Atch01_SOW_Telehandler_Rental_Updated.pdf
PDF 96 KB Posted
- Attached to
- Telehandler Rental - Yosemite National Park
- Solicitation number
- 140PP027Q0041
- Issued by
- Not on record
About this file
This is a Statement of Work (SOW) for telehandler rental services at Yosemite National Park. The National Park Service (NPS) requires the rental, delivery, and pickup of one JLG 1055 telehandler or equivalent equipment to support projects throughout the park for a one-year rental period beginning upon delivery and acceptance. Delivery must occur as soon as practicable after award but no later than 21 days from receipt of order and must be coordinated with the NPS point of contact. The equipment must be delivered to and picked up from 5083 Foresta Road, El Portal, California 95318, with at least 48 hours advance scheduling required. Deliveries and pickups are not accepted on Fridays, weekends, or Federal holidays unless preapproved by NPS.
The telehandler must meet or exceed specific minimum capabilities: safe lifting and handling of at least 2,000 pounds, vertical lift height of at least 35 feet, horizontal reach of at least 35 feet while handling a 2,000-pound load per manufacturer's load chart, and capability to handle and transport 40-foot wooden beams weighing between 2,000 and 4,000 pounds. The equipment must be equipped with outriggers, crab-steer/crab-walk capability, standard pallet forks, and configured for maneuvering in tight turns and rough terrain. The contractor shall deliver equipment in safe, clean, fully operational condition and perform routine maintenance and repairs at no additional cost, except for damage caused by Government negligence or misuse. NPS will provide fuel for equipment operation during the rental period, while the contractor is responsible for fuel related to delivery, pickup, maintenance, and transportation. The contractor bears all transportation, loading, unloading, permits, and related costs. The Government will not be charged rental fees during periods of contractor-responsible mechanical failure. Quotations must include manufacturer and model identification, current product literature, technical specifications, manufacturer's load charts, and proposed delivery timeframe, with failure to provide sufficient documentation resulting in technical rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140PP027Q0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Telehandler Rental - Yosemite National Park
STATEMENT OF WORK
Telehandler Rental
Yosemite National Park
1. Description
Yosemite National Park (NPS) requires the rental, delivery, and pickup of one JLG 1055 telehandler or equal equipment in support of projects throughout Yosemite National Park. Proposed equal equipment shall meet or exceed all minimum capabilities stated in this Statement of Work.
2. Period of Performance
The rental period shall be one year beginning on the date the equipment is delivered and accepted by the Government. Delivery is required as soon as practicable after award but no later than 21 days of receipt of order and shall be coordinated with the NPS point of contact. The specific delivery date will be established by mutual agreement after award.
3. Minimum Equipment Requirements
The contractor shall furnish a JLG 1055 telehandler or equal that meets or exceeds the following minimum requirements:
• Capable of safely lifting and handling a load of at least 2,000 pounds.
• Capable of a vertical lift height of at least 35 feet.
• Capable of a horizontal reach of at least 35 feet while handling a 2,000-pound load, as demonstrated by the manufacturer's load chart.
• Capable of handling and transporting 40-foot wooden beams weighing between 2,000 and 4,000 pounds, subject to the manufacturer's operating instructions and load chart.
• Equipped with outriggers.
• Equipped with crab-steer/crab-walk capability.
• Configured for maneuvering at the job site, including tight turns and rough-terrain operation.
• Provided with standard pallet forks.
• Compliant with applicable Federal, state, and local transportation and operational requirements.
4. Equipment Condition and Maintenance
The equipment shall be delivered in safe, clean, fully operational condition and maintained in accordance with the manufacturer's recommendations and normal commercial rental practices. The contractor shall perform routine maintenance and repairs ordinarily included with the rental at no additional cost to the Government, except for damage caused by Government negligence or misuse. The contractor shall coordinate maintenance activities with the NPS point of contact to minimize disruption to Government operations.
5. Fuel
NPS will provide fuel required for operation of the telehandler during the rental period. The contractor remains responsible for fuel required for delivery, pickup, maintenance, or contractor-operated transportation of the equipment.
Telehandler Rental - Yosemite National Park
6. Equipment Downtime
If the telehandler becomes inoperable through no fault of the Government, the contractor shall promptly notify the NPS point of contact and begin repair or replacement efforts as soon as practicable. The contractor shall provide an estimated restoration or replacement timeframe and keep NPS informed of status until service is restored. The Government will not be charged rental fees for periods when the equipment is unavailable for use due to contractor-responsible mechanical failure.
7. Delivery and Pickup
Delivery and pickup shall be made at:
5083 Foresta Road El Portal, CA 95318
Delivery and pickup shall be scheduled at least 48 hours in advance with the NPS point of contact.
Unless preapproved by NPS, deliveries and pickups will not be accepted on Fridays, weekends, or Federal holidays. The contractor is responsible for all transportation, loading, unloading, permits, and related costs necessary to deliver and retrieve the equipment.
8. Travel Restrictions
Vehicles over 45 feet are prohibited. One-way controlled traffic is in effect for other vehicles approximately 20 miles east of Mariposa, Mariposa County, 24 hours per day, seven days per week, due to rockslide repairs. Highway 41 leading to Wawona may close during inclement weather. The contractor shall verify current road conditions through the Caltrans website before hauling. These delays and restrictions are existing conditions within the park and will not be grounds for additional compensation.
9. Contractor Submittals with Quotation
The quoter shall submit sufficient documentation demonstrating that the proposed telehandler meets or exceeds all minimum requirements in this Statement of Work. At a minimum, the quotation shall identify the manufacturer and model number and include current product literature, technical specifications, and the applicable manufacturer's load chart. The submitted information shall clearly demonstrate lift capacity, vertical lift height, horizontal reach while carrying a 2,000-pound load, steering configurations, outrigger configuration, included pallet forks, and all other required salient characteristics. The quotation shall also identify the proposed delivery timeframe. Failure to provide sufficient documentation for the Government to verify compliance may result in the quotation being determined technically unacceptable.
| 1. Description |
| 2. Period of Performance |
| 3. Minimum Equipment Requirements |
| 4. Equipment Condition and Maintenance |
| 5. Fuel |
| 6. Equipment Downtime |
| 7. Delivery and Pickup |
| 8. Travel Restrictions |
| 9. Contractor Submittals with Quotation |
File details come from the government source that posted it. Updated .