pieces of equipment, principal manpower, and pacing materials (materials that affect activity start, duration, or finish).

01 32 10 - 7

3) Activity duration.

4) Narrative containing rationale used in developing the proposed logic relationships and activity data.

c. Data date for impacted schedule used in comparison shall be the same as approved updated schedule data date.

d. Base schedule comparisons on status of work and available float at time the CO directs or proposes change to the work, the Contractor submits a value engineering change proposal, or when a delay occurs as shown in approved updated schedule.

1.09 REVIEW AND EVALUATION

A. Baseline Schedule:

1. Within 21 calendar days after receipt of baseline schedule:

a. COR will approve or not approve proposed baseline schedule.

b. Upon request from the CO, meet with COR for a joint review of proposed baseline schedule.

c. If schedule is not approved, revise and resubmit within 7 calendar days following date of rejection letter.

2. Do not proceed with onsite work, except mobilization and surveying, until baseline schedule has been approved by the Government.

B. Updated schedules:

1. Submit updated Construction Program schedule monthly.

2. Submit updated schedule at least seven days prior to the submission of each invoice request for progress payment.

3. If updated schedule is not approved, revise and resubmit updated schedule within

7 calendar days following date of rejection letter.

4. The COR will schedule pre-submittal meeting with the Contractor’s representative each month to review draft updated schedule prior to the Contractor submitting RSN 01 32 10-3, Updated Schedule.

C. Failure to include elements of the work in schedules will not release Contractor from completing required work under the contract.

D. Performance will be evaluated by the Government using approved CPM schedules.

1.10 FAILURE TO COMPLY

A. Failure to comply with requirements of this Section shall be grounds for determination by the CO that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within specified time.

01 32 10 - 8

B. The CO may terminate the Contractor’s right to proceed with the work, or separable part of it, in accordance with default terms of this contract.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in Price Schedule A for other items of work.

1.02 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittal Types, as listed in Table 01 33 00A - List of Submittals:

D. A - Approval:

1. Government will respond as to adequacy of submittal.

2. Approval Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.

E. I - Informational:

1. The Government will acknowledge receipt of Informational submittals.

2. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.

3. Informational Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by the Government is not required.

F. CDMS: Construction Document Management System.

1.03 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-14 United States National CAD Standards, Version 6

01 33 00 - 2

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title, and RSN.

3. Measurement Units: US Customary Units.

C. Drawings:

1. Minimum Identification in Title Block:

a. Contract number and title.

b. Contractor or supplier’s title and drawing number.

c. Date.

2. Reserve 3- by 3-inch space next to title block for review stamps.

3. Print Size: D size (22 inches by 34 inches).

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.

a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.

5. Final Drawings:

a. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

6. Final Electronic Drawings: When final electronic drawings are required:

a. Drawing format: AUTOCAD, Version 2018 or later, or as approved by the

COR.

b. Compile using ‘eTransmit’ utility in AutoCAD.

c. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

d. Electronic files: On CD or DVD discs.

e. Original plots: D size (22 inches by 34 inches).

f. Government will provide an electronic AutoCAD template.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

01 33 00 - 3

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

E. Certifications:

1. Certifications by a Registered Professional: Signed and sealed by registered professional.

2. Manufacturer’s Certifications: Signed by authorized representative of manufacturer.

F. Photographs:

1. When requested.

2. Each COR requested view.

a. Include contract number, name of equipment and view title.

b. Format:

c. Digital Photographs on CD, DVD, or SDHC card in jpeg format. Four

Megapixels minimum. With accompanied prints if requested and of a size requested by the COR.

d. Prints only: Only if specifically requested.

e. Professional quality 8- by 10-inch color.

1) Identify with adhesive labels on back.

a) Do not type directly on back of photograph.

G. Samples Submittals:

1. Label with complete manufacturer's product identification.

2. Include type and quantity of materials specified in the referenced section in each

“set” of samples.

3. Samples: Representative…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .