About this file
This file is a Question and Answer document from Amendment 003 to a federal contract opportunity. It addresses traffic control requirements for invasive species treatment work at two locations within Colonial National Historical Park in Yorktown, Virginia: the Route 238 site and Windmill Point along Mathews Street.
The government response clarifies that contractors must use standard shoulder work zone signs per the Virginia Work Area Protection Manual rather than obtain a VDOT land use permit, provided all equipment remains off travel lanes. The government does not anticipate equipment needing extended periods in travel lanes. The contractor is responsible for coordinating directly with VDOT and paying any associated permit fees. The government did not confirm whether the park has an existing VDOT contact for these locations, indicating contractors should establish their own coordination with VDOT.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140PP027Q0036
Amendment 003
RFI 17
17. The SOW calls for VDOT approval and MUTCD signs and cones at the Route 238 site and at Windmill Point along Mathews St. Will a VDOT land use permit be required for this work, or will standard shoulder work zone signs per the Virginia Work Area Protection Manual be acceptable as long as all equipment stays off the travel lanes? Also, does the park already have a VDOT contact for these two locations, and will the contractor be responsible for any VDOT permit fees?
Government Response: As it relates to traffic control in the two areas where it may be needed, standard shoulder work zone signs per the Virginia Work Area Protection Manual are acceptable as long as all equipment stays off the travel lane. We don't anticipate any equipment will need to be in any travel lanes for extended periods of time. The contractor will be required to coordinate with VDOT and pay any fees if necessary.
File details come from the government source that posted it. Updated .