Statement of Work Summary

This is a Statement of Work (SOW) dated November 5, 2026, for elevator and vertical platform lift inspection, testing, and preventive maintenance services at the First Ladies National Historic Site in Canton, Ohio, issued by the National Park Service Midwest Region.

The contract covers three pieces of equipment: a seven-stop Schindler hydraulic elevator and a two-stop Savaria V1504 vertical platform lift at 205 Market Avenue South, and a four-stop Dover hydraulic elevator at 331 Market Avenue South. The contract duration is five years (base year plus four option years) with an optional six-month extension. The contractor must provide complete inspection, testing, and preventive maintenance services including all labor, management, supervision, tools, materials, and replacement parts necessary to maintain safe, reliable, code-compliant elevator operation. Monthly inspections are required, with the contractor performing 12 maintenance visits annually. The contractor must comply with ASME A17.1 and ASME A18.1 safety codes and ensure elevator downtime does not exceed 3 percent annually. Scheduled maintenance occurs Monday through Friday, 7:00 AM to 5:00 PM, excluding federal holidays. Emergency response (entrapment/critical failure) must occur within two hours; urgent calls within four hours or by 8:00 AM the next business day; routine calls within two business days. The contractor must maintain a staffed dispatch line 24/7 and provide training to government personnel. All work requires prior written approval from the Contracting Officer and Contracting Officer's Representative (COR). Repairs outside the scope of inspection and preventive maintenance require separate sole-source procurement. Regular-time callback service is included with the monthly cost; overtime callback services are charged at the difference between regular and overtime billing rates. The contractor accepts all equipment as-is, including obsolete components. Excluded items include vandalism, cab refinishing, underground piping/cylinders, disconnect switches, generators, and ropes. Personnel must be journeyman-level mechanics with current licenses. Parking is designated behind and adjacent to 331 Market Avenue South, with specific restrictions on visitor spaces, loading zones, and fire lanes.

View the file

Other files

File Type Posted
Sol_140PP027Q0026.pdf PDF
B08_Solicitation-Price_Schedule.xlsx XLSX spreadsheet
B03_DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

First Ladies National Historic Site

Canton, Ohio

Statement of Work (SOW)

Elevators and Vertical Platform Lift Inspection, Testing, and Preventive Maintenance Services

DATED:

November 5, 2026

NATIONAL PARK SERVICE

MIDWEST REGION

Contract Type: Elevator and Vertical Lift Inspection Contract

Location: 205 Market Ave. S. (Elevator & Vertical Lift) and 331 Market Ave. S. (Elevator Only), Canton, OH 44702

Contract Duration: 5 Years (Base + 4 Option Years), plus optional 6 month extension

1. Overview The Contractor shall provide complete elevator inspections, testing, and preventative maintenance service associated with inspection, including all labor, management, supervision, tools, materials, and replacement parts necessary to sustain safe, reliable, code-compliant elevator operation. One 7 stop Schindler elevator and one 2 stop Savaria platform lift are located at 205 Market Ave S and one 4 stop Dover elevator is located at 331 Market Ave S. Canton, OH

This work ensures all elevator systems remain in optimum condition, prevents

2. Contractor Requirements

2.1 Minimum Standard of Work

The Contractor shall perform all tasks to meet or exceed industry standards and ensure the elevator remains fully functional, safe, and free from premature wear.

Workmanship shall reflect professional elevator industry standards. Sloppy work, incomplete PM tasks, skipped items, or improper documentation shall be grounds for rejection of services and non-payment.

2.2 Staffing & On Site Requirements

Adequate qualified elevator mechanics must be available to fully support contract requirements.

Personnel must comply with all laws, codes, and site regulations.

Contractor personnel shall check in with the COR or appointed inspector upon arrival and check out prior to leaving the site. Failure to check in may result in non-payment for services performed. A schedule will be adhered to by the COR and the Contractor.

The Contractor shall maintain a Quality Control Program that ensures compliance with this SOW. The program must include internal checklists, supervisory review, and documentation of corrective actions for recurring deficiencies.

2.3 Working Hours

Scheduled maintenance: Monday Friday, 7:00 AM 5:00 PM. No scheduled maintenance shall occur on Federal Holidays.

Entrapment response is included in the monthly cost. Non-entrapment after-hours service shall be billed per Section 7.1.

Communications & Dispatch, Contractor must maintain a staffed dispatch line 24/7 for receiving calls and dispatching technicians.

2.4 Response Times

Emergency Calls (Entrapment / critical failure): Onsite within 2 hours Urgent Calls: Onsite within 4 hours, or by 8:00 AM next business day if after

1:00 PM

Routine Calls: Response within 2 business days

2.5 Repair Completion Requirements

The Contractor shall not perform or bill for repairs under the monthly inspection or PM rate without prior written approval from the Contracting Officer (CO) and COR. Any repair beyond what is considered part of the inspection, testing, and preventative maintenance (5.4) will be a separate sole source contract. An estimate will have to be provided by the vendor and then a separate repair SOW and funded PR from the park.

2.6 Equipment Acceptance

Contractor accepts all equipment as is, including obsolete components that must still be maintained.

2.7 Excluded Items

Some equipment is excluded from full-service coverage, including vandalism, cab refinishing, underground piping/cylinders, disconnect switches, generators, and ropes (if applicable).

2.8 Elevator and Platform Lift Code Compliance and Performance Requirements

The Contractor shall ensure that all work performed under this contract complies with the current ASME A17.1 Elevator Safety Code and ASME A18.1 Platform Lift Safety Code. At a minimum, the Contractor shall inspect and maintain the following system performance elements: rated speed and capacity, ride quality, door operations, emergency system functionality, and fire service functions. The Contractor shall ensure that elevator downtime does not exceed 3% annually, and no upward trend in downtime or service interruptions shall be permitted.

2.9 Subcontractors

The Contractor shall not engage or use the services of subcontractors in performing any work under this contract unless the Park grants prior approval in writing.

2.10 Parking Information

Parking for contractor personnel, service vehicles, and equipment is available behind and adjacent to 331 Market Ave S., Canton, OH 44702. The Contractor shall utilize these designated parking areas when accessing the Saxton House elevator site to ensure clear visitor pathways and compliance with site traffic requirements.

The following parking restrictions apply to all Contractor personnel and service vehicles:

No parking is allowed in visitor parking spaces, reserved Government vehicle spaces, loading zones, or fire lanes.

Service vehicles shall not block sidewalks, building entrances, emergency exits, or ADA accessible pathways.

Idling of service vehicles shall be kept to a minimum and must comply with local regulations.

Oversized or trailer towed equipment must be coordinated with the COR prior to arrival to ensure adequate space and safety.

The Contractor is responsible for any damage caused by vehicles, equipment, or personnel to pavement, curbs, landscaping, or structures.

3. Personnel Qualifications Mechanics must have recognized journeyman level training and licensing where applicable. Copies of licenses must be submitted to the COR.

3.1 Training Requirements

The Contractor shall provide training to Government personnel on the authorized use of equipment and any procedures they are allowed to take for safety and/or emergency purposes. This training shall ensure Government personnel understand their permitted actions, limitations, and proper safety protocols when interacting with elevator equipment. Contractor shall submit updated technician licenses annually or whenever personnel changes occur

4. Supplies & Materials

4.1 Government Provided

Storage space (as available) Existing elevator drawings/specifications (if available)

4.2 Contractor Provided

o Parts required for normal preventive maintenance (lamps, fuses, small hardware, lubrication, minor electrical components) are included in the contract unless listed under Section 2.8 Excluded Items.

o Contractor tools shall be OEM approved and suitable for elevator work.

Homemade or modified tools are prohibited.

o All replacement parts furnished under this contract shall include the equivalent.

o Only the inspection activities and preventive maintenance tasks defined in Section 5.4 shall be performed under this contract. Any work outside of this scope including repairs, part replacements, adjustments, code mandated corrections, or modernization must not be performed without prior Contracting Officer and COR approval and must be acquired under a separate procurement.

5. Inspections, Tests, and Preventative Maintenance The Contractor shall document each deficiency with photos per Section 7.2 and classify according to the severity levels listed below.

Preventative Maintenance ensures safe, reliable operation and prevents deterioration.

5.1 Government Inspections

The Government may inspect equipment at any time.

5.2 Safety Deficiencies

Any safety hazard must be reported immediately and the elevator removed from service until resolved.

5.3 Scheduled Inspections

Contractor shall:

Provide a mechanic during all Government inspections

Preventative Maintenance (PM) will be done immediately as part of monthly inspections.

Elevators and vertical platform lift equipment shall be inspected monthly.

Annual Inspections completed in compliance with ASME 17.1 and ASME 18.1 Inspection records shall be kept for permanent retention on site.

The COR will place the elevator out of service when required, using appropriate lockout/tagout procedures.

5.4 Inspection and Preventative Maintenance

5.4.1 Items of Inspection and Preventative Maintenance for Elevators

205 Market Ave S and 331 Market Ave S o Monthly Fire Service Test as listed in the Schindler Maintenance Control

Program for Hydraulic elevators 2/2/18 version.

o Maintenance as listed in the Schindler Maintenance Control Program for

Hydraulic elevators (2/2/18) version and Maintenance Control Program.

o Hydraulic Category 1 Tasks on an annual basis per as listed in the

Schindler Maintenance Control Program for Hydraulic elevators 2/2/18 version.

The preventive maintenance and inspection tasks included in this section reflect the manufacturer specified MCP tasks for hydraulic elevators and the periodic test requirements defined in ASME A17.1.

Monthly Inspection and Preventive Maintenance Tasks o The Contractor shall perform and not limited to all monthly inspection and preventive maintenance activities required to ensure the safe and reliable operation of the elevator system. Monthly tasks include checking hoistway access switches and car equipment; lubricating guide rails as needed; inspecting oil buffers, cylinder corrosion protection, the safety bulkhead, overspeed valve, gland packings, seals, and any evidence of oil leakage; and cleaning the water hydraulic plunger, hoistway, pit, and car top, including maintenance of the door operator. In the machine room or controller space, the Contractor shall inspect overall conditions, verify relief valve settings and pump unit operation, check tank levels, record oil usage, inspect flexible hoses and fittings, clean pressure tanks, confirm proper liquid levels, and ensure the anti creep function is operating correctly. For the car and door systems, the Contractor shall inspect the emergency system and cab interior;

maintain door reopening devices; check door closing force, stopping accuracy, and ride quality; inspect clutches, cams, rollers, car door electrical contacts, interlocks, door restrictors, door escutcheons, hoistway door interlocks, vision panels, grilles, door hangers, tracks, rollers, astragals, bumpers, sills, bottom guides, and interconnecting door devices; and verify the condition and proper operation of all door closers.

Category 1 Annual Safety Tests o The Contractor shall perform all Category 1 annual safety tests in accordance with ASME A17.1 requirements. These tests shall include and not limited to verifying the relief valve setting and system pressure;

inspecting hydraulic cylinders and pressure piping; testing normal terminal stopping devices, governors, safeties, and oil buffers; verifying nd standby or emergency power features; testing door power operation and emergency terminal stopping devices; checking low oil protection functions;

inspecting flexible hose assemblies and pressure switches; and completing the required power door operation test.

Five year Safety Tests o The Contractor shall perform all required five year safety tests in accordance with ASME A17.1. These tests shall include and not limited to verifying the relief valve setting and system pressure; inspecting hydraulic cylinders and pressure piping; testing normal terminal stopping devices, governors, safeties, and oil buffers; verifying the proper function of and standby or emergency power systems; testing door power operation and the emergency terminal stopping device; checking low oil protection operation; inspecting flexible hose assemblies and pressure switches; and completing the required power door operation test. In addition, the Contractor shall inspect unexposed portions of the piston and evaluate pressure vessels as required for hydraulic elevator systems.

5.4.2 Items of Inspection and Preventative Maintenance for vertical platform lift

The Contractor shall perform all required maintenance tasks for the Savaria V and the frequencies applicable to commercial installations. All work shall be consistent with the tasks identified below and with the maintenance schedule

Maintenance Schedule as referenced in V-1504 Installation Guide Part Number 000691.

o Door, Interlock, and Safety Movement Inspections.

The Contractor shall verify the correct function of all doors, gate, and interlock systems. This verification shall confirm that the lift will not move unless all doors are closed and locked, including units equipped with interlocks or GAL locks, and that the lift will not travel beyond the door-zone limit, approximately four inches from the landing, unless the door lock is engaged. The Contractor shall test each door lock to ensure that the lift operates only when the door is locked, does not operate when the door is open, and remains inoperable when the door is manually unlocked with the key, which shall not be removable from the lock while it is unlocked. The Contractor shall also verify that all doors and gates are self-closing and that all aluminum, Plexiglas, or glass filler panels are securely fastened.

o Safety System Verification The Contractor shall inspect and test the underpan safety device, including verification of the shoring pins; the operation of the emergency stop button; the functionality of the emergency phone, where equipped; and the performance of the safety brake.

o Suspension System Maintenance The Contractor shall inspect the entire suspension system, including the chains and connecting links, chain pulleys and shafts, all components securing the chains to the roller supports, and the rail-mounted chain tensioners to ensure they are properly tightened.

o Hydraulic and Mechanical Component Inspections The Contractor shall inspect and maintain all hydraulic and mechanical components, including the cylinder head assembly for proper cotter pins, cracks, and weld integrity; the up relays or solenoids to ensure that no normally open contacts are stuck in the activated position, using a multimeter for verification; all hydraulic system components for oil leaks; and the rollers for proper condition and rotation.

o Hand-free Autodialer The Contractor shall maintain the Follow Hands free Auto Dialer

(Part No. 000836) by performing a functional test during each inspection visit to ensure the unit successfully places an emergency call and supports two way communication. The Contractor shall check the backup power supply, verify communication connectivity (cellular or landline), and inspect the device for secure mounting, intact wiring, and signs of damage. An annual full emergency communication test shall also be performed. All results and deficiencies shall be documented and reported to the COR.

o ProAuto Door Operator III (7POT PCB) The Contractor shall inspect and maintain the Savaria ProAuto

Door Operator III, including its 7POT control board, to ensure safe and reliable automatic door operation. This includes checking door opening and closing speeds, hold open time, reversal sensitivity, and motor force; inspecting wiring, mounting hardware, and mechanical linkages; and confirming smooth door movement without slamming or hesitation. The Contractor shall test the door reversal safety function and make adjustments only as needed to maintain proper and code compliant operation o Frequency of Inspection (Commercial Installations) The Contractor shall perform all tasks listed above at least every month. All findings and deficiencies shall be documented and reported to the COR.

5.5 Code Testing

All required testing shall be performed per ASME A17.1. ASME 18.1. Contractor must:

Schedule testing at least 72 hours in advance for monthly, annually and 5-year inspections and testing.

Conduct tests in presence of COR.

Repair any test related damage at no cost to the Government.

5.6 Record Keeping

Records must be computerized and available to the Government upon request. A physical copy will be kept on site with the elevators. Monthly visit expectations (12 maintenance visits per year). COR must be present for each inspection.

Inspection checklist for each unit Document all deficiencies found (with photos) Actions taken Parts used/replaced Recommendations Technician name & license Arrival/departure times

6. Repairs

Any repairs needed not part of the PM Inspections (5.4) will be separate sole source contract upon COR and CO approval

7. Service Call Requirements A Service Call is a report of an elevator malfunction made by Government personnel or correction of, the problem. If the COR is unavailable, and appointed Inspector may act as an alternative representative.

A service call report must include:

Problem description Corrective action taken Completion time/date

7.1 Callbacks

Regular time callback service is included in the contract at no additional charge. If the Park requires examinations, minor preventative maintenance, or adjustment callback services outside of regular working hours, the Park shall be charged only the difference for each overtime hour worked.

Service Calls for entrapment (4 times year)-Emergency rescue for passengers trapped in the elevator or elevator stuck between floors. Emergency calls are for entrapment only (4 times a year)

7.2 Photo Documentation

The Contractor shall provide photo documentation for all service calls, repairs, safety deficiencies, and corrective actions where visual evidence is beneficial to verify conditions, completed work, or deficiencies.

Photo documentation shall clearly identify the equipment, location, and date. Each deficiency shall be photographed before and after correction. No invoice or service report will be accepted without required photo documentation

Photo documentation shall:

Clearly show the issue identified and the corrective action taken.

Include before-and-after images when applicable.

Be attached to the service call report or inspection summary submitted to the

COR.

to the Government upon request.

8. Safety & Health Requirements All work shall comply with applicable safety and environmental requirements, including OSHA 29 CFR 1910/1926 and EPA 40 CFR 761. While federal buildings are exempt from certain state and local code enforcement, the Contractor is still fully responsible for adhering to all applicable federal safety regulations and for providing all required safety equipment necessary to perform the work safely. The Contractor shall not perform outdoor work during lightning, severe weather, or any other unsafe conditions.

9. Green Procurement Requirements NPS requires environmentally preferable products when feasible. Contractor shall prioritize:

EPA CPG listed products GSA environmental product listings USDA bio based materials

10. Elevator and Vertical Platform Inventory

205 Market Avenue South Visitor Center

Passenger Elevator (Schindler) GO# 07903-01

Seven Floors Motor: 40 HP Speed: 125 ft/min Capacity: 2,000 lbs.

Stops: 7 Travel: ~80 ft Controls: Schindler Machine: Schindler Drive: LMC Drive Pump (Hydraulic)

ADA Vertical Platform Lift Savaria V1504

Speed: 20 fpm; Rated Load: 750 lbs.; Suspension: 2:1 chain/hydraulic; Install Date: Oct 2022; Location: Indoor

Platform lifts are governed under ASME A18.1.

Two floor

331 Market Avenue South Saxton House

Passenger Elevator (Dover Hydraulic Power Unit (Model EP 95 20 + Induction Motor Model 590AF1))

HOIST MOTOR

o Model No.: 590AF1 o Serial No.: 20L627 o Dover Part No.: 7502AB2

HYDRAULIC POWER UNIT (Dover Rota Flow®) o Model No.: EP 95 20 o Serial No.: FE5174 o Date of Manufacture: 5/27/94

Four floors Horsepower: 20 HP Speed: 125 ft/min Capacity: 2,100 lbs.

Stops: 4 Travel: ~50 ft Controls: Dover Machine: Dover

11. Definitions Emergency Call: Entrapment or inoperable elevator affecting site operations.

Urgent Call: Non entrapment safety concern or malfunction impairing performance.

Routine Call: Noncritical issue; elevator remains operational.

Act of God: Natural events beyond reasonable control (e.g., tornado, earthquake).

Monthly Inspection: A visual and functional operational Inspect without cleaning, lubrication, adjustments, or part replacements

Preventive Maintenance (PM): Handson service activities including cleaning, lubrication, adjustments, testing, and all PM tasks listed in Section 5.4 performed as part of the monthly inspection visit.

Category 1 (Cat 1) elevator inspection is a mandatory annual safety, and operational test performed every 12 months under the ASME A17.1 Safety Code for Elevators and Escalators

Cat 5 (Category 5) elevator test is a comprehensive, full-load, and full-speed safety examination required every 5 years under safety standards like ASME A17.1

Elevator Equipment: All components of the elevator system, including the car, hoistway, machine room or control space, hydraulic power unit, valves, controllers, wiring, doors, safety devices, and communication systems.

Contractor: The vendor awarded this contract and responsible for performing all inspection and preventive maintenance tasks as defined in the SOW.

Authority Having Jurisdiction (AHJ): The regulatory authority responsible for enforcing elevator code compliance, including review or witnessing of annual and five year tests.

Maintenance Control Program (MCP): The manufacturer-specified maintenance program required by ASME A17.1 Section 8.6, which identifies maintenance tasks, frequencies, tests, and record keeping requirements for elevator systems.

Deficiency: Any condition, malfunction, abnormality, or code violation requiring corrective action.

Corrective Maintenance: Any repair, adjustment, part replacement, troubleshooting, modernization, or other activity not included in inspection or PM tasks. Corrective work requires prior COR and CO approval and separate procurement.

Major Repair: A repair requiring replacement of components, hydraulic piping work, control system intervention, or work affecting safety devices. Major repairs are not included in this contract unless separately authorized.

Routine Repair: A minor corrective action that does not affect safety critical components and does not alter equipment configuration. Routine repairs require COR approval unless otherwise stated.

Shutdown: Any period during which the elevator is removed from service due to malfunction, unsafe condition, testing, or direction of the COR or AHJ.

Return to Service: Restoration of the elevator to operational status following correction of deficiencies, required testing, or completion of authorized work.

Qualified Elevator Personnel: Individuals meeting the requirements of ASME A17.1 Section 8.6.1.6 and possessing all licenses or certifications required within the applicable jurisdiction.

Test Witnessing: The presence of the COR or AHJ during Category 1 or Category 5 tests, as required by code or by this contract.

Original Equipment Manufacturer (OEM): The company that produced the elevator or its major components (e.g., Schindler), whose maintenance instructions form the basis of the MCP.

12. Scheduling Requirements The Contractor shall adhere to the following scheduling requirements:

All maintenance, inspections, testing, and repairs shall be scheduled in coordination with the COR.

Contractor shall provide at least 5 business days advance notice for any planned service that requires elevator shutdown.

Emergency work does not require prior scheduling but must follow response time requirements outlined in Section 2.5.

A monthly service calendar shall be submitted to the COR detailing planned maintenance visits, anticipated testing, and any projected repair activities.

Any deviation from the approved schedule must be communicated to the COR as soon as possible, along with justification and proposed rescheduling.

Contractors shall ensure minimal disruption to site operations, prioritizing after-hours work when required.

The Contractor shall provide a written monthly schedule to the COR no later than the 1st business day of each month

Missed PM visits shall be rescheduled within 5 business days. Repeated failures may result in withholding of payment or corrective action.

After-hours work requires prior written approval from the COR unless responding to an entrapment.

13. Safety Testing Requirements The Contractor shall perform all safety testing required to ensure the continuous safe operation of all elevators covered under this contract. Safety testing requirements include:

Conducting all safety tests in accordance with ASME A17.1 Safety Code for Elevators and Escalators testing, periodic functional testing, and full-load safety tests.

Providing at least 72 hours advance notice to the COR prior to any scheduled safety testing.

Ensuring all required safety tests are conducted in the presence of the COR or designated representative.

Completing five-year full-load tests and making all necessary adjustments to verify proper safety device function.

Performing corrective work resulting from safety testing and ensuring that any guide rail damage caused by safety device engagement is smooth or repaired.

Repairing any damage caused by testing at no additional cost to the Government.

Documenting all safety tests, including procedures performed, results obtained, deficiencies found, and corrective actions completed.

Maintaining testing records in accordance with Section 5.6 (Preventive Maintenance Recordkeeping) and making all testing documentation available to the Government upon request.

Contractor shall not disable, bypass, or modify any safety device except as required for testing and only with COR approval.

14. Safety Certification Letters After completion of all required safety tests, the Contractor shall provide a Safety Certification Letter confirming that the elevator complies with all applicable ASME A17.1 and A18.1 safety requirements. The certification letter shall:

Be issued within 5 business days following completion of testing.

Identify all tests performed and any corrective actions taken.

Confirm that all deficiencies have been corrected and the elevator meets current safety code requirements.

Be signed by a qualified elevator mechanic or inspector authorized to certify compliance.

Be submitted to the COR and maintained as part of the official maintenance and testing records.

15 Photographs

15.1 Passenger Elevator (Schindler)

15.2 ADA Vertical Platform Lift Savaria V1504

15.3 Dover

End of Document**