- INSTALL VINYL GRAPHICS - GLACIER BAY NP AK
- Solicitation number
- 140PP027Q0043
- Issued by
- Not on record
About this file
This is a Statement of Work for the National Park Service, Glacier Bay National Park and Preserve, located in Gustavus, Alaska. The contract requires removal of existing law enforcement vinyl graphics and installation of Government-furnished replacement vinyl graphics on four law enforcement vehicles (Chevrolet Tahoes and four-door Chevrolet pickup trucks) and three law enforcement vessels (two approximately 38-foot vessels and one approximately 30-foot vessel). The work includes removal of existing graphics, removal of residual adhesive, surface preparation and cleaning, and professional installation of new graphics without bubbles, wrinkles, creases, or other defects. The contractor must prevent damage to vehicle and vessel finishes including painted surfaces, gelcoat, glass, trim, and hardware during all work phases.
The contractor must demonstrate experience in commercial-grade vinyl graphic removal and installation on vehicles, vessels, or comparable surfaces. Work will be performed at Glacier Bay National Park in a Government-provided climate-controlled workspace, with one vehicle or vessel available for work at a time. The contract period runs from date of award through February 2, 2027, with all work to be completed by that deadline. The contractor is responsible for providing all necessary personnel, materials, equipment, and tools except vinyl graphics and workspace, which are Government-furnished. The Government will provide lodging in Bartlett Cove for up to two contractor personnel. Work scheduling is Monday through Friday from 06:00 to 16:30, unless otherwise approved. The contractor must comply with OSHA regulations 1910 and 1926, provide a 12-month warranty on installation workmanship, and re-perform any deficient work at no additional cost. Submittals required include Contractor Qualifications due with quote and Proposed Work Schedule due within five days after award. Monthly progress payments will be made on estimates of work accomplished meeting contract quality standards; partial payment is not authorized.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140PP027Q0043.pdf | ||
| A06_Specs_-_LE_Handbook.pdf | ||
| A04_SOW_-_Replace_with_Gov-Provided_Similar.pdf | ||
| B03_Wage_Determ_-_SCA_2015-5685_Rev_31.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Glacier Bay National Park and Preserve
1 Park Road Gustavus, AK 99826
NATIONAL PARK SERVICE
REGION 11 ALASKA
STATEMENT OF WORK
NATIONAL PARK SERVICE
GLACIER BAY NATIONAL PARK & PRESERVE
REMOVE & INSTALL VINLY GRAPHICS
GUSTAVUS, ALASKA
October 1, 2026
Introduction: The project work consists of removing existing law enforcement vinyl graphics and installing Government-furnished replacement vinyl graphics on four (4) law enforcement vehicles and three (3) law enforcement vessels at Glacier Bay National Park & Preserve. The vehicle fleet consists of a combination of Chevrolet Tahoe’s and four-door Chevrolet pickup trucks. The vessel fleet consists of two (2) approximately 38-foot vessels and one (1) approximately 30-foot vessel. All replacement graphics shall be installed in accordance with
Government-provided direction and the applicable law enforcement vehicle and vessel graphics standards.
Description of site
The work will be performed at Glacier Bay National Park & Preserve in Bartlett Cove, near
Gustavus, Alaska. The Government will provide a climate-controlled workspace suitable for removal and installation of vinyl graphics on one (1) law enforcement vehicle or one (1) law enforcement vessel at a time. The Contractor shall coordinate the sequence and scheduling of individual assets with the Government to maintain access to the workspace and minimize impacts to law enforcement operations.
Objectives
The Contractor shall furnish the necessary personnel, materials, equipment, tools, and services
(except as otherwise specified) necessary to remove existing law enforcement vinyl graphics and install Government-furnished replacement vinyl graphics on four (4) law enforcement vehicles and three (3) law enforcement vessels. Work shall include removal of existing graphics, removal of residual adhesive, preparation and cleaning of application surfaces, and installation of new graphics.
Replacement graphics shall be installed in accordance with Government-provided direction and the applicable law enforcement vehicle and vessel graphics standards. Graphics shall be properly positioned and aligned and installed in a professional manner without bubbles, wrinkles, creases, lifting edges, trapped debris, or other visible defects. The Contractor shall take appropriate precautions during removal and installation to prevent damage to vehicle and vessel finishes, including painted surfaces, gelcoat, glass, trim, hardware, and other adjacent components.
All work is to be completed in accordance with this Scope of Work and other Contract
Documents, as well as all applicable Codes and Standards. Contractor shall, without additional expense to the Government, be responsible for obtaining necessary licenses and permits, and for complying with all applicable federal, state, and borough laws, codes, and regulations pertaining to the performance of the service that is to be rendered.
The Contractor shall take proper safety and health precautions to protect workers, the public, and property. The Contractor shall provide the Government all requested reports, and supporting material developed during the performance of the work. The Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness and progress of work. It is the responsibility of the contractor to verify that all the information provided in this solicitation is accurate.
Description of tasks: The work to be completed under this contract consists of the following:
1. Coordinate with the Government representative to establish the sequence and schedule for completing work on four (4) law enforcement vehicles and three (3) law enforcement vessels. Assets will be made available individually or as coordinated with the
Government.
2. Remove all existing law enforcement vinyl graphics designated for replacement from each vehicle and vessel. Removal shall be performed using methods appropriate for the underlying surface and shall not damage paint, gelcoat, glass, trim, hardware, or other vehicle or vessel finishes.
3. Remove residual adhesive and thoroughly clean and prepare all application surfaces as required for proper installation of the replacement vinyl graphics. Surface preparation products and methods shall be compatible with the existing finish and the Government-furnished vinyl graphics.
4. Prior to installation, verify graphic placement and orientation with the Government representative. Graphics shall be positioned in accordance with Government-provided direction and the applicable law enforcement vehicle and vessel graphics standards. The
Contractor shall not permanently apply graphics where placement is uncertain until clarification is provided by the Government.
5. Install Government-furnished vinyl graphics on each vehicle and vessel using appropriate professional installation methods. Completed graphics shall be properly positioned, aligned, and adhered without visible bubbles, wrinkles, creases, lifting edges, trapped debris, or other installation defects.
6. Upon completion of each asset, inspect the installation with the Government representative and correct any deficiencies attributable to installation workmanship at no additional cost to the Government. Remove and properly dispose of existing graphics, backing materials, application materials, adhesive residue, and other waste generated by the work.
General work requirements:
Required Contractor Qualifications:
The Contractor shall have demonstrated experience in the removal and installation of commercial-grade vinyl graphics on vehicles, vessels, or comparable surfaces. Personnel performing the work shall be experienced in vinyl graphic removal, surface preparation, layout, alignment, and application techniques necessary to provide a professional-quality finished installation.
Site Support: The contractor is responsible for providing written notification to the Contracting
Officer detailing any site support needs that will be requested from the National Park Service
(NPS) in advance of work to allow time for resource coordination. It is the contractor’s responsibility to provide the necessary hardware and equipment to access Government furnished utilities. A public restroom is available at the site
Site Access: Gustavus is accessible by air or water. The park is accessible by road from the
Gustavus airport and AMHS ferry dock. Park security requires that all work and site visits be prescheduled. A designated Park employee will provide access for contractor personnel and coordinate access to Government vehicles, vessels, and the Government-furnished workspace.
Contractor shall secure equipment and tools daily.
Schedule: Once given Notice to Proceed, the Contractor shall coordinate with the Government representative to establish the installation schedule. Work shall be sequenced based on availability of the Government vehicles and vessels and the Government-furnished workspace.
The Government will make one (1) vehicle or one (1) vessel available for work at a time unless otherwise coordinated.
Safety: The contractor shall prosecute the work in accordance with OSHA regulations 1910 and
1926 concerning General Construction safe working procedures.
Traffic Control: N/A
Staging Area/Worksite Timeframes: Establishment of a construction camp is not permitted. The contractor is responsible to provide written notification to the Contracting Officer detailing any staging area needs that will be requested from the National Park Service (NPS) in advance of work to allow time for resource coordination. Generally, access to the work sites and assets will be allowed Monday through Friday 06:00 to 16:30. Other times may be allowed with prior written approval from the Government representative.
Preservation of Natural Features: Confine all operations to work limits of the project, approximate location shown on drawings. Prevent damage to natural surroundings. Do not fasten ropes, cables, or guide wires to existing trees.
Environmental and Cultural Compliance:
N/A
Cleanup: The worksite and any onsite staging areas shall be a neat and workmanlike manner;
trash shall be disposed of daily. Once the work under this project is complete the contractor shall perform a final cleanup of all worksite and staging areas. The contractor shall remove and dispose of all damaged and unused material from site.
Government Furnished Items: The Government shall provide all vinyl graphics required for installation. The Government shall provide a climate-controlled workspace suitable for performing the work on one (1) vehicle or one (1) vessel at a time. The Government will provide applicable law enforcement vehicle and vessel graphics standards and direction for placement and orientation of the Government-furnished graphics.
The Government shall provide lodging in Bartlett Cove for up to two (2) contractor personnel for the duration of the onsite work.
Re-performance of Service: When service performed does not conform to contract requirements, or when service was not performed in a specific area, the contractor shall perform or re-perform the service in conformity with contract requirements at no additional cost to the government.
Non-Payment for Additional Work: Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed
Contracting Officer, except as may be explicitly authorized, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the
Government to a change in specifications, contract terms, or conditions.
Quality Assurance: The Government may utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this Scope of Services in an acceptable manner. The use or nonuse of any quality assurance methods by the Government will not constitute a waiver of or excuse from contract requirements. The Government may implement or change quality assurance measures at any time during the term of the contract. Surveillance methods may include 100% inspection, periodic inspection, random sampling, or customer input.
Warranty Period: The Contractor shall warrant the installation workmanship for a period of twelve (12) months from the date of Government acceptance. The Contractor shall correct, at no additional cost to the Government, defects resulting from improper installation, including lifting, peeling, bubbling, wrinkling, or other installation-related failures. This warranty does not apply to damage caused by normal wear, impact, abrasion, environmental exposure, or defects in
Government-furnished vinyl graphics.
Period of Performance: The period of performance for the resultant contract shall be from date of award through 2 February 2027. All work shall be completed and accepted by the Government no later than the same 2 February 2027.
Submittals:
Contractor Qualifications – due with quote.
Proposed Work Schedule – due within five (5) days after award.
POINT OF CONTACT:
Government Park Representative for Technical Support:
Dan Sprague daniel_sprague@nps.gov
Contracting Officer for Contractual Support:
Ron Bunch
Ronald_bunch@ios.doi.gov
SUBMIT INVOICE(S) TO:
Submit the original invoice to the Invoice Processing Platform (IPP), https://www.ipp.gov/ and a copy, via email, to the Government representative.
Monthly Progress payments shall be made on this Contract on estimates of work accomplished which meets the standards of quality established under the contract.
Partial Payment will not be authorized for this contract.
Contracting Officer’s Authority:
The Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:
(1) direct or negotiate any changes in the Statement of Work or specifications;
(2) modify or extend the period of performance;
(3) change the delivery schedule; or
(4) otherwise change any terms and conditions of this contract.
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and not withstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
ATTACHMENTS:
Attachment 1: 2026 NPS Law Enforcement Vehicle Handbook Attachment 2: Examples/Photographs of Current Vehicle and Vessel Graphics to be Removed https://www.ipp.gov/