Kachess Dam Modification Phase 3 Yakima Project, Washington, Bureau of Reclama
Solicitation number
140R1024R0002
Issued by

About this file

This synopsis describes a proposed construction contract for the Bureau of Reclamation. The project involves construction services for modifications to Kachess Dam in Washington state, including excavating the downstream dam face and foundation for a new outlet works conduit. Additional work includes installing a steel liner and bypass pipe in the existing conduit, a new plunger valve, and extending the outlet works conduit downstream. The contractor will also reconstruct portions of the outlet works channel, place embankment materials, install a filter drain system, excavate for an auxiliary drain, and perform erosion control and restoration. The solicitation will be set aside for small businesses with average annual receipts under $45 million. The estimated value is between $10-20 million. The solicitation will be posted to SAM.gov within 15 days and remain open for approximately 30 days. Interested parties must register in SAM to receive procurement opportunities from the Bureau of Reclamation and Department of the Interior.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Synopsis of Proposed Contract Action

Description

The Bureau of Reclamation, Columbia-Pacific Northwest Region, Columbia-Cascades Area Office has a need for construction services for Kachess Dam Modification Phase 3. Work is located at Kachess Dam, approximately 45 miles northwest of Ellensburg, Washington, in Kittitas County. Work is for Kachess dam outlet works construction.

Principal components of the work include:

• Mobilize to site and demobilize from site.

• Excavate downstream face of Kachess Dam and foundation in area of outlet works conduit and demolish current outlet works portal structure.

• Construct cofferdam within existing outlet works channel.

• Install and maintain unwatering systems for removal and control of water within excavations during construction.

• Maintain minimum reservoir releases during construction.

• Install government-furnished steel liner inside existing conduit and install government-furnished bypass pipe between steel liner and existing conduit.

• Install new, government-furnished plunger valve near upstream end of steel liner.

• Furnish and install new transition structure near upstream end of steel liner.

• Extend existing concrete outlet works conduit downstream and construct new portal structure.

• Re-construct portion of outlet works channel downstream of new portal structure.

• Place and compact zoned earthfill embankment materials within outlet works conduit excavation and new stability berm over outlet works conduit extension.

• Furnish and install filter drain and filter drain inspection well, including all mechanical and electrical equipment.

• Excavate trench for new auxiliary drain, place and compact new zoned earthfill materials, and furnish and install auxiliary drain, two auxiliary drain inspection wells, including all mechanical and electrical equipment, and concrete outlet structure.

• Excavate electrical trenches and furnish and install new electrical conduit.

• Construct new downstream toe approach road.

• Install erosion control measures and complete restoration activities.

The North American Industry Classification System (NAICS) code associated with this project is 237990 Other Heavy and Civil Engineering Construction. The small business size standard applicable to this project is $45.0 million in gross annual receipts averaged over the previous three 1-year accounting periods. The Rough order of Magnitude (ROM) for this project is between $10,000,000.00 and $20,000,000.00. This procurement will be competed as a total small business set-aside. Proposals will be accepted from all responsive and responsible small business concerns.

An electronic copy of the solicitation will be issued no sooner than 15 days from the day after this notice at www.sam.gov, however, dates in this notice are subject to change. The solicitation will close approximately 30 days after its issuance. Any amendments applicable to the solicitation will be posted at the same site. To take advantage of business opportunities with the Bureau of Reclamation (BOR) and the Department of the Interior (DOI) you must register your entity must be registered in SAM.gov. For more information regarding registering in SAM, please visit https://sam.gov/content/entity-registration.

http://www.sam.gov/ https://sam.gov/content/entity-registration

The primary Point of Contact for this requirement is USBR Contract Specialist, Michael Naseath, Email:

mnaseath@usbr.gov, Syndy Garcia, Email: sgarcia@usbr.gov, or the Contracting Officer, Mr. Lance Fleming, Email: Lfleming@usbr.gov.

mailto:mnaseath@usbr.gov mailto:sgarcia@usbr.gov mailto:Lfleming@usbr.gov

Synopsis of Proposed Contract Action
Description