B08_Solicitation_(Attch_1_SOW_Death_Valley_Force_Main_Jetting).pdf

PDF 138 KB Posted

Attached to
DEVA - DS23 SEWER JETTING Federal contract opportunity
Solicitation number
140PS124Q0009
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a Statement of Work (SOW) for the DEVA Wastewater Main Jetting project in Death Valley National Park. The scope of work includes jetting approximately 13,000 linear feet of sewer mains in the Cow Creek and Furnace Creek areas to remove blockages, sediment, debris, and root intrusion. The objective is to clear the wastewater collection systems and correct deficiencies. The contractor will mobilize crews to Death Valley and systematically jet the sewer system from the highest to lowest points, which terminate at the lagoons. The period of performance is 60 days after award.

The related federal contract opportunity is Solicitation Number 140PS124Q0009, "DEVA - DS23 SEWER JETTING", issued by the Department of the Interior, National Park Service, Midwest Region. The solicitation is for the sewer jetting services described in the SOW.

View the file

Other files for this federal contract opportunity

Other files attached to DEVA - DS23 SEWER JETTING, newest first.
File Type Posted
B08_Solicitation_(Attch_3_Technical_Questionnaire).docx DOCX document
Sol_140PS124Q0009.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work DEVA Wastewater Main Jetting

Death Valley National Park May 23, 2024

Scope/Background/Objective

1.1 Scope of Work

- Jet the Cow Creek Sewer to remove blockages and sediment/debris.

o Cow Creek Traversing Skyline Drive from Skyline/Old Ghost/Nevares Dr Intersection to third manhole below on Old Ghost Road below Skyline Drive (approximate linear footage = 5,500 lf)

- Furnace Creek from Sunset Campground to and through Furnace Creek Campground (approximate linear footage = 7,500 LF)

- Approximate linear footage = 13,000 LF

- Jet Old Ghost Road and Skyline drive sewer mains in Cow Creek to a site determined Manhole on Old

Ghost Road.

- Jet Sewer main in Furnace Creek from Sunset campground to HQ to Furnace Creek Campground to a site determined manhole of the gravity main to the lagoon.

- Remove any roots that intrude into the collection system as they are discovered.

- TV inspection of all Jetted Main lines

1.2 Background

The Death Valley sewer systems have repeatedly been found to have sediment intrusion due to heavy rain events caused by the 2022 and 2023 floods and Hilary Hurricane event. This, along with root intrusion, causes blockages and overland sewage flows which are a violation of State Law.

1.3 Objective

Clear wastewater collection systems of debris, roots, blockages, and correct deficiencies in the community collection systems of Cow Creek and Furnace Creek.

1.4 Contractor Services

Refer to Section 1.1, Scope of Work. Contractor shall mobilize crews to Death Valley National Park and jet the sewage system in a systematic manner. Work shall progress from the highest point to the lowest point which is the lagoons. In some sections the lowest point will be a site determined manhole in the collection system that will be used to remove debris via a Vactor Truck or similar type vehicle. Root cutting shall be performed in conjunction with jetting where required. Jetting will occur from the Skyline Drive/Old Ghost Road cross streets to a site determined manhole above from the Cow Creek Lift Station, approximately 5,500 LF. The remaining area to be jetted includes from the Sunset Campground along CA190 down past the HQ building into and through Furnace Creek Campground, approximately 7,500 LF, to the site determined manhole prior to the lagoon gravity main.

1.5 Period of Performance

The overall Period of Performance will be 60 days after issuance of award.