Text version

Solicitation No. 140R1021Q0030 Commercial Item Acquisition

Title – Diving Services for Biological Sampling

Location – Minidoka Project, Idaho

Quotes are due on 20 May 2021 at 1400 Mountain Time.

Vendors shall submit the following items in response to this solicitation:

1. SF-1449, blocks 17a, 30a-30c: Complete (including Unique Entity Identifier (formerly DUNS number)), date, and sign.

2. SF-1449, complete blocks 23 and 24 for each line item.

3. Submit the appropriate information requested under section E-1 52.212-1.

The quote shall be returned to the following email address: gboyle@usbr.gov

No facsimile (FAX) quotes will be accepted.

To receive an award, vendors must submit the completed provision 52.204-24 (E.5) if your Representation and Certifications in beta.SAM.gov were completed before October 2020.

Vendor questions must be submitted and received e-mail no later than: 14 May 2021.

Only email questions will be accepted to individuals listed above.

Columbia-Pacific Northwest Region

140R1021Q0030 Diving Services for Biological Sampling of Endangered Snails i

A SF1449 ................................................................................................................................. A-1

B RESERVED......................................................................................................................... B-1

C CONTRACT CLAUSES ..................................................................................................... C-1

C.1 52.212-4 Contract Terms and Conditions – Commercial Items (Oct 2018) ................ C-1

C.2 52.252-2 Clauses Incorporated by Reference (Feb 1998) ........................................... C-1

C.3 1452.201-70 Authorities and Delegations (Sep 2011) ................................................. C-1

C.4 WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations -- Bureau of Reclamation (May 2018) ................................................................. C-2

C.5 52.204-13 System for Award Management (Oct 2018) ............................................... C-3

C.6 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) ....... C-3

C.7 52.217-8 Option to Extend Services (Nov 1999)......................................................... C-4

C.8 52.217-9 Option to Extend the Term of the Contract (Mar 2000) ............................... C-4

C.9 52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Deviation 2019-01) ................................................................................................................ C-4

C.10 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace – Bureau of Reclamation (Dec 2009) ............. C-7

C.11 1452.228-70 Liability Insurance – Department of Interior (Jul 1996) ........................ C-7

C.12 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) ............................................................................................................................... C-8

C.13 WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Feb 2017) ...... C-8

C.14 WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (Jul 1983) ...... C-13

C.15 52.252-6 Authorized Deviation in Clauses (Nov 2020) ............................................ C-13

C.16 DOI-AAAP-0028, v03 Invoice Processing Platform (IPP) – Treasury Electronic Invoicing System (Sep 2017) ............................................................................... C-13

C.17 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (Jan 2021) ............................................................ C-14

D ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS ......................... D-1

D.1 Performance Work Statement (PWS) Specifications .................................................. D-1

D.2 Department of Labor, General Wage Determination No. 2015-5515, Revision No. 12, Dated 12/21/2020, 15 Pages. ...................................................................................... D-7 ii

E SOLICITATION PROVISIONS .......................................................................................... E-1

E.1 52.212-1 Instructions to Offerors-Commercial Items (Jun 2020) ................................ E-1

E.2 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) ..................... E-5

E.3 52.204-7 System for Award Management (Oct 2018) .................................................. E-6

E.4 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) ............. E-6

E.5 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Oct 2020) ...................................................................... E-6

E.6 1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (Apr 1984) ............................................................................................................. E-9

E.7 52.212-2 Evaluation – Commercial Items (Oct 2014) ................................................ E-11

E.8 52.212-3 Offeror Representations and Certifications – Commercial Items (Feb 2021) .............................................................................................................................. E-11

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

R10

Boise ID 83706-1234

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

0009909941 CODE 16. ADMINISTERED BYCODE

X

X

561990

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORR10

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/20/2021 1400 MS

05/06/2021

208-383-2232Gwendolynn Boyle (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140R1021Q0030

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 3 0040530317OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1150 N. Curtis Road, Ste. 100

TELEPHONE NO.

17a. CONTRACTOR/

Heyburn ID 83336 470 22nd Street Upper Snake River Field Office Bureau of Reclamation-PN-SRAOE

15. DELIVER TO

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100 Acquisition Management Division Regional Office Pacific Northwest Region

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$12.00

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

Bureau of Reclamation

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

X

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Project Title: Diving Services for Biological Sampling, Snake River Area Office, Upper Snake Field Office, Snake River near Minidoka Dam, Idaho

1 AU = 12 Months

Legacy Doc #: BOR

Period of Performance: 06/01/2021 to 05/31/2026

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

Gwendolynn Boyle

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

00010 Base Period - Diving Services for Biological

Sampling in accordance with the Performance Work

Statement located in D ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS.

Product/Service Code: B509

Product/Service Description: SPECIAL

STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL

Period of Performance: 06/01/2021 to 05/31/2022

00020 Option Year 1 - Diving Services for Biological

Sampling in accordance with the Performance Work

Statement located in D ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS.

(Option Line Item)

03/01/2022

Product/Service Code: B509

Product/Service Description: SPECIAL

STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL

Period of Performance: 06/01/2022 to 05/31/2023

00030 Option Year 2 - Diving Services for Biological

Sampling in accordance with the Performance Work

Statement located in D ANY CONTRACT DOCUMENTS, Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

3 2 of

A-2

1 AU $________________

1 AU $________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1021Q0030

EXHIBITS, OR ATTACHMENTS.

(Option Line Item)

03/01/2023

Product/Service Code: B509

Product/Service Description: SPECIAL

STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL

Period of Performance: 06/01/2023 to 05/31/2024

00040 Option Year 3 - Diving Services for Biological

Sampling in accordance with the Performance Work

Statement located in D ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS.

(Option Line Item)

03/01/2024

Product/Service Code: B509

Product/Service Description: SPECIAL

STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL

Period of Performance: 06/01/2024 to 05/31/2025

00050 Option Year 4 - Diving Services for Biological

Sampling in accordance with the Performance Work

Statement located in D ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS.

(Option Line Item)

03/01/2025

Product/Service Code: B509

Product/Service Description: SPECIAL

STUDIES/ANALYSIS- ENDANGERED SPECIES: PLANT/ANIMAL

Period of Performance: 06/01/2025 to 05/31/2026

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

A-3

B-1

B RESERVED

C-1

C CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(OCT 2018)

ADDENDUM To (d): 52.233-1 is replaced with 52.233-1 DISPUTES (MAR 2014), ALTERNATE I (DEC 1991)

C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulations: https://www.acquisition.gov/browse/index/far Department of Interior Acquisition Regulations: https://www.doi.gov/pam/programs/acquisition/pamareg

C.3 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, https://www.acquisition.gov/browse/index/far https://www.doi.gov/pam/programs/acquisition/pamareg

C-2 with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

C.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S

AUTHORITIES AND LIMITATIONS -- BUREAU OF RECLAMATION (MAY

2018)

(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;

C-3 therefore, the COR does not have the authority to, and may not, issue any technical direction that

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

C.5 52.204-13 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

C.6 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (AUG 2020)

C-4

C.7 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor any time prior to end of the contract.

C.8 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor before the contract expires; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

C.9 52.219-30 NOTICE OF SET-ASIDE FOR, OR SOLE SOURCE AWARD TO,

WOMEN-OWNED SMALL BUSINESS CONCERNS ELIGIBLE UNDER THE

WOMEN-OWNED SMALL BUSINESS PROGRAM (DEVIATION 2019-01)

(a) Definitions. As used in this clause—

“Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award, and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone set- aside or sole source award under the HUBZone Program.

“Women-owned small business (WOSB) concern eligible under the WOSB Program” (in accordance with 13 CFR part 127), means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.

“WOSB Program Repository” means a secure, Web-based application that collects, stores, and disseminates documents to the contracting community and SBA, which verify the eligibility of a business concern for a contract to be awarded under the WOSB Program.

C-5

(b) Applicability. This clause applies only to—

(1) Contracts that have been set aside or reserved for, or awarded on a sole source basis to, WOSB concerns eligible under the WOSB Program;

(2) Part or parts of a multiple-award contract that have been set aside for WOSB concerns eligible under the WOSB Program; and

(3) Orders set aside for WOSB concerns eligible under the WOSB Program, under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General.

(1) Offers are solicited only from WOSB concerns eligible under the WOSB Program.

Offers received from concerns that are not WOSB concerns eligible under the WOSB Program shall not be considered.

(2) Any award resulting from this solicitation will be made to a WOSB concern eligible under the WOSB Program.

(3) The Contracting Officer will ensure that the apparent successful offeror has provided the required documents to the WOSB Program Repository. The contract shall not be awarded until all required documents are received.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Agreement. By submission of an offer and execution of a contract, a WOSB concern eligible under the WOSB Program agrees that in the performance of the contract for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;]

(2) Supplies or products (other than procurement from a nonmanufacturer in such supplies or products), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or

C-6

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.

(f) Joint Venture. A joint venture may be considered a WOSB concern eligible under the WOSB Program if—

(1) It meets the applicable size standard corresponding to the NAICS code assigned to the contract, unless an exception to affiliation applies pursuant to 13 CFR 121.103(h)(3);

(2) The WOSB participant of the joint venture is designated in the System for Award Management as a WOSB concern eligible under the WOSB Program;

(3) The parties to the joint venture have entered into a written joint venture agreement that contains provisions−

(i) Setting forth the purpose of the joint venture;

(ii) Designating a WOSB concern eligible under the WOSB Program as the managing venturer of the joint venture, and an employee of the managing venturer as the project manager responsible for the performance of the contract;

(iii) Stating that not less than 51 percent of the net profits earned by the joint venture will be distributed to the WOSB;

(iv) Specifying the responsibilities of the parties with regard to contract performance, sources of labor, and negotiation of the WOSB contract; and

(v) Requiring the final original records be retained by the managing venturer upon completion of the WOSB contract performed by the joint venture.

(4) The joint venture must perform the applicable percentage of work required in accordance with paragraph (e) above; and

(5) The procuring activity executes the contract in the name of the WOSB concern eligible under the WOSB Program or joint venture.

(g) Nonmanufacturer.

(1) Unless SBA has waived the requirements of paragraphs (g)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a WOSB concern eligible under the WOSB Program that provides an end item it did not manufacture, process, or produce, shall—

C-7

(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;

(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

(2) Paragraph (g)(1) of this clause does not apply to construction or service contracts.

C.10 WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE PUBLIC

FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL WORKPLACE –

BUREAU OF RECLAMATION (DEC 2009)

(a) In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.

(b) In addition, pursuant to Federal Management Regulation (FMR) Bulletin 2009-B1, effective December 22, 2008, smoking is prohibited in courtyards and within 25 feet of doorways and air intake ducts on outdoor space under the jurisdiction, custody or control of GSA.

C.11 1452.228-70 LIABILITY INSURANCE – DEPARTMENT OF INTERIOR (JUL

1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$200,000.00 each person

$500,000.00 each occurrence

$100,000.00 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract

C-8 services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

C.12 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

C.13 WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF RECLAMATION

(FEB 2017)

(a) General Security Requirements:

(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.

(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the CO. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.

(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.

(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.

(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.

C-9

(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.

(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities.

Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.

(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.

(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S. For all non-U.S. citizens working under this contract, irrespective of length of time working on the contract, the Contractor shall provide to the COR, legible and valid copies of the individual’s passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver’s license is not acceptable identification. In addition, a completed form I-94 shall be submitted to the COR upon the individual’s arrival at the work facility and prior to beginning work.

(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the Contracting Officer (CO). The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.

C-10

(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, inappropriate release of sensitive information, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.

(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.

(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.

(b) Information Security Requirements.

(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code: the Freedom of Information Act and the Privacy Act. Sensitive information is generally categorized as FOR OFFICIAL USE ONLY (FOUO) information or CONTROLLED UNCLASSIFIED INFORMATION (CUI), but in some cases may include other unclassified information.

(The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation directives and standards for identifying and safeguarding sensitive information (SLE 02-01), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.

(i) Any Government-furnished information or material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the CO may the Contractor retain the material. The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any

C-11 individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the CO. Prohibited dissemination or disclosure includes, but is not limited to:

permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, disclosure to Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release. The Contractor shall maintain, and furnish upon request of the CO, records of the names of individuals who have access to sensitive material in its custody. All questions regarding information security, access, and control shall be referred to the COR.

(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the CO has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases. Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the CO ten business days before the proposed date for release.

Subcontractors shall submit requests for authorization to release through the prime Contractor to the CO.

(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.

(2) Classified Information.

(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.

C-12

(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S. Government authority. Executive Order 13526, Classified National Security Information (December 29, 2009), Section 1.1.(c) states, "Classified Information shall not be declassified automatically as a result of any unauthorized disclosure of identical or similar information."

Although the Department has taken steps to prevent access to publicly disclosed classified materials from Departmental computers, it is important to understand our continuing duties and responsibilities in this regard.

(iii) Contractors (which include all employees of the contractor, as well as subcontractors and its employees performing work for the contractor) are reminded of the following obligations with respect to the treatment of classified information and the use of unclassified government information technology systems:

(iv) The contractor shall not, while using unclassified Government computers or other devices (such as phones or tablets) access documents that are marked classified (including classified documents made publicly available by a third party), as doing so risks that material still classified will be placed onto unclassified systems. This requirement does not restrict contractor access to unclassified, publicly available news reports (and other unclassified material) that may in turn discuss classified material, as distinguished from access to underlying documents that themselves are marked classified (including if the underlying classified documents are available on public web sites or otherwise in the public domain).

(v) For contracts that require access to classified information, the contractor is responsible for obtaining the required national security clearance through the Department of the Defense National Industrial Security Program Operating Manual (NISPOM). Any classified contracts will be coordinated through the Reclamation Chief Security Officer, or for IT requirements, the Bureau Chief Information Security Officer. No contractor shall access classified information unless proper clearances have been obtained and transmitted to Reclamation. For further information, refer to 443 DM 1 or DOD NISPOM 5220.22-M dated February 28, 2006 (incorporating change 2 dated May 18, 2016).

(vi) Classified information shall not be removed from official premises.

(vii) Classified information shall not be disclosed without proper authorization.

(c) RESERVED

C-13

(d) RESERVED

(e) RESERVED

(f) RESERVED

C.14 WBR 1452.242-80 POSTAWARD CONFERENCE – BUREAU OF RECLAMATION

(JUL 1983)

(a) Prior to the Contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The conference will be held via teleconference.

(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.

(d) The Contractor shall include any associated costs for attendance at the conference, in its offer.

C.15 52.252-6 AUTHORIZED DEVIATION IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Department of Interior Acquisition Regulations (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

C.16 DOI-AAAP-0028, V03 INVOICE PROCESSING PLATFORM (IPP) – TREASURY

ELECTRONIC INVOICING SYSTEM (SEP 2017)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: None https://www.ipp.gov/

C-14

The Contractor shall also submit an electronic copy of the IPP invoice to the Contracting Officer at gboyle@usbr.gov once the invoice has been submitted to IPP. Failure to e-mail the invoice may cause significant delay or possible rejection of payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

C.17 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (JAN 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115- 232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

mailto:gboyle@usbr.gov mailto:ippgroup@bos.frb.org https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

C-15

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUNE 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .